Federal contract award

80KSC024FA048

FABRICATION OF THE MOBILE LAUNCHER 2 (ML2) VEHICLE DAMPING SYSTEM (VDS)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS339999 — All Other Miscellaneous Manufacturing
PSC1735 — Space Vehicle Handling and Servicing Equipment
Parent award / vehicle80KSC024DA007
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$4.3M
Current contract value$4.3M
Potential contract value / ceiling$4.3M
Start dateApr 9, 2024
Current end dateSep 30, 2025
Potential end dateSep 30, 2025
Latest award activityAug 22, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 22, 2025P00009$169.9KFABRICATION OF THE MOBILE LAUNCHER 2 (ML2) VEHICLE DAMPING SYSTEM (VDS). MODIFICATION TO INCORPORATE MINOR DESIGN CHANGES THAT CAME UP DURING FABRICATION.
Jun 18, 2025P00008$0FABRICATION OF THE MOBILE LAUNCHER 2 (ML2) VEHICLE DAMPING SYSTEM (VDS).
Mar 6, 2025P00007$0FABRICATION OF THE MOBILE LAUNCHER 2 (ML2) VEHICLE DAMPING SYSTEM (VDS) MODIFICATION P00007 TO EXTEND PERIOD OF PERFORMANCE THROUGH 4/30/25.
Dec 20, 2024P00006$123.5KFABRICATION OF THE MOBILE LAUNCHER 2 (ML2) VEHICLE DAMPING SYSTEM (VDS) MODIFICATION P00006 TO INCORPORATE TOWER B MODIFICATIONS.
Dec 19, 2024P00005$195.8KFABRICATION OF THE MOBILE LAUNCHER 2 (ML2) VEHICLE DAMPING SYSTEM (VDS) MODIFICATION P00005 TO ACCELERATE SCHEDULE AND ADJUST PERIOD OF PERFORMANCE.
Oct 15, 2024P00004$0FABRICATION OF THE MOBILE LAUNCHER 2 (ML2) VEHICLE DAMPING SYSTEM (VDS) MODIFICATION P00004 TO EXTEND PERIOD OF PERFORMANCE.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.