Federal contract award
80KSC024F0057
HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA KENNEDY SPACE CENTER |
| NAICS | 236210 — Industrial Building Construction |
| PSC | Z2EZ — REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS |
| Parent award / vehicle | 80SSC018D0004 |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $8.6M |
| Current contract value | $8.6M |
| Potential contract value / ceiling | $8.6M |
| Start date | Sep 30, 2024 |
| Current end date | Feb 11, 2027 |
| Potential end date | Feb 11, 2027 |
| Latest award activity | Aug 17, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 17, 2026 | P00007 | $86.7K | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Aug 17, 2026 | P00008 | $23.1K | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Jun 29, 2026 | P00006 | $25.6K | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Sep 19, 2025 | P00005 | $121.9K | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Jul 1, 2025 | P00003 | $-14.5K | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Jul 1, 2025 | P00004 | $60.0K | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Jun 10, 2025 | P00002 | $63.5K | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Sep 26, 2024 | P00001 | $0 | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
| Sep 10, 2024 | 0 | $8.2M | HEATING, VENTILATION, AND AIR CONDITIONING UPGRADES AT THE BOOSTER FABRICATION FACILITY COMPLEX AT KENNEDY SPACE CENTER, FLORIDA |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
85/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 85/100. Available recorded signals: 80 points.
- Contract end 2027-02-11 (102 days from calculation)
- +35 points
- 5 historical awards in this buyer and category group
- +15 points
- 9 recorded award transactions
- +10 points
- Latest award action: 2026-08-17
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.