199812!2100!0747!AA09 !U.S. ARMY INDUSTRIAL OPERATIONS !DAAA0998E0006 !A!*!P00001 !19980929!19991231!289954943!770087872!217304393!N!40381!ROYAL ORDNANCE PLC !EUXTON LA !CHORLEY !UK!PR7 6!03000!013!51!ARLINGTON !ARLINGTON !VIRGINIA !0001!+000000759000!N!N!000000000000!Y151!AMMUNITION FACILITIES !A6 !AMMUNITION !1000!NOT DISCERNABLE OR CLASSIFIED !3483!3!*!*!C!B!A!*!A !N!J!1!001!B!* !A!Y!A!* !* !N!C!*!A!A!A!A!A!*!* !*!N!A!C!N!*!*!*!*!*!

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RI
NAICS561210 — Facilities Support Services
PSCY151 — Construction of Ammunition Facilities
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$2.3B
Current contract value$1.4B
Potential contract value / ceiling$1.4B
Start dateSep 29, 1998
Current end dateMar 31, 2027
Potential end dateMar 31, 2027
Latest award activityApr 21, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 761 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 21, 2026P00896$0ADMIN MODIFICATION TO UPDATE PAY OFFICE.
Apr 8, 2026P00894$517.6KD-4 NITRATION MATERIAL ESCALATION FOR LINE #7
Mar 13, 2026P00895$0NO COST PERFORMANCE COMPLETION DATE EXTENSION
Dec 29, 2025P00893$0POP EXTENSION FOR EDC PROJECT.
Dec 22, 2025P00888$0SERVICE CONTRACT ACT REQUEST FOR EQUITABLE ADJUSTMENT
Dec 19, 2025P00892$0UPDATE ATTACHMENT FOR TATB 1B - PERFORMANCE BASED MILESTONE SCHEDULE
Dec 10, 2025P00891$226.3KAAA MATERIAL ESCALATION #2
Dec 4, 2025P00889$21.7KPERIOD OF PERFORMANCE EXTENSION FOR AMMONIUM NITRATE SOLUTION THERMAL DESTRUCTION FACILITY DESIGN BUILD
Nov 20, 2025P00890$0NO COST POP EXTENSION.
Sep 26, 2025P00887$-351.4KDE-OBLIGATION OF CANCELLING FUNDS FROM COMPLETED PROJECT.
Sep 22, 2025P00885$0UPDATE PERFORMANCE COMPLETION DATE FOR G-10 AND UPDATE STATEMENT OF WORK FOR TATB 1B PROJECT
Sep 22, 2025P00886$-824.9KDE-OBLIGATION OF FUNDS FROM COMPLETED 2023 DIRECT FUNDED MAJOR MAINTENANCE PROJECTS.
Aug 13, 2025P00884$3.3MPOP EXTENSION FOR FLASHING FURNACE CONSTRUCTION PROJECT DUE TO PERMITTING DELAYS
Jul 10, 2025P00883$0UPDATE PERFORMANCE COMPLETION DATE AND UPDATE STATEMENT OF WORK FOR G-10 PROJECT
Jun 26, 2025P00882$0NO-COST PERIOD OF PERFORMANCE EXTENSION
May 28, 2025P00876$21.6KINCREASE FUNDING ON CLIN 0030OLB FOR INCREASED SCOPE
May 28, 2025P00877$0MODIFICATION P00877 IS TO INCORPORATE AN ECP INTO THE STATEMENT OF WORK.
Apr 25, 2025P00881$0NO COST POP EXTENSION
Mar 31, 2025P00880$0UPDATE PERFORMANCE COMPLETION DATES ON VARIOUS CLINS.
Mar 28, 2025P00879$-7.2KG-3 NQ/RDX RECRYSTALLIZATION BLDG CONSTRUCTION AT HOLSTON ARMY AMMUNITION PLANT - UPDATE TO SOW.
Jan 7, 2025P00875$0NO-COST PERIOD OF PERFORMANCE EXTENSION FOR FOUR ONGOING PROJECTS.
Dec 19, 2024P00874$21.7KPWS G&K FUNDING
Dec 13, 2024P00866$11.7KPC&H FOR COMP B
Oct 3, 2024P00873$0UPDATE PERFORMANCE COMPLETION DATES ON VARIOUS CLINS.
Sep 26, 2024P00872$96.7KINSTALLATION SUPPORT FOR FY 2024
Sep 25, 2024P00862$610.8KLANDFILL - SOUTH SIDE DIFFERING SITE CONDITIONS
Sep 25, 2024P00870$58.9KLANDFILL NORTHSIDE DIFFERING SITE CONDITIONS - UNEXPECTED TRASH
Sep 25, 2024P00871$128.4KG-10 STRONG NITRIC ACID TANK REMOVAL AND REINSTALLATION
Sep 10, 2024P00868$181.8KFIBER OPTIC CABLE INSTALLATION AT HSAAP
Aug 28, 2024P00869$0UPDATE PERIOD OF PERFORMANCE END DATES ON VARIOUS CLINS.
Aug 12, 2024P00859$935.1KEQUITABLE ADJUSTMENT FOR MATERIAL COST ESCALATION AGAINST THE ACETIC ACID AND ANHYDRIDE EXPANSION PROJECT PREVIOUSLY DEFINITIZED UNDER MODIFICATION P00778.
Jul 29, 2024P00867$0ADMINISTRATIVE ACTION TO UPDATE ATTACHMENTS.
Jul 3, 2024P00864$3.1MENGINEERING CHANGE PROPOSAL FOR THE E-5 FILTER/WASH FACILITY TO CHANGE THE TANK HEIGHT.
Jul 3, 2024P00865$138.9KREA SUBMISSION RELATED TO CONTROL ROOM SOFTWARE FOR THE E-5 FILTER & WASH FACILITY PROJECT AT HOLSTON ARMY AMMUNITION PLANT IN SUPPORT OF RDX EXPANSION.
Jun 12, 2024P00861$1.3MLANDFILL - NORTH SIDE DIFFERING SITE CONDITIONS.
Jun 12, 2024P00863$0ABNORMAL MAINTENANCE COSTS AT HSAAP.
Mar 26, 2024P00821$0ADMINISTRATIVE ACTION TO ADD ATTACHMENT.
Mar 8, 2024P00858$-214.5KECP TO REMOVE IMX-101 FROM STATEMENT OF WORK.
Feb 23, 2024P00857$13.9MEXERCISE OF OPTION 0003 CLIN FOR FILTER & WASH FACILITY.
Feb 7, 2024P00856$0ADMINISTRATIVE MODIFICATION ONLY TO UPDATE LINE OF ACCOUNTING ON CLIN 2401AE.
Jan 29, 2024P00854$0ADMINISTRATIVE ACTION TO ADD/UPDATE ATTACHMENTS.
Jan 18, 2024P00855$0CHANGE CONDITION FOR CONVERSION FROM COAL TO NATURAL GAS AT HSAAP.
Dec 21, 2023P00853$409.2KTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Dec 19, 2023P00850$89.0KFUND PWS G AND K FOR FY24
Dec 19, 2023P00852$0ECONOMIC PRICE ADJUSTMENT FOR NATURAL GAS
Dec 11, 2023P00849$169.6KECP PROPOSAL COSTS FOR HOLSTON ARMY AMMUNITION PLANT BOXWAY UPGRADE DESIGN PROJECT.
Nov 28, 2023P00851$0ADMINISTRATIVE MODIFICATION ONLY TO UPDATE LINE OF ACCOUNTING ON CLIN 2401AE.
Sep 29, 2023P00848$16.1MTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Sep 28, 2023P00846$177.1KTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Sep 28, 2023P00847$3.3MUPWARD PRICE ADJUSTMENT FOR MATERIALS COST ESCALATION ON AAA EXPANSION PROJECT.
Sep 27, 2023P00823$7.6MOPTION CLIN EXERCISED AND CLIN RE-STRUCTURE.
Sep 27, 2023P00844$84.3KFUND THE TECHNICAL DATA DELIVERY EFFORT EXECUTED VIA NOTICE TO PROCEED LETTER.
Sep 26, 2023P00835$364.4KLABORATORY SCALE EVALUATIONS TO DETERMINE FEASIBILITY OF PRODUCING SPECIFICATION COMPLIANT CRITICAL MATERIALS FROM HSAAP ANSOL WASTE STREAMS.
Sep 26, 2023P00836$5.0MDEFINITIZATION OF UNPRICED CHANGE ORDER FOR RDX WASTEWATER UPGRADES AT HSAAP.
Sep 26, 2023P00842$134.7KCONTRACTOR SUPPORT FOR GOVERNMENT-LED DESIGN PROJECT FOR ANSOL THERMAL DESTRUCTION FACILITY AT HSAAP.
Sep 25, 2023P00843$6.2MREQUEST FOR EQUITABLE ADJUSTMENT FOR FLASHING FURNACE PROJECT MATERIAL ESCALATION COSTS. ALSO, PERIOD OF PERFORMANCE EXTENSION DUE TO DELAYS IN PERMITTING FOR SAME PROJECT AT HSAAP.
Sep 25, 2023P00845$13.2KINSTALLATION SUPPORT FOR FY 2023
Sep 21, 2023P00840$859.1KDEFINITIZATION OF NACSAC RECOMMISSIONING AT HSAAP
Sep 20, 2023P00837$11.3MDEFINITIZATION OF MODERNIZATION OF G-10 BUILDING AT HSAAP. UKRAINE FUNDING
Sep 18, 2023P00838$162.6KDESIGN SUPPORT FOR NEW LAUNDRY FACILITY PROJECT AT HSAAP
Sep 15, 2023P00839$28.8KFACILITY OPERATOR SUPPORT FOR THE RFI/PROPOSAL PROCESS OF ANSOL TANK FARM AT HSAAP.
Sep 15, 2023P00841$196.8KROADS REPAIR FRONT ENTRANCE FACILITY AND TECHNICAL SUPPORT. UKRAINE
Sep 12, 2023P00834$3.9KPC&H COSTS FOR COMP B
Aug 30, 2023P00828$517.7KTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Aug 30, 2023P00833$984.0KTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Aug 29, 2023P00826$0THIS MODIFICATION IS A NO-COST EXTENSION FOR THE PERIOD OF PERFORMANCE AND A REVISION TO THE RELEVANT ATTACHMENTS.
Aug 23, 2023P00832$4.4MRIVER WATER STUDY PHASE 1B AT HOLSTON ARMY AMMUNITION PLANT
Aug 16, 2023P00830$807.0KCHANGE PROPOSAL TO ADD ANALYTICAL LAB EQUIPMENT TO THE FLASHING FURNACE CONSTRUCTION PROJECT AT HOLSTON ARMY AMMUNITION PLANT IN KINGSPORT TN.
Aug 11, 2023P00824$5.5MEXERCISE OF OPTION 0003 CLIN FOR KETTLE DRYING BUILDING.
Aug 11, 2023P00831$3.8MEXERCISE OF OPTION 0003 CLIN FOR NITRATION BUILDING D.
Aug 9, 2023P00829$676.4KOPERATING CONTRACTOR SUPPORT FOR THE NEW RIVER WATER PUMP HOUSE AND INTAKE FACILITY DESIGN PROJECT AT HOLSTON ARMY AMMUNITION PLANT
Jul 25, 2023P00822$221.4KMODIFICATION P00822 IS TO FUND OVERRUN OF HSAAP TATB PHASE 1A PROJECT.
Jul 20, 2023P00827$0ADMINISTRATIVE MODIFICATION ONLY TO UPDATE LINE OF ACCOUNTING ON CLIN 2401AE.
Jul 14, 2023P00820$843.0KHYDROGEN SULFIDE STUDY FOR INDUSTRIAL WASTEWATER FACILITY
Jul 13, 2023P00825$999.5KEDC DESIGN AND CONSTRUCT PROJECT AT HSAAP
Jun 30, 2023P00816$10.0MTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Jun 13, 2023P00819$431.3KMODIFICATION P00819 IS TO FUND OVERRUN OF HSAAP TATB PHASE 1A PROJECT.
Jun 8, 2023P00818$645.0KTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
May 17, 2023P00811$207.9KCHANGED SITE CONDITION DUE TO LEAKS ON NEUTRALIZATION BASIN PROJECT AT HOLSTON ARMY AMMUNITION PLANT (HSAAP)
May 15, 2023P00817$16.8MTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
May 3, 2023P00813$275.2KMODIFICATION P00813 SETTLEMENT OF COSTS FOR REIMBURSEMENT PAID TO CONTRACTOR UNDER SECTION 3610 CARES ACT
Apr 25, 2023P00812$220.8KTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Apr 14, 2023P00815$4.4MRECOMMISSIONING OF THE NACSAC BLDG AT HSAAP
Apr 10, 2023P00814$9.6MMODIFICATION P00814 IS TO FUND MAJOR MAINTENANCE PROJECTS
Mar 24, 2023P00808$1.2MIMX FEASIBILITY EXPANSION STUDY
Mar 13, 2023P00807$9.2MTHIS IS FUNDING FOR FACILITY OPERATION AT THE HOLSTON ARMY AMMUNITION PLANT.
Mar 10, 2023P00810$515.0KMODIFICATION P00810 IS TO FUND OVERRUN OF HSAAP TATB PHASE 1A PROJECT
Mar 7, 2023P00809$6.5MUNPRICED CHANGE ORDER (UCO) TO EXECUTE RESEARCH DEPARTMENT EXPLOSIVE (RDX) WASTEWATER UPGRADES INCLUDING THE MODERNIZATION AND COMMISSIONING OF THE EXISTING ACTIVATED WASTE SLUDGE SYSTEM AT HOLSTON ARMY AMMUNITION PLANT (HSAAP) INDUSTRIAL WASTEWATER TREATMENT FACILITY.
Feb 10, 2023P00806$25.4KMODIFICATION P00806 IS TO SETTLE LANDFILL EXPANSION PHASE 3 REQUEST FOR EQUITABLE ADJUSTMENT AND INCORPORATE BAE'S COMMERCIAL SMALL BUSINESS PLAN.
Jan 26, 2023P00803$142.1KTHIS MODIFICATION IS FOR THE FACILITY FUNDING ASSOCIATED WITH EXPLOSIVE PRODUCTION EXECUTED UNDER W52P1J-19-D-0074 W519TC23F0028 P00001.
Jan 23, 2023P00805$529.3KRIVER WATER STUDY PROJECT AT HSAAP PHASE 1
Jan 18, 2023P00804$145.1KOPERATING CONTRACTOR SUPPORT FOR THE EXPLOSIVE DECOMPOSITION CHAMBER (EDC) Y MAGAZINE DEMOLITION.
Dec 22, 2022P00800$7.8MMODIFICATION P00800 IS TO AWARD UCO FOR G-10 PROCESS IMPROVEMENTS AT HSAAP.
Dec 19, 2022P00802$6.1MUKRAINE R5 FUNDING FOR CRITICAL SPARE PARTS PHASE 2 AT HOLSTON ARMY AMMUNITION PLANT (HSAAP)
Dec 14, 2022P00797$514.0KAWARD FOR ANSOL THERMAL DESTRUCTION SUPPORT AND DEOBLIGATION OF FUNDS
Dec 9, 2022P00795$23.8MTHIS MODIFICATION IS FOR THE DEFINITIZATION OF THE CONSTRUCTION OF A NEW NITRATION "BUILDING D" FACILITY UCO AT THE HOLSTON ARMY AMMUNITION PLANT.
Dec 6, 2022P00799$407.3KREA FOR NATURAL GAS FIRED STEAM PROJECT. CHANGED SITE CONDITION DUE TO OLD GAS PIPELINE CAUSING DEBRIS TO CLOG LINE.
Dec 5, 2022P00798$11.5KTHIS MODIFICATION IS TO FUND THE FACILITY COSTS ASSOCIATED WITH THE EXPLOSIVE PRODUCTION THAT WAS EXECUTED UNDER SUPPLY CONTRACT W52P1J-19-D-0074 DELIVERY ORDER W519TC-23-F-0028
Dec 5, 2022P00801$4.4MMODIFICATION TO AWARD ENGINEERING CHANGE #3 TO CLOSE ADDITIONAL ACREAGE AND OTHER WORK TO LANDFILL EXPANSION PHASE 3 AWARDED UNDER MOD P00733
Nov 18, 2022P00794$94.4KFY23 FUNDING OBLIGATED FOR REQUIREMENTS OF PWS G AND PWS K.
Nov 15, 2022P00796$259.7KDIFFERING SITE CONDITION ACETIC ACID AND ANHYDRIDE FACILITY. SUBMITTED AS A REQUEST FOR EQUITABLE ADJUSTMENT.
Nov 4, 2022P00792$63.6MNEW FILTRATION & WASH FACILITY BUILDING AND COMMISSIONING AND TRANSFER TO PRODUCTION AT HOLSTON ARMY AMMNUITION PLANT
Oct 11, 2022P00793$0UPDATE ISSUED BY DODAAC & INCORPORATE MILESTONE PAYMENTS FOR KETTLE DRYING MODIFICATION P00783
Sep 30, 2022P00783$6.8MDEFINITIZATION OF KETTLE DRYING FACILITY PROJECT AT HOLSTON ARMY AMMUNITION PLANT (HSAAP).
Sep 30, 2022P00789$4.4MTHIS AMMONIA TANK FARM IS TO PROVIDE AN ALTERNATE SOURCE OF ANHYDROUS AMMONIA FOR BUILDING 320 AND THE AMMONIUM NITRATE PROCESS FOR RDX AND HMX PRODUCTION. THIS ALSO INCLUDES A DEOB OF DESCOPE WORK RELATING TO P00747.
Sep 30, 2022P00791$0THE PURPOSE OF MODIFICATION P00791 IS TO EXTEND CONTRACT DAAA09-98-E-0006 BY 12 MONTHS. THIS CONTRACT IS FOR THE OPERATION AND MAINTENANCE AT THE HOLSTON ARMY AMMUNITION PLANT.
Sep 28, 2022P00790$3.4MTHIS MODIFICATION IS TO AWARD PHASE 1B OF THE TOLUENE EMISSIONS REDUCTION PROJECT AT HSAAP.
Sep 27, 2022P00787$1.6MBOXWAY UPGRADE DESIGN ECP MODERNIZATION EFFORT - NEGOTIATION WITH HSAAP FACILITY OPERATOR BAE.
Sep 27, 2022P00788$312.7KOPEN BURN FLASHING FURNACE TRUCK SCALE SITE ENGINEERING CHANGE AT HSAAP.
Sep 9, 2022P00786$14.3KFY22 INSTALLATION SUPPORT
Aug 31, 2022P00785$631.3KREQUEST FOR EQUITABLE ADJUSTMENT DUE TO INADVERTENT OMISSION OF IMPACT TEST MACHINES FROM ANALYTICAL LAB PROJECT AT HOLSTON ARMY AMMUNITION PLANT
Jul 15, 2022P00784$2.8MDEFINITIZE UCO FOR EXECUTION OF TATB TOLUENE EMISSIONS REDUCTION PROJECT - PHASE 1A
Jun 28, 2022P00782$259.5KAWARD OUTFALL 40 PROJECT, POP EXTENSION FOR CRITICAL SPARE PARTS, AND INCORPORATE REVISED ATTACHMENTS 0864 AND 0881.
Jun 27, 2022P00780$1.1MSETTLEMENT OF REA FOR HPCON CHANGED CONDITION AT HOLSTON DUE TO COVID-19
Jun 27, 2022P00781$0THIS MODIFICATION IS A NO COST EXTENSION AND REVISION TO ATTACHMENT 0904.
Jun 22, 2022P00778$18.8MDEFINITIZATION OF ACETIC ACID EXPANSION PROJECT AT HOLSTON ARMY AMMUNITION PLANT (HSAAP)
Jun 14, 2022P00779$11.1MMODERNIZATION OF CYBERSECURITY AT HOLSTON ARMY AMMUNITION PLANT (HSAAP) PHASE II.
May 23, 2022P00777$88.7KDEFINITIZE UCO FOR ANSOL PILOT TEST STUDY AND DEOB FUNDS FOR PREVIOUS ANSOL PROJECT
May 16, 2022P00774$-9.6KTHIS MODIFICATION IS TO DEOB, UPDATE PWS, INCORPORATE WAGE DETERMINATIONS, AND INCORPORATE DEVIATION 2018-O0015 TO THE CONTRACT.
May 10, 2022P00775$178.8KMODIFICATION IS TO DEFINITIZE AND FULLY FUND ANSOL TANK FARM SUPPORT EFFORT AT HSAAP.
May 4, 2022P00776$117.2KAWARD PILOT SCALE MANUFACTURE OF CXM-7
Mar 3, 2022P00773$53.7MTHIS MODIFICATION IS TO INCREASE THE FUNDING OF THE NITRATION CONSTRUCTION PROJECT THAT WAS ORIGINALLY EXECUTED AS A NTE. ONCE THE QUALIFYING PROPOSAL WAS RECEIVED IT WAS DETERMINED TO UPDATE THE VALUE/FUNDING AVAILABLE TO 75%.
Feb 7, 2022P00772$2.3MMODIFICATION TO DEFINITIZE LANDFILL EXPANSION PHASE 3 ECP #1 AND UPDATE DFARS CLAUSES
Jan 26, 2022P00771$420.7KTHIS MODIFICATION IS FOR THE FACILITY OPERATOR TO COMPLETE THE DEVELOPMENT TOWARDS THE MANUFACTURE OF KNO3 FROM HSAAP ANSOL.
Jan 3, 2022P00770$795.5KTHIS REQUIREMENT IS FOR THE RECLAMATION OF TATB FROM LX-17 MACHINE CUTTINGS.
Nov 29, 2021P00768$224THIS REQUIREMENT IS FOR THE PC&H OF ONE POUND OF COMP CH6 TO BE DELIVERED FROM BAE-HSAAP TO THE DESIRED END LOCATION.
Nov 5, 2021P00767$3.6MMODIFICATION TO ADD FUNDING TO CONTRACT FOR ECP/UCO FOR DIFFERING SITE CONDITION FOR CLAY HAULING FOR LANDFILL EXPANSION PHASE 3 PROJECT AND INCORPORATE 2 REVISED ATTACHMENTS FOR OTHER PROJECTS.
Oct 28, 2021P00766$62.0KMODIFICATION TO ADD FY22 FUNDING FOR PWS G & INCORPORATE REVISED ATTACHMENT 0878 - PAYMENT MILESTONE
Sep 29, 2021P00764$43.0MUNPRICED CHANGE ORDER FOR THE FINAL DESIGN, BUILD, COMMISSION AND TRANSFER TO PRODUCTION OF KETTLE DRYING FACILITY AT HOLSTON ARMY AMMUNITION PLANT
Sep 29, 2021P00765$42.6MMODIFICATION TO INCORPORATE UNPRICED CHANGE ORDER FOR NEW NITRATION FACILITY AT HOLSTON ARMY AMMUNITION PLANT.
Sep 28, 2021P00762$106.3MUNDEFINITIZED CHANGE ORDER (UCO) FOR THE AAA BUILD PROJECT AT HOLSTON ARMY AMMUNITION PLANT (HSAAP)
Sep 24, 2021P00763$10.4MMODIFICATION IS TO AWARD SEWER REHABILITATION PHASE 2 PROJECT AT HSAAP.
Aug 31, 2021P00760$30.4KMODIFICATION P00760 IS TO ADD FUNDING FOR PWS K WHICH WAS NEGOTIATED AND AGREED TO UNDER MOD P00657
Aug 31, 2021P00761$10.0MADDITIONAL FUNDING DUE TO 10% TO 90% MATURITY OF DESIGN OF WAARP TANK FARM CONSTRUCTION PROJECT AT HOLSTON ARMY AMMUNITION PLANT (HSAAP)
Aug 26, 2021P00758$43.8MOPEN BURN FLASH FURNACE CONSTRUCTION AT HOLSTON ARMY AMMUNITION PLANT.
Aug 18, 2021P00759$11.9KTHIS REQUIREMENT IS FOR THE PACKAGING, CRATING, AND HANDLING OF NQ AND COMP CH6 MATERIAL TO BE DELIVERED TO ITS END LOCATION.
Aug 4, 2021P00757$92.1KFILTER & WASH MOD P00716 CHANGED SITE SOIL CONDITION
Jun 30, 2021P00754$7.6KFY21 INSTALLATION SUPPORT
Jun 30, 2021P00756$0MODIFICATION P00756 IS CORRECT WAGE DETERMINATION REFERENCE IN MODIFICATION P00729
Jun 25, 2021P00755$54.2KMODIFICATION TO ADD AMC BUILDER ASSESSMENT SUPPORT PROJECT
Jun 22, 2021P00752$51.1KDIFFERING SITE (SOIL) CONDITION ON NEUTRALIZATION BASIN UPGRADE P00727
Jun 17, 2021P00753$0MOD P00753 IS FOR SETTLEMENT OF A CLAIM
Jun 1, 2021P00751$717.5KENGINEERING CHANGE FOR ADDITIONAL FILTERED WATER STORAGE FOR FIRE PROTECTION TO AAA DESIGN PROJECT.
May 26, 2021P00750$88.4KTHE PURPOSED OF THIS MOD IS TO AWARD PART 1 OF THE PWS T TO DEVELOP A TRANSITION PLAN.
May 20, 2021P00749$-36.9KTHIS MODIFICATION IS FOR THE DESCOPE OF CLIN 0030GE (KETTLE DRYING DESIGN) STATEMENT OF WORK.
Apr 30, 2021P00748$1.4MTHIS EFFORT IS FOR A MODERNIZATION EFFORT BY THE GOCO OPERATOR BAE TO COMPLETE THE SUPPORT OF THE DEVELOPMENT OF EDC FACILITY PRELIMINARY DESIGN AND PERMIT PACKAGES AT HSAAP.
Apr 29, 2021P00747$2.4MDEWATERING TECHNOLOGY STUDY
Apr 28, 2021P00746$684.2KTHIS MODIFICATION IS TO FUND THE COST OVERRUN OF THE NITRATION BUILDING "D" DESIGN EFFORT AWARDED UNDER P00706.
Apr 26, 2021P00745$336.7KADDITIONAL FUNDING FOR THE WET SCRUBBER OPTION ON FLASH FURNACE OPEN BURN DESIGN.
Apr 7, 2021P00744$448THIS MODIFICATION IS FOR THE PACKAGING, CRATING, AND HANDLING OF COMP B AND COMP CH6 TO INCLUDE A SHIP TO LOCATION FOR USG LAP FACILITIES. THIS MODIFICATION IS EXECUTED TO THE HSAAP GOCO OPERATOR, BAE.
Mar 30, 2021P00742$34.8MCONSTRUCTION OF MELT CAST FACILITY AT HOLSTON ARMY AMMUNITION PLANT (HSAAP).
Mar 24, 2021P00743$69.2MCONSTRUCTION OF ANALYTICAL LAB AT HOLSTON ARMY AMMUNITION PLANT
Feb 18, 2021P00741$292.6KCHANGE PROPOSAL FOR RETROFITTING TOTES FOR FLUID ENERGY MILL
Feb 11, 2021P00740$250.8KLAYAWAY OF INACTIVE FACILITY DEMO REQUEST FOR EQUITABLE ADJUSTMENT DUE TO DELAY IN DD337S.
Feb 2, 2021P00738$301.2KADDING FUNDS TO A2B PROJECT TO INCREASE COST CEILING.
Jan 22, 2021P00739$51.9KENGINEERING CHANGE PROPOSAL FOR OB FLASH FURNACE DESIGN WASTE STREAM ANALYSIS
Jan 7, 2021P00737$224PC&H FOR COMP CH-6
Dec 29, 2020P00735$6.2MMODIFICATION IS TO AWARD CRITICAL SPARE PARTS AND FACILITY MAINTENANCE PROJECT AT HSAAP.
Dec 29, 2020P00736$8.1MSETTLEMENT OF REQUEST FOR EQUITABLE ADJUSTMENT FOR PWS A PERIOD OF PERFORMANCE OF 01 OCTOBER 2017 THRU 31 DECEMBER 2017 AND 01 JANUARY 2018 TO 30 SEPTEMBER 2018.
Dec 17, 2020P00734$-8.8MDECREASE TO WEAK ACETIC ACID RECOVERY FACILITY AWARD
Dec 8, 2020P00732$89.9KMODIFICATION P00732 IS TO ADD FUNDING FOR PWS G&K FOR FY21 AND INCORPORATE REVISED ATTACHMENTS 0851 AND 0852
Dec 2, 2020P00733$19.2MMODIFICATION P00733 TO AWARD LANDFILL EXPANSION PHASE 3 PROJECT AS HOLSTON ARMY AMMUNITION PLANT
Oct 8, 2020P00729$0INCORPORATE WAGE DETERMINATIONS AS DIRECTED BY THE DEPARTMENT OF LABOR
Sep 29, 2020P00730$2.0MMODIFICATION TO AWARD RIVER WATER UPGRADE CLOSED LOOP STUDY PROJECT.
Sep 28, 2020P00725$9.2KMODIFICATION TO INCORPORATE FAR 52.204-25 AND INCORPORATE ECP FOR LANDFILL DESIGN.
Sep 28, 2020P00731$159.7KMODIFICATION TO AWARD ON-SITE ANSOL SUPPORT PROJECT AT HSAAP
Sep 24, 2020P00728$144.3MCONSTRUCTION OF THE WEAK ACETIC ACID RECOVERY PROJECT (WAARP) B2 FACILITY AND TANK FARM AT HSAAP.
Sep 22, 2020P00726$-705.0KTHIS REQUIREMENT IS TO DEOBLIGATE FUNDS FOR A REQUIREMENT HAS WAS PREVIOUSLY STARTED AND THEN CANCELLED.
Sep 21, 2020P00716$17.2MDESIGN FOR NEW FILTRATION AND WASH FACILITY BUILDING E.
Sep 21, 2020P00727$17.5MNEUTRALIZATION BASIN UPGRADES FOR IWWTF AT HSAAP
Aug 25, 2020P00723$3.9KTHIS REQUIREMENT IS TO INCORPORATE THE CURRENT PROPERTY LISTINGS AND TO OBLIGATE FUNDING FOR PBXW-14 (5,441 POUNDS) PC&H COSTS.
Aug 25, 2020P00724$28.3KIN SCOPE CHANGE ORDER TO P00684 FEASIBILITY STUDY
Aug 18, 2020P00721$63.6KMODIFICATION TO AWARD COMMANDERS OFFICE RENOVATION AND OFFICE FURNITURE PURCHASE PROJECTS.
Aug 12, 2020P00722$99.5KADDITIONAL BUILDINGS ADDED TO INVENTORY, MODEL, AND PRIORITIZE EXISTING STATE OF INFORMATION SYSTEMS ARCHITECTURE AT HSAAP
Aug 4, 2020P00719$727.1KADDING FUNDS TO A2B PROJECT, AND ADDING BATCH TESTING TO COMMISSIONING OF A2B
Aug 3, 2020P00720$2.4MTHIS MODIFICATION IS FOR THE MODERNIZATION EFFORT FOR THE PRELIMINARY DESIGN OF A KETTLE DRYING FACILITY.
Jul 15, 2020P00717$425.5KTHIS MODIFICATION IS FOR THE MODERNIZATION EFFORT FOR THE MANUFACTURE OF POTASSIUM NITRATE FROM HSAAP ANSOL.
Jul 13, 2020P00718$122.8KMODIFICATION P00718 IS TO AWARD THE OFF-SITE ANSOL STUDY SUPPORT PROJECT.
May 27, 2020P00715$52.5KENVIRONMENTAL INSTALLATION RESTORATION SUPPORT PROJECT 2020 AT HSAAP
May 22, 2020P00714$1.2MECP FOR NACSAC LOW POINT DRAIN INSTALLATION.
Apr 30, 2020P00713$3.8KCHANGE PROPOSAL FOR OPEN BURN TREATMENT FACILITY SITE ASSESSMENT
Apr 27, 2020P00711$224THIS MODIFICATION IS FOR THE PACKAGING, CRATING, AND HANDLING FOR 360 POUNDS OF COMP CH6 TO BE DELIVERED TO IOWA ARMY AMMUNITION PLANT IN MIDDLETON, IA TO INCLUDE THE REDUCTION IN PWS B MILESTONE PAYMENTS.
Apr 24, 2020P00712$8.1MDESIGN OF THE OPERATIONS FLASH FURNACE TYPE TREATMENT TECHNOLOGY, INCLUDING AIR POLLUTION CONTROLS.
Apr 21, 2020P00709$231.2KADDITIONAL FUNDING FOR WAARP COST OVERRUN.
Apr 2, 2020P00710$4.1KTHIS CONTRACT IS FOR THE HOLSTON ARMY AMMUNITION PLANT FACILITY CONTRACT - THIS MODIFICATION IS EXECUTED FOR THE PC&H COSTS FOR COMPOSITION B&CH6.
Feb 3, 2020P00707$0THIS MODIFICATION IS TO CHANGE THE PERFORMANCE COMPLETION DATE OF CLIN 0009GS&CLIN 0009P TO 28 FEB 2020.
Jan 21, 2020P00708$349.3KOPEN BURN TREATMENT FACILITY SITE ASSESSMENT FOR THE DESIGN/BUILD OF FLASH FURNACE FACILITY AT HSAAP.
Jan 15, 2020P00700$89.1KP00700 IS TO PROVIDE FUNDING FOR THE DIRECT FUNDED PWSS G AND K - ONSITE GOVERNMENT STAFF AND MATERIAL MANAGEMENT FOR FISCAL YEAR 2020.
Jan 15, 2020P00702$-1.2KTHE PURPOSE OF THIS MODIFICATION IS TO REDUCE THE OVERALL VALUE FOR THE ANALYTICAL LAB (MODIFICATION P00653) MODERNIZATION EFFORT BY $1,169.00 DUE TO A REDUCE IN SCOPE.
Dec 31, 2019P00706$5.6MDESIGN OF NITRATION FACILITY BUILDING "D" FOR RDX/HMX EXPANSION.
Dec 30, 2019P00705$4.8MENGINEERING CHANGE PROPOSAL FOR THE NATURAL GAS FIRED STEAM FACILITY ADDING NATURAL GAS METER STATION TO PROJECT.
Dec 20, 2019P00704$2.3MBOXWAY UPGRADE DESIGN MODERNIZATION EFFORT - NEGOTIATION WITH HSAAP FACILITY OPERATOR BAE.
Dec 12, 2019P00703$0MIF FY20-CORRECTION TO CONTRACT TYPE FIRM FIXED PRICE.
Dec 11, 2019P00698$448.3KINVENTORY, MODEL, AND PRIORITIZE EXISTING STATE OF INFORMATION SYSTEMS ARCHITECTURE AT HSAAP.
Dec 11, 2019P00701$5.3KMAINTENANCE OF INACTIVE FACILITIES (MIF) FY20
Dec 3, 2019P00699$4.6MWAARP&ANSOL ACID TANK FARM DESIGN
Nov 26, 2019P00694$224THIS CONTRACT IS THE FACILITY CONTRACT FOR BAE FOR THE HOLSTON ARMY AMMUNITION PLANT. THIS MODIFICATION IS FOR THE PACKAGING, CRATING AND HANDLING OF PBXN-12 TO DZI KANSAS
Nov 7, 2019P00697$-190.4KENGINEERING CHANGE PROPOSAL AWARD FOR DIFFERING SITE CONDITION FOUND DURING ELEVATOR AND LIFT PROJECT P00665.
Sep 27, 2019P00695$7.8MLAY AWAY OF INACTIVE FACILITIES BUILDING DEMOLITION
Sep 26, 2019P00696$846.0KENGINEERING CHANGE FOR THE NATURAL GAS FIRED STEAM DESIGN/CONSTRUCT PROJECT. CHANGE IS TO WRAP/COAT 2 NATURAL GAS PIPELINES THAT CROSS HOLSTON RIVER.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2027-03-31 (157 days from calculation)
+35 points
0 historical awards in this buyer and category group
+0 points
761 recorded award transactions
+10 points
Latest award action: 2026-04-21
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.