Federal contract award
89243324CFE000093
IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY SBA REQUIREMENT #LV1705525898S
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | NATIONAL ENERGY TECHNOLOGY LABORATORY |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2EZ — REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $38.3M |
| Current contract value | $38.3M |
| Potential contract value / ceiling | $38.3M |
| Start date | Aug 30, 2024 |
| Current end date | Oct 31, 2026 |
| Potential end date | Oct 31, 2026 |
| Latest award activity | Jul 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 14, 2026 | P00006 | $263.6K | EO 14398 IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00006 (ADD I.115 FAR 52.222-90 AND REVISION OF I.104 52.244-6) THE PURPOSE OF MODIFICATION P00006 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED W |
| May 27, 2026 | P00005 | $1.2M | IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00005 THE PURPOSE OF MODIFICATION P00005 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED WITH DIFFERING SITE CONDITIONS AND DESIGN CHANGES. THIS MODIFICATION I |
| Apr 2, 2026 | P00004 | $352.8K | IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00004 THE PURPOSE OF MODIFICATION P00004 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED WITH THE CONTAMINATED PIPE FOUND WITHIN THE CONCRETE FLOOR OF B34. THI |
| Feb 17, 2026 | P00003 | $140.4K | IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00003 THE PURPOSE OF MODIFICATION P00003 IS TO REVISE THE EXISTING SCOPE OF WORK TO ADD WORK ASSOCIATED WITH THE BULK DUST AND FILTER(S) REMOVAL IN THE WEST BAGHOUSE. THIS MO |
| Dec 16, 2025 | P00002 | $1.6M | IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00002 THE PURPOSE OF MODIFICATION P00002 IS TO REVISE THE EXISTING SCOPE OF WORK TO: (1) INCORPORATE STORMWATER POLLUTION PREVENTION PLANNING (SWPPP), SURFACE EROSION SEDIMEN |
| Oct 28, 2024 | P00001 | $0 | IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY - MODIFICATION P00001 - NOTICE TO PROCEED - PERIOD OF PERFORMANCE: 11/1/2024 - 10/31/2026 SBA REQUIREMENT #LV1705525898S |
| Aug 30, 2024 | 0 | $34.8M | IRA FUNDED B-34 ADVANCED ALLOY SIGNATURE CENTER FACILITY SBA REQUIREMENT #LV1705525898S |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.