Federal contract award
80NSSC19C0053
INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA SHARED SERVICES CENTER |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $2.1M |
| Current contract value | $2.1M |
| Potential contract value / ceiling | $2.1M |
| Start date | May 20, 2019 |
| Current end date | Sep 30, 2025 |
| Potential end date | Sep 30, 2025 |
| Latest award activity | Jun 16, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 39 of 39 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 16, 2025 | P00038 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| May 8, 2025 | P00037 | $82.1K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Mar 26, 2025 | P00036 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Dec 13, 2024 | P00035 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Oct 28, 2024 | P00034 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 11, 2024 | P00033 | $114.4K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Aug 23, 2024 | P00032 | $24.8K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Jul 24, 2024 | P00031 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| May 21, 2024 | P00030 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Jan 25, 2024 | P00029 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Nov 13, 2023 | P00028 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 29, 2023 | P00027 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 5, 2023 | P00026 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Jun 14, 2023 | P00025 | $150.0K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Apr 21, 2023 | P00024 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 29, 2022 | P00023 | $0 | EO14042 INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Jun 28, 2022 | P00022 | $0 | EO14042 INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| May 10, 2022 | P00021 | $0 | EO14042 INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| May 4, 2022 | P00020 | $115.1K | EO14042 INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Apr 6, 2022 | P00019 | $400.0K | EO14042 INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Oct 13, 2021 | P00017 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Oct 13, 2021 | P00018 | $0 | EO14042 INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Jul 6, 2021 | P00016 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| May 14, 2021 | P00015 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Feb 3, 2021 | P00014 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Nov 12, 2020 | P00013 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Oct 27, 2020 | P00012 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Oct 22, 2020 | P00011 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 30, 2020 | P00010 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 16, 2020 | P00009 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 10, 2020 | P00008 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| May 21, 2020 | P00007 | $725.8K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Feb 12, 2020 | P00006 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. |
| Feb 4, 2020 | P00005 | $450.0K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Dec 11, 2019 | P00004 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Dec 3, 2019 | P00003 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Nov 12, 2019 | P00002 | $0 | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| Sep 27, 2019 | P00001 | $26.9K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
| May 20, 2019 | 0 | $19.9K | INFINITY HAS THE TOOLS, ASSEMBLY FIXTURES, BUILD SHEETS AND OPERATIONAL PROCEDURES DEFINING THE BUILD PROCESS. UTILIZATION OF THESE WILL HELP TO ENSURE A PROPER TEST AND EVALUATION. ACCORDINGLY, OUR ESTIMATE INCLUDES A LEVEL OF ENGINEERING SUPPORT IN ADDITION TO THE DELIVERY OF REQUIRED HARDWARE. THIS QUOTATION INCLUDES: THREE-(3) ASSEMBLY KITS CONSISTING OF FIVE-(5) MEAS AND ASSOCIATED SOFT GOODS DEVELOPMENT AND SUPPLY OF BUILD-SHEET FOR STACK REVIEW OF NASA EXPERIMENT DESIGN PARTICIPATION IN NASA TEST READINESS REVIEW (TRR) SUPPLY OF TEST FIXTURES, ALIGNMENT PINS AND OTHER BUILD-PROCESS SUPPORT EQUIPMENT REVIEW AND EVALUATION OF TEST RESULTS |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.