Federal contract award
80LARC25FA037
INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK B - FLEXIBLE THERMAL PROTECTION SYSTEMS DESIGN, MANUFACTURING AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA LANGLEY RESEARCH CENTER |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH |
| Parent award / vehicle | 80LARC22DA007 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $152.9K |
| Current contract value | $152.9K |
| Potential contract value / ceiling | $152.9K |
| Start date | Aug 18, 2025 |
| Current end date | Oct 2, 2026 |
| Potential end date | Oct 2, 2026 |
| Latest award activity | Jan 6, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jan 6, 2026 | P00002 | $0 | INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK B - FLEXIBLE THERMAL PROTECTION SYSTEMS DESIGN, MANUFACTURING AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING |
| Sep 15, 2025 | P00001 | $0 | INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK B - FLEXIBLE THERMAL PROTECTION SYSTEMS DESIGN, MANUFACTURING AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING |
| Aug 18, 2025 | 0 | $152.9K | INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK B - FLEXIBLE THERMAL PROTECTION SYSTEMS DESIGN, MANUFACTURING AND TESTING INCLUDING SUPPORT FOR AEROSHELL INTEGRATION AND TESTING |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.