Federal contract award
89303924FEM400054
HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THIS TASK ORDER IS ISSUED AS AN UNDEFINITIZED TASK ORDER PURSUANT TO CLAUSE H.49, TASK ORDERING PROCEDURE. NOTICE-TO-PROCEED AND A NOT-TO-EXCEED VALUE OF $98,000,000
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | HANFORD FIELD OFFICE |
| NAICS | 562910 — Remediation Services |
| PSC | Z1PD — MAINTENANCE OF WASTE TREATMENT AND STORAGE FACILITIES |
| Parent award / vehicle | 89303320DEM000030 |
| Set-aside | Not reported |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $1.0B |
| Current contract value | $1.6B |
| Potential contract value / ceiling | $1.6B |
| Start date | Oct 1, 2024 |
| Current end date | Sep 30, 2027 |
| Potential end date | Sep 30, 2027 |
| Latest award activity | Sep 2, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 59 of 59 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 8, 2026 | P00058 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CP-07-007, 216-Z-1A DIFFERING SITE CONDITION CONTAMINATION EVENT REMEDIATION PROPOSAL SUBMITTED BY CENTRAL P |
| Sep 2, 2026 | P00057 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CP-07-005 REVISION 1, FUELS AND MATERIALS EXAMINATION FACILITY (FMEF) REINDUSTRIALIZATION PREPARATIONS PROPO |
| Aug 27, 2026 | P00056 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE VALUE INCREASE FOR THE 100 AREA WASTE REMEDIATION AND D4 ADDITIONAL SCOPE (CP-07-009). |
| Aug 5, 2026 | P00055 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CP-07-006, REMOVAL OF DOE ORDER 436.1, SUSTAINABILITY ORDER PROPOSAL SUBMITTED BY CENTRAL PLATEAU CLEANUP CO |
| Aug 4, 2026 | P00054 | $72.5M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $72,534,470.23 IN INCREMENTAL FUNDING (REQ 26EM001574) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| Jul 29, 2026 | P00053 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PROGRAM OFFICIAL FROM HEATHER DALE TO SCOTT GREEN. |
| Jul 22, 2026 | P00052 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT. |
| Jul 1, 2026 | P00050 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, FISCAL YEARS 2025, 2026, AND 2027 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) REVISION |
| Jun 30, 2026 | P00051 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR THE RL-30 ADDITIONAL SCOPE. |
| Jun 28, 2026 | P00043 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION C, PERFORMANCE WORK STATEMENT. |
| Jun 11, 2026 | P00049 | $8.7K | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE INCREASE FOR THE FUEL AND MATERIALS EXAMINATION FACILITY (FMEF) GENERAL MATTER (GEM) SCOPE OF WORK. IT ALSO PR |
| May 11, 2026 | P00048 | $-19.9M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $19,879,360.00 IN INCREMENTAL FUNDING FROM TO-07, END STATES AND BASE OPERATIONS TO MOVE BACK TO TO-06, MANHATTA |
| May 8, 2026 | P00047 | $-15.1M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $15,120,640.00 IN INCREMENTAL FUNDING FROM TO-07, END STATES AND BASE OPERATIONS TO MOVE BACK TO TO-06, MANHATTA |
| May 5, 2026 | P00046 | $1.6M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $1,550,000.00 IN INCREMENTAL FUNDING (REQ 26EM001177). UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR REM |
| May 4, 2026 | P00040 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR THE FUEL AND MATERIALS EXAMINATION FACILITY (FMEF), 100K ADDITIONAL SCOPE, RL-13 PLUS-UP & 216-Z-1A DI |
| Apr 27, 2026 | P00044 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, FISCAL YEARS 2025, 2026, AND 2027 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) REVISION |
| Apr 23, 2026 | P00045 | $158.7M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $158,720,520.00 IN INCREMENTAL FUNDING (REQ 26EM001077) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDO |
| Apr 2, 2026 | P00042 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $64,001.79 IN RFS GENERAL MATTER FUNDING (REQ 26EM000960). |
| Mar 12, 2026 | P00041 | $47.9M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $47,858,109.31 IN INCREMENTAL FUNDING (REQ 26EM000777) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH MAY 14, 20 |
| Feb 26, 2026 | P00039 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-07-002 SOIL AND GROUNDWATER AND RISK REDUCTION SCOPE REALIGNMENT. |
| Feb 10, 2026 | P00038 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR 216-Z-1A CONTAMINATION CLEANUP DIFFERING SITE CONDITION. |
| Jan 29, 2026 | P00037 | $7.0M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $7,000,000.00 IN INCREMENTAL FUNDING (REQ 26EM000515) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| Dec 23, 2025 | P00036 | $58.4M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $58,449,748.03 IN INCREMENTAL FUNDING (REQ 26EM000388) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| Dec 4, 2025 | P00035 | $102.6M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $102,594,617.55 IN INCREMENTAL FUNDING (REQ 26EM000228) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDO |
| Dec 1, 2025 | P00034 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER ADDRESSING 100 AREA REALIGNMENT WITH ADDED AND DELETED TASK ORDER 07 SCOPE, AND UPDATE TASK ORD |
| Nov 12, 2025 | P00033 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE CHWP ALTERNATIVE/TRUPACT SCOPE REPLANNING. |
| Nov 3, 2025 | P00032 | $600.0K | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $600,000.00 IN INCREMENTAL FUNDING (REQ 26EM000076). UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR REMAI |
| Oct 21, 2025 | P00031 | $35.0M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $35,000,000.00 IN INCREMENTAL FUNDING (REQ 26EM000027) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| Oct 7, 2025 | P00030 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-24-008, CARRYOVER SCOPE OF WORK. |
| Oct 6, 2025 | P00029 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-24-006, ADDITIONAL TASK ORDER 07 SCOPE OF WORK. |
| Sep 29, 2025 | P00028 | $19.5M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $19,498,447.17 IN INCREMENTAL FUNDING (REQ 25EM002146) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH NOVEMBER 5 |
| Sep 15, 2025 | P00024 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT. |
| Sep 10, 2025 | P00026 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE INCREASE FOR CP-24-006 FY25 ADDITIONAL SCOPE, CP-24-008 TO-04 CARRYOVER SCOPE, AND CP-07-002 WRAP PROPOSAL. |
| Sep 10, 2025 | P00027 | $57.0M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $57,039,847.93 IN INCREMENTAL FUNDING (REQ 25EM001971) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| Aug 28, 2025 | P00025 | $78.4K | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $78,364.52 IN BONNEVILLE POWER ADMINISTRATION (BPA) REBATES (REQ 25EM001890). |
| Aug 4, 2025 | P00023 | $62.1M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $62,099,689.44 IN INCREMENTAL FUNDING (REQ 25EM001685) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH SEPTEMBER |
| Jul 24, 2025 | P00021 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FOR FISCAL YEARS 2025, 2026, AND 2027 INTO |
| Jul 16, 2025 | P00022 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE NOT-TO-EXCEED VALUE BY $68,000.00 FROM $457,000.00 (MODIFICATION P00017) TO $525,000.00 FOR THE WRAP PROPOSAL. |
| Jun 30, 2025 | P00020 | $12.2M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE VALUE AND FUNDING IN THE AMOUNT OF $12,208,901.59 FOR THE PERSONAL TIME BANK (PTB) AND SICK LEAVE LIABILITY SCOPE. |
| Jun 12, 2025 | P00018 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT. |
| Jun 9, 2025 | P00019 | $68.3M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $68,286,840.00 IN INCREMENTAL FUNDING (REQ 25EM001356) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH JULY 31, 2 |
| Jun 4, 2025 | P00016 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-07-001, ADDITIONAL 100K AREA D4 SCOPE FOR FY26. |
| May 27, 2025 | P00017 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR CP-25-006 FY 25 ADDITIONAL SCOPE, WRAP MOD, AND 100 AREA SCOPE REALIGNMENT. |
| May 12, 2025 | P00015 | $52.8M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $52,770,040.00 IN INCREMENTAL FUNDING (REQ 25EM001228) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH JUNE 22, 2 |
| Apr 29, 2025 | P00012 | $39.1M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $39,081,102.87 IN INCREMENTAL FUNDING (REQ 25EM001089) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH MAY 22, 20 |
| Apr 29, 2025 | P00014 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE TO 07, END STATES AND BASE OPERATIONS. THIS MODIFICATION ALSO UPDATES SECTION C, PERFORMANCE WORK STATEMENT. |
| Apr 28, 2025 | P00013 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AN NTE INCREASE IN THE AMOUNT OF $4.9M FOR CARRYOVER SCOPE FROM TO-04 THAT WILL BE COMPLETED WITHIN TO-07. |
| Apr 8, 2025 | P00011 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE INVOICE APPROVING OFFICIAL FROM KELLY A. BRAZIL TO BRENDA S. VALADEZ. |
| Feb 24, 2025 | P00010 | $61.6M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $61,580,912.62 IN INCREMENTAL FUNDING (REQ 25EM000733) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH APRIL 20, |
| Feb 12, 2025 | P00007 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A NTE TO CPCCO IN THE AMOUNT OF $10.9M FOR CARRYOVER SCOPE FROM TO-04 THAT WILL BE COMPLETED WITHIN TO-07. |
| Feb 12, 2025 | P00008 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NTE VALUE OF $14.2M FOR THE TO-07 ADDITIONAL SCOPE OF WORK PROVIDED IN RFP LETTER 24-AMRP-0025, DATED SEPTEMBER 24, |
| Jan 27, 2025 | P00009 | $50.6M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $50,552,062.91 IN INCREMENTAL FUNDING (REQ 25EM000565) FOR UNINTERRUPTED SUPPORT THROUGH FEBRUARY 27, 2025. |
| Jan 2, 2025 | P00006 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NOT-TO-EXCEED (NTE) INCREASE OF $102.9M REVISING THE NTE VALUE FROM $98M TO $200.9M. |
| Dec 19, 2024 | P00005 | $47.9M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $47,884,315.31 IN INCREMENTAL FUNDING (REQ 25EM000432) FOR UNINTERRUPTED SUPPORT THROUGH JANUARY 22, 2025, FOR CENTRAL |
| Nov 25, 2024 | P00004 | $16.2M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $16,185,651.31 IN INCREMENTAL FUNDING (REQ 25EM000268) FOR UNINTERRUPTED SUPPORT THROUGH DECEMBER 2024. |
| Oct 21, 2024 | P00003 | $45.2M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $45,221,900.00 IN INCREMENTAL FUNDING (REQ 25EM000067) FOR UNINTERRUPTED SUPPORT THROUGH 11/24/2024. |
| Oct 7, 2024 | P00002 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE TASK ORDER 7 SECTION C, TO REMOVE REFERENCE TO RL AND/OR ORP, AND REPLACE WITH HANFORD FIELD OFFICE (HFO). |
| Sep 27, 2024 | P00001 | $36.6M | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $36,592,448.69 IN INCREMENTAL FUNDING (REQ 24EM002317) FOR UNINTERRUPTED SUPPORT THROUGH 10/17/2024, FOR THE CENTRAL PL |
| Sep 16, 2024 | 0 | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THIS TASK ORDER IS ISSUED AS AN UNDEFINITIZED TASK ORDER PURSUANT TO CLAUSE H.49, TASK ORDERING PROCEDURE. NOTICE-TO-PROCEED AND A NOT-TO-EXCEED VALUE OF $98,000,000 |
Estimated positioning window
Oct 25, 2026 – Mar 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-09-30 (340 days from calculation)
- +35 points
- 9 historical awards in this buyer and category group
- +15 points
- 59 recorded award transactions
- +10 points
- Latest award action: 2026-09-02
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.