Federal contract award
80KSC023FA155
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA KENNEDY SPACE CENTER |
| NAICS | 541330 — Engineering Services |
| PSC | C214 — A&E Management Engineering Services |
| Parent award / vehicle | 80KSC022DA121 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $228.6K |
| Current contract value | $228.6K |
| Potential contract value / ceiling | $228.6K |
| Start date | Aug 18, 2023 |
| Current end date | Apr 30, 2026 |
| Potential end date | Apr 30, 2026 |
| Latest award activity | Dec 19, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 19, 2025 | P00006 | $8.9K | BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC). |
| Sep 26, 2025 | P00005 | $12.9K | BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC). |
| Sep 12, 2025 | P00004 | $8.1K | BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC). |
| Jan 13, 2025 | P00003 | $0 | BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC). CORRECTION OF END DATE OF PERIOD OF PERFORMANCE BACK TO DECEMBER 5, 2025 AT $0. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Dec 1, 2023 | P00002 | $0 | BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC). CORRECTS PERIOD OF PERFORMANCE TO DECEMBER 5, 2024 (FROM DEC 5, 2025, AS REVISED ON MOD 1). ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Sep 8, 2023 | P00001 | $0 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER. CORRECTS TASK ORDER NUMBER ON BASE AWARD FROM 80KSC023FA152 TO 80KSC023FA155 AND END DATE TO 12/5/2025. |
| Aug 18, 2023 | 0 | $198.6K | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.