Federal contract award

80LARC25FA001

INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA LANGLEY RESEARCH CENTER
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH
Parent award / vehicle80LARC22DA003
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$78.1K
Current contract value$99.5K
Potential contract value / ceiling$99.5K
Start dateOct 23, 2024
Current end dateFeb 7, 2025
Potential end dateFeb 7, 2025
Latest award activityApr 7, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 7, 2025P00004$0INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING
Apr 3, 2025P00003$-21.4KINFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING
Feb 5, 2025P00002$-138.7KINFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING
Dec 10, 2024P00001$0INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING
Oct 23, 20240$238.2KINFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.