Federal contract award

80KSC024FA070

SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS541330 — Engineering Services
PSCC219 — Other Architect and Engineering Services
Parent award / vehicle80KSC022DA115
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$208.8K
Current contract value$208.8K
Potential contract value / ceiling$208.8K
Start dateAug 6, 2024
Current end dateJun 30, 2025
Potential end dateJun 30, 2025
Latest award activityJun 9, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2025P00005$0SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.
Apr 29, 2025P00004$0SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.
Mar 28, 2025P00003$0SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.
Feb 3, 2025P00002$0SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.
Nov 6, 2024P00001$0SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.