Federal contract award

89303024FMA400884

REQUISITION 20MA001236 WAS ISSUED TO PERFORM WORK PER THE DOE BH-061 CABLING PROJECT AT THE FORRESTAL BUILDING IN WASHINGTON, DC. FOR THE FIRM FIXED PRICE OF $550,789.00. ALL OTHER TERMS AND CONDITIONS ARE IN ACCORDANCE WITH ID

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeHEADQUARTERS PROCUREMENT SERVICES
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2AB — REPAIR OR ALTERATION OF CONFERENCE SPACE AND FACILITIES
Parent award / vehicle89303020DMA000018
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$1.5M
Current contract value$1.5M
Potential contract value / ceiling$1.5M
Start dateSep 12, 2024
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityAug 19, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 19, 2026P00007$0THE PURPOSE FOR THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE THROUGH DECEMBER 31, 2026.
May 27, 2026P00006$0THE PURPOSE FOR THIS MODIFICATION IS TO ALLOW TIME TO ADDRESS RECENT WATER DAMAGE WITHIN THE SUITE.
Feb 9, 2026P00005$21.1KBH-061 CABLING ADDITIONS. DUCTWORK DI-ELECTRIC, UTILITY SLEEVES, AND DOOR ADJUSTMENT AND EXTEND POP THROUGH JUNE 1, 2026.
Dec 29, 2025P00004$0BH-061 TO MAKE A SMALL SOW ADJUSTMENT TO ONE SECTION OF DUCTWORK AND EXTEND POP THROUGH FEBRUARY 15, 2026.
Nov 10, 2025P00003$0EXTEND POP
May 29, 2025P00002$397.3KREQUISITION 25MA000406 WAS ISSUED TO ADD SCOPE OF WORK TO COMPLETE THE WORK ASSOCIATED WITH BH-061 WATER REMEDIATION PART 2 SOW FOR THE FIRM FIXED PRICE OF $397,348.00. TOTAL CONTRACT VALUE WILL INCREASE FROM $1,071,891.00 BY $397,348.00 TO $1,4
Feb 18, 2025P00001$521.1KREQUISITION 25MA000224 WAS ISSUED TO ADD SCOPE FOR THE WORK ASSOCIATED WITH BH-061 WATER DAMAGE MINUS CONTROL AND DAMAGED CABLING SPECIFICALLY EXCLUDED FOR THE FIRM-FIXED PRICE AMOUNT OF $521,102.00. THE PERIOD OF PERFORMANCE IS EXTENDED TO 08/01/
Sep 12, 20240$550.8KREQUISITION 20MA001236 WAS ISSUED TO PERFORM WORK PER THE DOE BH-061 CABLING PROJECT AT THE FORRESTAL BUILDING IN WASHINGTON, DC. FOR THE FIRM FIXED PRICE OF $550,789.00. ALL OTHER TERMS AND CONDITIONS ARE IN ACCORDANCE WITH ID

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2026-12-31 (60 days from calculation)
+35 points
14 historical awards in this buyer and category group
+15 points
8 recorded award transactions
+10 points
Latest award action: 2026-08-19
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.