Federal contract award

80NSSC24PB675

THREE CYLINDRICAL CELLS DESIGNS EVALUATED WITH RATE VS TEMPERATURE DISCHARGE TESTING (USING ADIABATIC CALORIMETRY), CYCLE LIFE TESTING, CAPACITY AND ENERGY VS RATE TESTING, AND ACCEPTANCE TESTING A NEW BOXES OF 2 CELL DESIGNS (100 AND 130 CELLS).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA SHARED SERVICES CENTER
NAICS541380 — Testing Laboratories and Services
PSCAJ11 — GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$63.0K
Current contract value$63.0K
Potential contract value / ceiling$63.0K
Start dateJul 2, 2024
Current end dateDec 30, 2025
Potential end dateDec 30, 2025
Latest award activitySep 29, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 29, 2025P00002$0THREE CYLINDRICAL CELLS DESIGNS EVALUATED WITH RATE VS TEMPERATURE DISCHARGE TESTING (USING ADIABATIC CALORIMETRY), CYCLE LIFE TESTING, CAPACITY AND ENERGY VS RATE TESTING, AND ACCEPTANCE TESTING A NEW BOXES OF 2 CELL DESIGNS (100 AND 130 CELLS).
Apr 2, 2025P00001$0THREE CYLINDRICAL CELLS DESIGNS EVALUATED WITH RATE VS TEMPERATURE DISCHARGE TESTING (USING ADIABATIC CALORIMETRY), CYCLE LIFE TESTING, CAPACITY AND ENERGY VS RATE TESTING, AND ACCEPTANCE TESTING A NEW BOXES OF 2 CELL DESIGNS (100 AND 130 CELLS).
Jul 2, 20240$63.0KTHREE CYLINDRICAL CELLS DESIGNS EVALUATED WITH RATE VS TEMPERATURE DISCHARGE TESTING (USING ADIABATIC CALORIMETRY), CYCLE LIFE TESTING, CAPACITY AND ENERGY VS RATE TESTING, AND ACCEPTANCE TESTING A NEW BOXES OF 2 CELL DESIGNS (100 AND 130 CELLS).

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.