Federal contract award
80NM0018F0497
PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA MANAGEMENT OFFICE -- JPL |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AR22 — SPACE SCIENCE AND APPLICATIONS - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT |
| Parent award / vehicle | 80NM0018D0004 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $17.1M |
| Current contract value | $21.7M |
| Potential contract value / ceiling | $21.7M |
| Start date | Oct 1, 2018 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Sep 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 197 of 197 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 4, 2026 | P00196 | $39.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 24, 2026 | P00195 | $150.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 11, 2026 | P00194 | $-272.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 25, 2026 | P00193 | $80.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 9, 2026 | P00192 | $32.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 2, 2026 | P00190 | $125.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 26, 2026 | P00189 | $31.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 21, 2026 | P00188 | $55.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 6, 2026 | P00187 | $225.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 2, 2026 | P00186 | $110.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 21, 2026 | P00185 | $40.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 14, 2026 | P00184 | $110.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 24, 2025 | P00183 | $12.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 16, 2025 | P00182 | $-110 | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 10, 2025 | P00181 | $250.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 27, 2025 | P00180 | $38.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 20, 2025 | P00179 | $28.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 6, 2025 | P00178 | $43.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 29, 2025 | P00177 | $35.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 16, 2025 | P00176 | $150.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 9, 2025 | P00175 | $-3.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 8, 2025 | P00174 | $280.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 25, 2025 | P00173 | $22.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 18, 2025 | P00171 | $-21.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 18, 2025 | P00172 | $232.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 11, 2025 | P00170 | $48.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 4, 2025 | P00191 | $-8.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 28, 2025 | P00169 | $38.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 21, 2025 | P00168 | $29.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 14, 2025 | P00167 | $-111.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 30, 2025 | P00166 | $207.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 2, 2025 | P00165 | $15.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 5, 2025 | P00164 | $404.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 18, 2025 | P00163 | $48.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 13, 2025 | P00162 | $26.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 30, 2025 | P00161 | $25.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 27, 2025 | P00160 | $10.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 21, 2025 | P00159 | $28.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 15, 2025 | P00158 | $341.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 11, 2024 | P00157 | $274.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 20, 2024 | P00156 | $47.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 12, 2024 | P00155 | $-52.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 21, 2024 | P00154 | $251.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 9, 2024 | P00153 | $130.9K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 4, 2024 | P00152 | $100.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 21, 2024 | P00151 | $5.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 14, 2024 | P00150 | $107.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 31, 2024 | P00149 | $98.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 29, 2024 | P00148 | $343.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 17, 2024 | P00147 | $300.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 10, 2024 | P00146 | $406.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 26, 2024 | P00145 | $30.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 12, 2024 | P00144 | $16.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 6, 2024 | P00143 | $7.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 5, 2024 | P00142 | $32.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 29, 2024 | P00141 | $55.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 22, 2024 | P00140 | $56.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 8, 2024 | P00139 | $39.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 22, 2024 | P00138 | $75.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 3, 2024 | P00137 | $200.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 26, 2024 | P00136 | $133.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 20, 2024 | P00135 | $77.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 13, 2024 | P00134 | $4.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 21, 2024 | P00133 | $20.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 14, 2024 | P00132 | $23.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 7, 2024 | P00131 | $10.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 24, 2024 | P00130 | $50.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 17, 2024 | P00129 | $595.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 21, 2023 | P00128 | $100.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 6, 2023 | P00127 | $28.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 29, 2023 | P00126 | $114.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 8, 2023 | P00125 | $62.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 7, 2023 | P00124 | $214.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 2, 2023 | P00123 | $22.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 25, 2023 | P00122 | $160.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 18, 2023 | P00121 | $43.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 11, 2023 | P00120 | $104.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 27, 2023 | P00119 | $85.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 13, 2023 | P00118 | $78.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 6, 2023 | P00117 | $125.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 28, 2023 | P00116 | $15.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 8, 2023 | P00114 | $5.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 8, 2023 | P00115 | $-45.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 2, 2023 | P00113 | $58.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 28, 2023 | P00112 | $110.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 24, 2023 | P00111 | $0 | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 17, 2023 | P00110 | $142.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 26, 2023 | P00109 | $49.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 5, 2023 | P00108 | $-50.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 29, 2023 | P00107 | $222.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 15, 2023 | P00106 | $82.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 22, 2023 | P00105 | $50.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 8, 2023 | P00104 | $192.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 25, 2023 | P00103 | $40.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 4, 2023 | P00102 | $30.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 20, 2022 | P00101 | $-230.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 16, 2022 | P00100 | $80.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 9, 2022 | P00099 | $240.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 27, 2022 | P00098 | $70.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 12, 2022 | P00097 | $22.9K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 28, 2022 | P00096 | $77.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 14, 2022 | P00095 | $20.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 7, 2022 | P00094 | $20.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 31, 2022 | P00093 | $28.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 25, 2022 | P00092 | $-11.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 24, 2022 | P00091 | $10.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 20, 2022 | P00090 | $100.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 29, 2022 | P00089 | $333.9K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 21, 2022 | P00088 | $25.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 1, 2022 | P00087 | $59.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 24, 2022 | P00086 | $64.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 18, 2022 | P00085 | $17.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 11, 2022 | P00084 | $54.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 27, 2022 | P00083 | $18.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 20, 2022 | P00082 | $88.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 13, 2022 | P00081 | $10.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 4, 2022 | P00080 | $60.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 2, 2022 | P00079 | $22.9K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 23, 2022 | P00078 | $71.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 16, 2022 | P00077 | $50.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 2, 2022 | P00076 | $231.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 6, 2022 | P00075 | $100.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 15, 2021 | P00074 | $23.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 8, 2021 | P00073 | $55.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 1, 2021 | P00072 | $107.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 13, 2021 | P00071 | $52.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 9, 2021 | P00070 | $9.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 18, 2021 | P00069 | $42.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 4, 2021 | P00068 | $182.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 28, 2021 | P00067 | $91.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 21, 2021 | P00066 | $5.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 28, 2021 | P00065 | $20.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 9, 2021 | P00064 | $84.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 26, 2021 | P00063 | $55.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 5, 2021 | P00062 | $25.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 26, 2021 | P00061 | $238.8K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 14, 2021 | P00060 | $76.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 31, 2021 | P00059 | $78.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 24, 2021 | P00058 | $179.9K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 17, 2021 | P00057 | $91.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 3, 2021 | P00056 | $93.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 24, 2021 | P00055 | $60.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 27, 2021 | P00054 | $112.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 14, 2021 | P00053 | $173.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 6, 2021 | P00052 | $-173.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 30, 2020 | P00051 | $50.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 29, 2020 | P00050 | $14.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 21, 2020 | P00049 | $10.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 11, 2020 | P00048 | $109.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 2, 2020 | P00047 | $10.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Nov 4, 2020 | P00046 | $188.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 28, 2020 | P00045 | $25.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 21, 2020 | P00044 | $175.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 7, 2020 | P00043 | $221.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 23, 2020 | P00042 | $173.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 2, 2020 | P00041 | $15.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 27, 2020 | P00040 | $2.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 26, 2020 | P00039 | $50.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 21, 2020 | P00038 | $86.9K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 12, 2020 | P00037 | $179.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 6, 2020 | P00036 | $190.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 22, 2020 | P00035 | $95.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jul 1, 2020 | P00034 | $25.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 24, 2020 | P00033 | $12.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 17, 2020 | P00032 | $56.7K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jun 10, 2020 | P00031 | $10.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| May 13, 2020 | P00030 | $15.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 29, 2020 | P00029 | $75.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 15, 2020 | P00028 | $20.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 8, 2020 | P00027 | $25.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Apr 1, 2020 | P00026 | $48.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 11, 2020 | P00025 | $95.4K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Mar 4, 2020 | P00024 | $150.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Feb 26, 2020 | P00023 | $31.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Jan 29, 2020 | P00022 | $6.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 18, 2019 | P00021 | $20.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Dec 10, 2019 | P00020 | $145.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 29, 2019 | P00019 | $21.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 24, 2019 | P00018 | $57.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 8, 2019 | P00017 | $289.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Oct 7, 2019 | P00016 | $100.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 24, 2019 | P00015 | $145.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Sep 16, 2019 | P00014 | $141.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT (15-15038) |
| Aug 22, 2019 | P00013 | $0 | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Jun 27, 2019 | P00012 | $70.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Jun 13, 2019 | P00011 | $14.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Jun 5, 2019 | P00010 | $10.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| May 16, 2019 | P00009 | $37.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| May 14, 2019 | P00008 | $212.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Mar 27, 2019 | P00007 | $45.3K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Feb 11, 2019 | P00006 | $255.6K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 |
| Nov 27, 2018 | P00005 | $121.5K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Nov 8, 2018 | P00004 | $25.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Oct 25, 2018 | P00003 | $1.2M | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Oct 11, 2018 | P00002 | $85.0K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 |
| Sep 5, 2018 | P00001 | $38.1K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 |
| Jul 17, 2018 | 0 | $271.2K | PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038 |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-09-30 (699 days from calculation)
- +25 points
- 312 historical awards in this buyer and category group
- +15 points
- 197 recorded award transactions
- +10 points
- Latest award action: 2026-09-04
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.