Federal contract award

9063

IGF::OT::IGF THIS PROCUREMENT REQUEST IS TO COVER THE COST AND INSTALLATION PERIODS FOR REPLACING THE INTERNATIONAL LAW OFFICE ENTRYWAY WITH A GLASS DOOR. THE EXISTING WOODEN DOORWAY WOULD BE PLACED WITH A STANDARD ALUMINUM GLASS DOOR AND FRAME. THE EXISTING AUTOMATIC OPERATOR WOULD BE REUSED FOR THE NEW GLASS DOOR. THE NEW FRAME WOULD REQUIRE THE REWORK OF THE CARD READER AND MAGLOCKS FOR BY THE SELECTED SECURITY VENDOR. A STANDARD STENCILED SIGN IS REQUIRED FOR THE DOORWAY. THE EXISTING BACK ENTRYWAY WOULD REMAIN AS CURRENTLY BUILT. ALL HARDWARE AND PAINT FINISHES WILL MATCH THE EXISTING MATERIAL USED WITH THE DOT COMPLEX. THE MATERIALS WOULD HAVE A TIME OF 9 NINE WEEKS LEAD TIME BEFORE ARRIVING AT THE CONSTRUCTION TEAM'S WAREHOUSE. THIS ROM DOES NOT INCLUDE ANY UNFORESEEN CONSTRUCTION ENVIRONMENTS THAT MAY IMPACT THE PRICING OF THIS PROJECT. THE GLASS DOOR AND AUTOMATIC OPENER PROCUREMENT IS APPROXIMATELY SEVEN WEEKS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693JK4 OST
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS
Parent award / vehicleDTOS5911A00007
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$8.7K
Current contract value$8.7K
Potential contract value / ceiling$8.7K
Start dateSep 20, 2016
Current end dateSep 30, 2016
Potential end dateSep 30, 2016
Latest award activityMay 15, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 15, 20251$0THE PURPOSE OF THIS MODIFICATION IS TO EXECUTE A FINAL CLOSEOUT FOR CONTRACT DTOS5911A00007/9063.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.