Federal contract award

80MSFC21F0313

THIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA MARSHALL SPACE FLIGHT CENTER
NAICS236210 — Industrial Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicle80SSC018D0017
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$38.8M
Current contract value$38.8M
Potential contract value / ceiling$38.8M
Start dateJan 12, 2022
Current end dateApr 22, 2027
Potential end dateApr 22, 2027
Latest award activityApr 24, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 24, 2026P00007$2.7MMAF BUILDING 103 ROOF AND FANHOUSE REPLACEMENT PHASE 2
Jun 3, 2025P00006$4.1MMAF BUILDING 103 ROOF AND FANHOUSE REPLACEMENT PHASE 2
Dec 20, 2024P00005$4.8MMAF BUILDING 103 ROOF AND FANHOUSE REPLACEMENT PHASE 2
Aug 15, 2024P00004$830.6KMAF BUILDING 103 ROOF AND FANHOUSE REPLACEMENT PHASE 2
Jul 21, 2023P00003$428.5KTHIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.
Jul 27, 2022P00002$878.1KTHIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.
Jan 24, 2022P00001$0THIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.
Sep 29, 20210$25.1MTHIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2027-04-22 (179 days from calculation)
+35 points
10 historical awards in this buyer and category group
+15 points
8 recorded award transactions
+10 points
Latest award action: 2026-04-24
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.