Federal contract award
80NM0018F0541
ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) 50-13143
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA MANAGEMENT OFFICE -- JPL |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AR22 — SPACE SCIENCE AND APPLICATIONS - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT |
| Parent award / vehicle | 80NM0018D0004 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $23.8M |
| Current contract value | $35.3M |
| Potential contract value / ceiling | $35.3M |
| Start date | Oct 1, 2018 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Sep 3, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 132 of 132 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 9, 2026 | P00132 | $3.3K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 3, 2026 | P00131 | $2.2K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 2, 2026 | P00130 | $129.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 1, 2026 | P00129 | $130.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 3, 2026 | P00128 | $54.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 29, 2026 | P00127 | $75.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 22, 2026 | P00126 | $270.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 12, 2026 | P00125 | $30.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 21, 2026 | P00123 | $170.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 26, 2026 | P00122 | $-13.4K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 24, 2026 | P00121 | $-73.1K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jan 22, 2026 | P00120 | $397.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Dec 17, 2025 | P00119 | $112.1K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Dec 3, 2025 | P00118 | $50.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 22, 2025 | P00117 | $13.3K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 25, 2025 | P00116 | $735 | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 21, 2025 | P00115 | $50.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 6, 2025 | P00114 | $20.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 30, 2025 | P00113 | $33.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 24, 2025 | P00112 | $186.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 1, 2025 | P00111 | $114.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 18, 2025 | P00110 | $445.2K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 16, 2025 | P00109 | $50.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 20, 2025 | P00108 | $150.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 19, 2025 | P00107 | $342.6K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 4, 2025 | P00124 | $50.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 14, 2025 | P00106 | $253.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 14, 2025 | P00105 | $60.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 6, 2025 | P00104 | $75.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 3, 2025 | P00103 | $354.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 18, 2025 | P00102 | $50.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 13, 2025 | P00101 | $-187.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 7, 2025 | P00100 | $125.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jan 28, 2025 | P00099 | $322.6K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Nov 8, 2024 | P00098 | $187.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Nov 4, 2024 | P00097 | $20.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 28, 2024 | P00096 | $261.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 23, 2024 | P00095 | $145.2K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 10, 2024 | P00094 | $1.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 9, 2024 | P00093 | $7.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 27, 2024 | P00091 | $0 | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 27, 2024 | P00092 | $318.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 21, 2024 | P00090 | $62.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 16, 2024 | P00089 | $35.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 24, 2024 | P00088 | $4.7K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 16, 2024 | P00087 | $210.6K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 8, 2024 | P00086 | $50.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 24, 2024 | P00085 | $193.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 10, 2024 | P00084 | $42.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 24, 2024 | P00083 | $788.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 1, 2024 | P00082 | $200.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 21, 2024 | P00081 | $-40.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 27, 2024 | P00080 | $325.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 14, 2024 | P00079 | $149.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 6, 2024 | P00078 | $72.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 1, 2024 | P00077 | $2.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jan 23, 2024 | P00076 | $100.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jan 16, 2024 | P00075 | $35.3K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Dec 22, 2023 | P00074 | $50.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Dec 7, 2023 | P00073 | $179.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Nov 1, 2023 | P00072 | $60.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 31, 2023 | P00071 | $10.4K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 30, 2023 | P00070 | $72.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 20, 2023 | P00069 | $149.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 18, 2023 | P00068 | $70.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 17, 2023 | P00067 | $220.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 15, 2023 | P00066 | $-200.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 27, 2023 | P00065 | $45.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 5, 2023 | P00064 | $90.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 26, 2023 | P00063 | $995.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 9, 2023 | P00062 | $102.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 28, 2023 | P00061 | $102.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 9, 2023 | P00060 | $418.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 8, 2023 | P00059 | $33.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 3, 2023 | P00058 | $74.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Dec 28, 2022 | P00057 | $184.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 28, 2022 | P00055 | $358.4K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 14, 2022 | P00056 | $80.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 28, 2022 | P00054 | $92.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 27, 2022 | P00053 | $142.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 12, 2022 | P00052 | $354.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 21, 2022 | P00051 | $216.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 22, 2022 | P00050 | $90.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 9, 2022 | P00049 | $46.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 19, 2022 | P00048 | $30.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 4, 2022 | P00047 | $55.6K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 25, 2022 | P00046 | $1.1M | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 29, 2022 | P00045 | $155.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 24, 2022 | P00044 | $20.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 2, 2022 | P00043 | $221.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jan 20, 2022 | P00042 | $60.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jan 18, 2022 | P00041 | $288.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Nov 30, 2021 | P00040 | $247.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Nov 3, 2021 | P00039 | $411.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 6, 2021 | P00038 | $50.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 22, 2021 | P00037 | $30.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 24, 2021 | P00036 | $113.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 17, 2021 | P00035 | $425.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 2, 2021 | P00034 | $37.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 3, 2021 | P00033 | $431.3K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 12, 2021 | P00032 | $10.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 24, 2021 | P00031 | $0 | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Mar 2, 2021 | P00030 | $570.7K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Feb 4, 2021 | P00029 | $768.7K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Dec 3, 2020 | P00028 | $327.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Dec 1, 2020 | P00027 | $214.1K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 28, 2020 | P00026 | $87.7K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 30, 2020 | P00025 | $35.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 30, 2020 | P00024 | $59.7K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 24, 2020 | P00023 | $1.5M | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| May 21, 2020 | P00022 | $3.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Apr 21, 2020 | P00021 | $30.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jan 15, 2020 | P00020 | $430.4K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Oct 24, 2019 | P00019 | $461.1K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 20, 2019 | P00018 | $8.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 19, 2019 | P00017 | $-46.2K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 12, 2019 | P00016 | $27.7K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 10, 2019 | P00015 | $-5.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Sep 4, 2019 | P00014 | $52.1K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Aug 5, 2019 | P00013 | $30.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jul 26, 2019 | P00012 | $-65.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) (50-13143) |
| Jun 25, 2019 | P00011 | $246.4K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Jun 6, 2019 | P00010 | $-9.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| May 14, 2019 | P00009 | $0 | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| May 3, 2019 | P00008 | $15.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Apr 11, 2019 | P00007 | $24.9K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Apr 5, 2019 | P00006 | $1.5M | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Feb 12, 2019 | P00005 | $579.8K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 4833 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Dec 3, 2018 | P00004 | $0 | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) 50-13143 |
| Nov 27, 2018 | P00002 | $595.5K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) 50-13143 |
| Oct 19, 2018 | P00001 | $1.0M | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) |
| Jul 17, 2018 | 0 | $518.0K | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) 50-13143 |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-09-30 (699 days from calculation)
- +25 points
- 312 historical awards in this buyer and category group
- +15 points
- 132 recorded award transactions
- +10 points
- Latest award action: 2026-09-03
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.