Federal contract award

80NSSC25PB369

FLOWMETER, ONE HS6-8AEU2-LEA-0284 HIGH SHOCK TURBINE FLOWMETER, TWO ULN-C-1-M4-1 MIRCOLINK SMART PICKOFFS, TWO 19-100753-108 CABLE ASSEMBLIES, AND REQUIRED MATERIAL CERTIFICATION.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA SHARED SERVICES CENTER
NAICS334519 — Other Measuring and Controlling Device Manufacturing
PSC2895 — Miscellaneous Engines and Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$13.4K
Current contract value$13.4K
Potential contract value / ceiling$13.4K
Start dateJul 7, 2025
Current end dateSep 7, 2025
Potential end dateSep 7, 2025
Latest award activityJul 7, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 7, 20250$13.4KFLOWMETER, ONE HS6-8AEU2-LEA-0284 HIGH SHOCK TURBINE FLOWMETER, TWO ULN-C-1-M4-1 MIRCOLINK SMART PICKOFFS, TWO 19-100753-108 CABLE ASSEMBLIES, AND REQUIRED MATERIAL CERTIFICATION.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.