80NM0018F0736
NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA MANAGEMENT OFFICE -- JPL |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AR22 — SPACE SCIENCE AND APPLICATIONS - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT |
| Parent award / vehicle | 80NM0018D0004 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $32.5M |
| Current contract value | $49.0M |
| Potential contract value / ceiling | $49.0M |
| Start date | Oct 1, 2018 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Aug 3, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 78 of 78 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 3, 2026 | P00077 | $2.5M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 1, 2026 | P00076 | $75.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Mar 2, 2026 | P00075 | $300.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Nov 20, 2025 | P00074 | $500.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Sep 25, 2025 | P00073 | $215.2K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jul 24, 2025 | P00072 | $0 | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jul 23, 2025 | P00071 | $784.5K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jun 18, 2025 | P00070 | $-50.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jun 16, 2025 | P00069 | $600.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| May 27, 2025 | P00068 | $800.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| May 5, 2025 | P00067 | $186.3K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 17, 2025 | P00066 | $500.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Mar 4, 2025 | P00065 | $25.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Feb 18, 2025 | P00064 | $32.5K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jan 16, 2025 | P00063 | $184.9K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jan 13, 2025 | P00062 | $1.0M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Dec 23, 2024 | P00061 | $10.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Dec 19, 2024 | P00060 | $63.5K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Dec 16, 2024 | P00059 | $965.8K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Oct 10, 2024 | P00058 | $1.1M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Oct 7, 2024 | P00057 | $-11.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Sep 19, 2024 | P00056 | $400.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jun 20, 2024 | P00055 | $1.2M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| May 9, 2024 | P00054 | $15.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 10, 2024 | P00053 | $380.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Mar 27, 2024 | P00052 | $600.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Feb 6, 2024 | P00051 | $36.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jan 31, 2024 | P00050 | $250.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Dec 19, 2023 | P00049 | $99.8K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Dec 7, 2023 | P00048 | $-151.3K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Nov 22, 2023 | P00047 | $500.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Nov 16, 2023 | P00046 | $273.2K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Sep 15, 2023 | P00045 | $64.9K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Sep 11, 2023 | P00044 | $225.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Aug 3, 2023 | P00043 | $0 | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jun 29, 2023 | P00042 | $252.1K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 25, 2023 | P00041 | $722.1K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Mar 27, 2023 | P00040 | $305.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Feb 27, 2023 | P00039 | $40.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jan 31, 2023 | P00038 | $261.6K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Dec 9, 2022 | P00037 | $1.0M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Oct 6, 2022 | P00036 | $900.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Sep 26, 2022 | P00035 | $633.9K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Aug 17, 2022 | P00034 | $521.9K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jun 28, 2022 | P00033 | $0 | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| May 23, 2022 | P00032 | $60.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 20, 2022 | P00031 | $40.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 14, 2022 | P00030 | $1.4M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Dec 8, 2021 | P00029 | $1.3M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Sep 13, 2021 | P00028 | $658.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jul 1, 2021 | P00027 | $500.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 20, 2021 | P00026 | $342.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 14, 2021 | P00025 | $60.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Apr 8, 2021 | P00024 | $77.9K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Feb 1, 2021 | P00023 | $700.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Oct 8, 2020 | P00022 | $550.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Sep 14, 2020 | P00021 | $200.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Aug 5, 2020 | P00020 | $151.3K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| Jul 27, 2020 | P00019 | $264.5K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT (30-8743) |
| May 12, 2020 | P00018 | $1.2M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Apr 8, 2020 | P00017 | $207.8K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Mar 3, 2020 | P00016 | $750.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Feb 18, 2020 | P00015 | $300.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Dec 23, 2019 | P00014 | $400.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Dec 20, 2019 | P00013 | $147.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Nov 21, 2019 | P00012 | $400.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Sep 19, 2019 | P00011 | $301.9K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Sep 18, 2019 | P00010 | $-300.1K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Sep 16, 2019 | P00009 | $300.1K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Aug 21, 2019 | P00008 | $600.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Jun 13, 2019 | P00007 | $566.5K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Mar 19, 2019 | P00006 | $1.2M | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Mar 13, 2019 | P00005 | $60.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Feb 5, 2019 | P00004 | $383.5K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Dec 21, 2018 | P00003 | $200.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
| Nov 9, 2018 | P00002 | $276.0K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Sep 26, 2018 | P00001 | $604.9K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 |
| Aug 10, 2018 | 0 | $160.2K | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-09-30 (699 days from calculation)
- +25 points
- 312 historical awards in this buyer and category group
- +15 points
- 78 recorded award transactions
- +10 points
- Latest award action: 2026-08-03
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.