Federal contract award

89303022CMA000081

REQUISITION 21MA000516 TO IS ISSUED FOR DESIGN BUILD WATER TOWER REPAIRS AND RECERTIFICATION AT THE GERMANTOWN CAMPUS IN ACCORDANCE WITH THE AMERICAN WATER WORKS ASSOCIATION AWWA FOR THE FIRM-FIXED PRICE AMOUNT OF $1,582,293.00. THE PERIOD OF PERFOR

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeHEADQUARTERS PROCUREMENT SERVICES
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCC1JZ — ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$3.2M
Current contract value$3.2M
Potential contract value / ceiling$3.2M
Start dateAug 15, 2022
Current end dateOct 31, 2026
Potential end dateOct 31, 2026
Latest award activitySep 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 17 of 17 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 11, 2026P00016$45.4KGERMANTOWN WATER TOWER PAINTING. ANTICIPATED VALVE PIT ADDITIONAL WORK.
Jul 27, 2026P00015$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE THROUGH OCTOBER 31, 2026. GERMANTOWN WATER TOWER PAINTING.
Jun 9, 2026P00014$48.6KTHE PURPOSE OF THIS MODIFICATION IS TO 1.) PAINT THE GERMANTOWN WATER TOWER AND 2.) EXTEND THE PERIOD OF PERFORMANCE THROUGH SEPTEMBER 01, 2026.
Jan 6, 2026P00013$160.7KTHE PURPOSE OF THIS MODIFICATION IS TO: 1. INCORPORATE ADDITIONAL WORK WITHIN SCOPE OF THE GERMANTOWN WATER TOWER PAINTING CONTRACT. 2. FUND THE ADDITIONAL WORK WITHIN SCOPE OF THE GERMANTOWN WATER TOWER PAINTING CONTRACT, IN THE AMOUNT OF $160,6
Nov 18, 2025P00012$0EXTEND POP
Nov 6, 2025P00011$0ASSIGN COR AND IAO
Sep 12, 2025P00010$122.1KREQUEST FOR EQUITABLE ADJUSTMENT
Apr 30, 2025P00009$-154.5KREQUISITION 25MA000353 WAS ISSUED TO REMOVE SCOPE OF WORK AND DEOBLIGATE FUNDING IN THE AMOUNT OF -$154,475.00. TOTAL CONTRACT IS DECREASE FROM $2,998,218.78 BY -$154,475.00 TO $2,843,743.78. TOTAL OBLIGATIONS ARE DECREASED FROM $2,998,218.78
Dec 4, 2024P00008$47.0KREQUISITION 25MA000090 WAS ISSUED TO ADD SCOPE OF WORK TO INSTALL A BYPASS LINE BETWEEN THE FIRE MAIN AND THE WATER TOWER VALVE PIT FOR THE GTN WATER TOWER PAINT PROJECT FOR THE FIRM-FIXED PRICE AMOUNT OF $46,975.78. TOTAL OBLIGATIONS ARE INCREA
Sep 11, 2024P00007$0REQUISITION 24MA000699 WAS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE TO 12/31/2025.
Jun 25, 2024P00006$0THIS MODIFICATION IS TO PROVIDED THE REVISED SOW THAT INCLUDES SCOPE BEING REMOVED THAT IS ASSOCIATED WITH MOD P00005 AND THE DEOBLIGATION.
Jun 21, 2024P00005$-297.0KREQUISITION 24MA000454 WAS ISSUED TO DEOBLIGATE FUNDING IN THE AMOUNT OF -$297,000.00. ALL OTHER TERMS AND CONDITIONS ARE UNCHANGED AND ARE IN EFFECT. THE TOTAL FUNDING IS INCREASED FROM $3,248,243.00 BY -$297,000.00 TO $2,951,243.00. THE CE
Sep 27, 2023P00004$1.7MREQUISITION 23MA000613 WAS ISSUED FOR ADDITIONAL TASKS ON THE GERMANTOWN DOE HQ WATER TOWER RELATIVE TO THE ORIGINAL SCOPE OF WORK TO BE PERFORMED WHILE COATING THE WATER TOWER AND UPGRADING MECHANICAL AND ELECTRICAL SYSTEMS RELATED TO THE WATER TOWE
May 9, 2023P00003$0REQUISITION 23MA000458 WAS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE FROM 08/10/22 - 05/13/23 TO 08/10/22 - 09/30/24
Oct 6, 2022P00002$0THIS MODIFICATION IS TO ADD THE FAR CLAUSE 52.204-10 - REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020)
Aug 15, 20220$1.6MREQUISITION 21MA000516 TO IS ISSUED FOR DESIGN BUILD WATER TOWER REPAIRS AND RECERTIFICATION AT THE GERMANTOWN CAMPUS IN ACCORDANCE WITH THE AMERICAN WATER WORKS ASSOCIATION AWWA FOR THE FIRM-FIXED PRICE AMOUNT OF $1,582,293.00. THE PERIOD OF PERFOR
Aug 15, 2022P00001$0THIS MODIFICATION IS TO ADD THE SIGNED AWARD DOCUMENT TO THE CONTRACT.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2026-10-31 (6 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
17 recorded award transactions
+10 points
Latest award action: 2026-09-11
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.