Federal contract award

89243324CFE000093

IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY SBA REQUIREMENT #LV1705525898S

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeNATIONAL ENERGY TECHNOLOGY LABORATORY
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2EZ — REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$38.3M
Current contract value$38.3M
Potential contract value / ceiling$38.3M
Start dateAug 30, 2024
Current end dateOct 31, 2026
Potential end dateOct 31, 2026
Latest award activityJul 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 14, 2026P00006$263.6KEO 14398 IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00006 (ADD I.115 FAR 52.222-90 AND REVISION OF I.104 52.244-6) THE PURPOSE OF MODIFICATION P00006 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED W
May 27, 2026P00005$1.2MIRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00005 THE PURPOSE OF MODIFICATION P00005 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED WITH DIFFERING SITE CONDITIONS AND DESIGN CHANGES. THIS MODIFICATION I
Apr 2, 2026P00004$352.8KIRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00004 THE PURPOSE OF MODIFICATION P00004 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED WITH THE CONTAMINATED PIPE FOUND WITHIN THE CONCRETE FLOOR OF B34. THI
Feb 17, 2026P00003$140.4KIRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00003 THE PURPOSE OF MODIFICATION P00003 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED WITH THE BULK DUST AND FILTER(S) REMOVAL IN THE WEST BAGHOUSE. THIS MO
Dec 16, 2025P00002$1.6MIRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00002 THE PURPOSE OF MODIFICATION P00002 IS TO REVISE THE EXISTING SCOPE OF WORK TO: (1) INCORPORATE STORMWATER POLLUTION PREVENTION PLANNING (SWPPP), SURFACE EROSION SEDIMEN
Oct 28, 2024P00001$0IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00001 - NOTICE TO PROCEED - PERIOD OF PERFORMANCE: 11/1/2024 - 10/31/2026 SBA REQUIREMENT #LV1705525898S
Aug 30, 20240$34.8MIRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY SBA REQUIREMENT #LV1705525898S

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.