Federal contract award

88310325F00222

DDE RADON MITIGATION STUDY AT THE DDE PRESIDENTIAL LIBRARY. THE PROJECT INVOLVES A SITE VISIT TO ANALYZE THE HVAC SYSTEM AND TO PREPARE A DESIGN AND PROPOSAL FOR MITIGATION AT THE LIBRARY BUILDING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Archives and Records Administration
OfficeNARA CONTRACTING OFFICE
NAICS561210 — Facilities Support Services
PSCH366 — Inspection and Laboratory Services (except medical/dental): Instruments and Laboratory Equipment
Parent award / vehicle47QSHA19D001X
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$161.2K
Current contract value$161.2K
Potential contract value / ceiling$161.2K
Start dateAug 11, 2025
Current end dateFeb 28, 2026
Potential end dateMay 6, 2026
Latest award activityApr 6, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 6, 2026P00002$-2.7KDDE RADON MITIGATION STUDY AT THE DDE PRESIDENTIAL LIBRARY. THE PROJECT INVOLVES A SITE VISIT TO ANALYZE THE HVAC SYSTEM AND TO PREPARE A DESIGN AND PROPOSAL FOR MITIGATION AT THE LIBRARY BUILDING.
Dec 16, 2025P00001$160.2KDDE RADON MITIGATION STUDY AT THE DDE PRESIDENTIAL LIBRARY. THE PROJECT INVOLVES A SITE VISIT TO ANALYZE THE HVAC SYSTEM AND TO PREPARE A DESIGN AND PROPOSAL FOR MITIGATION AT THE LIBRARY BUILDING.
Aug 11, 20250$3.7KDDE RADON MITIGATION STUDY AT THE DDE PRESIDENTIAL LIBRARY. THE PROJECT INVOLVES A SITE VISIT TO ANALYZE THE HVAC SYSTEM AND TO PREPARE A DESIGN AND PROPOSAL FOR MITIGATION AT THE LIBRARY BUILDING.

Research next steps

  1. Verify whether remaining options may extend performance beyond the current end date.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.