Federal contract award
89303024FMA400884
REQUISITION 20MA001236 WAS ISSUED TO PERFORM WORK PER THE DOE BH-061 CABLING PROJECT AT THE FORRESTAL BUILDING IN WASHINGTON, DC. FOR THE FIRM FIXED PRICE OF $550,789.00. ALL OTHER TERMS AND CONDITIONS ARE IN ACCORDANCE WITH ID
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | HEADQUARTERS PROCUREMENT SERVICES |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2AB — REPAIR OR ALTERATION OF CONFERENCE SPACE AND FACILITIES |
| Parent award / vehicle | 89303020DMA000018 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.5M |
| Current contract value | $1.5M |
| Potential contract value / ceiling | $1.5M |
| Start date | Sep 12, 2024 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | Aug 19, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 19, 2026 | P00007 | $0 | THE PURPOSE FOR THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE THROUGH DECEMBER 31, 2026. |
| May 27, 2026 | P00006 | $0 | THE PURPOSE FOR THIS MODIFICATION IS TO ALLOW TIME TO ADDRESS RECENT WATER DAMAGE WITHIN THE SUITE. |
| Feb 9, 2026 | P00005 | $21.1K | BH-061 CABLING ADDITIONS. DUCTWORK DI-ELECTRIC, UTILITY SLEEVES, AND DOOR ADJUSTMENT AND EXTEND POP THROUGH JUNE 1, 2026. |
| Dec 29, 2025 | P00004 | $0 | BH-061 TO MAKE A SMALL SOW ADJUSTMENT TO ONE SECTION OF DUCTWORK AND EXTEND POP THROUGH FEBRUARY 15, 2026. |
| Nov 10, 2025 | P00003 | $0 | EXTEND POP |
| May 29, 2025 | P00002 | $397.3K | REQUISITION 25MA000406 WAS ISSUED TO ADD SCOPE OF WORK TO COMPLETE THE WORK ASSOCIATED WITH BH-061 WATER REMEDIATION PART 2 SOW FOR THE FIRM FIXED PRICE OF $397,348.00. TOTAL CONTRACT VALUE WILL INCREASE FROM $1,071,891.00 BY $397,348.00 TO $1,4 |
| Feb 18, 2025 | P00001 | $521.1K | REQUISITION 25MA000224 WAS ISSUED TO ADD SCOPE FOR THE WORK ASSOCIATED WITH BH-061 WATER DAMAGE MINUS CONTROL AND DAMAGED CABLING SPECIFICALLY EXCLUDED FOR THE FIRM-FIXED PRICE AMOUNT OF $521,102.00. THE PERIOD OF PERFORMANCE IS EXTENDED TO 08/01/ |
| Sep 12, 2024 | 0 | $550.8K | REQUISITION 20MA001236 WAS ISSUED TO PERFORM WORK PER THE DOE BH-061 CABLING PROJECT AT THE FORRESTAL BUILDING IN WASHINGTON, DC. FOR THE FIRM FIXED PRICE OF $550,789.00. ALL OTHER TERMS AND CONDITIONS ARE IN ACCORDANCE WITH ID |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
85/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 85/100. Available recorded signals: 80 points.
- Contract end 2026-12-31 (60 days from calculation)
- +35 points
- 14 historical awards in this buyer and category group
- +15 points
- 8 recorded award transactions
- +10 points
- Latest award action: 2026-08-19
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.