Federal contract award

80KSC023FA155

ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS541330 — Engineering Services
PSCC214 — A&E Management Engineering Services
Parent award / vehicle80KSC022DA121
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$228.6K
Current contract value$228.6K
Potential contract value / ceiling$228.6K
Start dateAug 18, 2023
Current end dateApr 30, 2026
Potential end dateApr 30, 2026
Latest award activityDec 19, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 19, 2025P00006$8.9KBOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC).
Sep 26, 2025P00005$12.9KBOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC).
Sep 12, 2025P00004$8.1KBOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC).
Jan 13, 2025P00003$0BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC). CORRECTION OF END DATE OF PERIOD OF PERFORMANCE BACK TO DECEMBER 5, 2025 AT $0. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Dec 1, 2023P00002$0BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC). CORRECTS PERIOD OF PERFORMANCE TO DECEMBER 5, 2024 (FROM DEC 5, 2025, AS REVISED ON MOD 1). ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 8, 2023P00001$0ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER. CORRECTS TASK ORDER NUMBER ON BASE AWARD FROM 80KSC023FA152 TO 80KSC023FA155 AND END DATE TO 12/5/2025.
Aug 18, 20230$198.6KENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.