Federal contract award

80LARC25FA016

INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA LANGLEY RESEARCH CENTER
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH
Parent award / vehicle80LARC22DA006
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$290.5K
Current contract value$290.5K
Potential contract value / ceiling$290.5K
Start dateMay 21, 2025
Current end dateFeb 13, 2026
Potential end dateFeb 13, 2026
Latest award activityJan 26, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jan 26, 2026P00004$0INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING.
Dec 1, 2025P00003$0INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING.
Oct 7, 2025P00002$0INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING.
Aug 28, 2025P00001$0INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING.
May 21, 20250$290.5KINFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK A - INFLATABLE STRUCTURES DESIGN, MANUFACTURING, AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.