EUROPA CLIPPER PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA MANAGEMENT OFFICE -- JPL
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAR22 — SPACE SCIENCE AND APPLICATIONS - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT
Parent award / vehicle80NM0018D0004
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$3.0B
Current contract value$3.2B
Potential contract value / ceiling$3.2B
Start dateOct 1, 2018
Current end dateSep 30, 2028
Potential end dateSep 30, 2028
Latest award activitySep 1, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 82 of 82 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 1, 2026P00081$6.1MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Aug 20, 2026P00080$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Aug 13, 2026P00079$677.0KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Jul 14, 2026P00078$3.0KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Jun 30, 2026P00077$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Jun 29, 2026P00076$14.9KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Jun 9, 2026P00075$20.2MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
May 20, 2026P00074$1.5MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Mar 23, 2026P00073$21.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Dec 3, 2025P00072$24.6MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Sep 25, 2025P00071$24.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE E (40-19123)
Sep 15, 2025P00070$120.8KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH E (40-19123)
Jul 24, 2025P00069$20.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH E (40-19123)
May 14, 2025P00068$1.3MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH E (40-19123)
Apr 25, 2025P00067$20.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH E (40-19123)
Apr 7, 2025P00066$5.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH E (40-19123)
Mar 12, 2025P00065$6.8MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH E (40-19123)
Mar 10, 2025P00064$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Mar 3, 2025P00063$13.8MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jan 7, 2025P00062$500.0KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Dec 16, 2024P00061$6.4MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Oct 21, 2024P00060$30.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Sep 23, 2024P00059$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Aug 26, 2024P00058$31.8MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jul 30, 2024P00057$14.3KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jul 15, 2024P00056$31.5KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jun 11, 2024P00055$4.4KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jun 3, 2024P00054$62.7MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
May 10, 2024P00053$1.4MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
May 8, 2024P00052$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Apr 3, 2024P00051$54.5MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Feb 21, 2024P00050$25.6MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jan 24, 2024P00049$20.5MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jan 5, 2024P00048$39.7MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jan 3, 2024P00047$-39.7MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Dec 12, 2023P00046$39.7MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Nov 13, 2023P00045$22.7MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Oct 6, 2023P00044$15.2MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Aug 1, 2023P00043$40.1MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Jul 19, 2023P00042$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Mar 13, 2023P00041$147.9MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Dec 28, 2022P00040$50.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Oct 6, 2022P00039$45.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Aug 26, 2022P00038$7.4MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
May 13, 2022P00037$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
May 3, 2022P00036$782.4KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH C/D (40-19123)
Apr 29, 2022P00035$230.0MEUROPA CLIPPER PROJECT (40-19123)
Jan 24, 2022P00034$0EUROPA CLIPPER PROJECT (40-19123)
Jan 20, 2022P00033$35.3MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Jan 7, 2022P00032$45.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Dec 6, 2021P00031$35.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Oct 19, 2021P00030$64.8MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Jul 8, 2021P00029$-13.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Apr 28, 2021P00028$33.4MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Apr 5, 2021P00027$416.6KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Feb 12, 2021P00026$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Feb 10, 2021P00025$320.2MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Jan 13, 2021P00024$9.9MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Dec 17, 2020P00023$44.0MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Oct 19, 2020P00022$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Oct 9, 2020P00021$10.2MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Sep 24, 2020P00020$2.2MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Sep 15, 2020P00019$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Aug 20, 2020P00018$1.3MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Aug 4, 2020P00017$74.6MEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Jul 20, 2020P00016$270.0KEUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Jun 23, 2020P00015$0EUROPA CLIPPER PROJECT: PRE-PHASE A THROUGH PHASE C/D (40-19123)
Feb 7, 2020P00014$475.6MEUROPA CLIPPER (40-19123)
Dec 23, 2019P00013$6.4MEUROPA CLIPPER (40-19123)
Dec 3, 2019P00012$13.2MEUROPA CLIPPER (40-19123)
Sep 13, 2019P00011$0EUROPA CLIPPER (40-19123)
Aug 14, 2019P00010$1.4MEUROPA CLIPPER (40-19123)
May 28, 2019P00009$75.0MEUROPA CLIPPER 40-19123 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
May 15, 2019P00008$0EUROPA CLIPPER 40-19123 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
Mar 22, 2019P00007$295.3MEUROPA CLIPPER 40-19123 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
Mar 11, 2019P00006$36.0MEUROPA CLIPPER 40-19123 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
Feb 8, 2019P00005$67.9MEUROPA CLIPPER 40-19123
Dec 21, 2018P00004$26.4MEUROPA CLIPPER 40-19123 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
Nov 26, 2018P00003$25.6MEUROPA CLIPPER 40-19123
Oct 26, 2018P00002$176.1MEUROPA CLIPPER 40-19123 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
Oct 9, 2018P00001$0EUROPA CLIPPER 40-19123
Jul 24, 20180$114.7MEUROPA CLIPPER PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.

Estimated positioning window

Sep 30, 2027 – Mar 30, 2028

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2028-09-30 (699 days from calculation)
+25 points
312 historical awards in this buyer and category group
+15 points
82 recorded award transactions
+10 points
Latest award action: 2026-09-01
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.