Federal contract award

DEAC0200DP00229

TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeNNSA NON-MO CNTRCTNG OPS DIV
NAICS334517 — Irradiation Apparatus Manufacturing
PSC4470 — Nuclear Reactors
Parent award / vehicleNot reported
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$221.4M
Current contract value$419.6M
Potential contract value / ceiling$419.6M
Start dateJul 15, 2000
Current end dateSep 30, 2034
Potential end dateSep 30, 2044
Latest award activityOct 1, 2026
Source loadedOct 17, 2026

Funding and modification history

Showing the latest 105 of 105 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Oct 1, 2026104$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Jul 23, 2026103$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Mar 23, 2026102$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Feb 24, 2026101$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Dec 18, 2025100$25.2MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Dec 11, 202599$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Jun 9, 202598$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
May 7, 202597$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Apr 28, 202596$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Mar 13, 202595$561.8KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Feb 27, 202594$24.4MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Feb 14, 202593$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Sep 19, 202492$4.2MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE V OPTION)
Jun 6, 202491$0THE CONTRACT IS REVISED TO PROVIDE FOR REALIGNMENT DUE TO RECASTING OF FUNDS FROM FY24. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 21, 202490$0THE CONTRACT IS REVISED TO PROVIDE FOR REALIGNMENT DUE TO RECASTING OF FUNDS FROM FY22 AND FY23 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Apr 11, 202489$0THE CONTRACT IS REVISED TO PROVIDE FOR A FUNDING REALIGNMENT DUE TO THE INACTIVITY REALIZED UNDER CLIN 0005 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Mar 1, 202488$7.9MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 26, 202387$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
May 15, 202386$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Mar 27, 202385$15.6MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 15, 202284$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jun 16, 202283$6.6MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
May 3, 202282$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Mar 29, 202281$15.3MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jan 20, 202280$0THE PURPOSE OF THIS MODIFICATION IS TO: 1. CHANGE THE CONTRACTING OFFICER AND INVOICE APPROVING OFFICIAL FROM RITA PERNELL TO CHELSEA MURPHY. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Dec 17, 202179$0THIS MODIFICATION PROVIDES FOR A CHANGE IN THE CONTRACTING OFFICER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Nov 18, 202178$0THIS MODIFICATION PROVIDES FOR A CORRECTION TO INCREASE THE ESTIMATED PRICE IN SUBSECTION B.4.B.I. BY $666,335.79. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 8, 202177$765.1KTHE PURPOSE OF THIS MODIFICATION IS TO (1) INCORPORATE THE REQUIREMENT FOR AN ADDITIONAL 3500 MULTIPLE TUBES AIR GAUGE SYSTEM (MTAGS) PRE-COATED INNER DIAMETER MEASUREMENTS AND (2) REVISE THE NOTE UNDER CLIN 0005 TO RECOGNIZE THE MOD 0075 FUNDING REA
Aug 3, 202176$0CHANGE LANGUAGE FOR SPARES. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jul 8, 202175$0THE CONTRACT IS REVISED TO PROVIDE FOR A FUNDING REALIGNMENT DUE TO THE INACTIVITY REALIZED UNDER CLIN 0005 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Apr 13, 202174$15.4MCONTRACTOR FISCAL YEAR (CFY) 2021 ACTIVITIES. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Mar 11, 202173$666.3KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A CHANGE IN THE DOE PROGRAM OFFICIAL TO KYLE WILHELM. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jun 18, 202072$0THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A CHANGE IN THE DOE PROGRAM OFFICIAL TO KYLE WILHELM. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jun 16, 202071$0THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A CHANGE IN THE DOE TECHNICAL MANAGER TO KYLE WILHELM. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Apr 16, 202070$14.5MTHIS MODIFICATION IS ISSUED PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $14,529,292.15 FOR CONTRACTOR FISCAL YEAR 2020 ACTIVITIES. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Apr 1, 202069$482.5KTHIS MODIFICATION IS ISSUED TO (1) INCORPORATE 70 ADDITIONAL QUANTITIES OF TPBARS UNDER SUB-CLIN 0003A; (2) INCORPORATE 110 ADDITIONAL QUANTITIES OF TUBES AND ASSOCIATED PRE-COATED TUBE MEASUREMENTS UNDER SUB-CLINS 0003B.2 AND 0003B.3, RESPECTIVELY;
Dec 5, 201968$0THIS MODIFICATION IS ISSUED TO CHANGE THE NAME FROM WESDYNE INTERNATIONAL LLC TO WESTINGHOUSE GOVERNMENT SERVICES, LLC
Sep 3, 201967$109.3KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
Aug 6, 201966$519.4KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
Mar 18, 201965$15.6MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
Aug 7, 201864$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
Jul 12, 201863$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
May 3, 201862$2.1MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
Apr 6, 201861$4.5MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
May 18, 201760$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
May 17, 201759$5.1MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
May 31, 201658$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
Dec 21, 201557$7.0MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION (PHASE IV OPTION)
Sep 30, 201556$1.2MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Aug 11, 201555$1.1MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Feb 5, 201554$1.9MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Oct 14, 201453$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Sep 17, 201452$1.2MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Aug 26, 201451$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Mar 21, 201450$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Mar 14, 201449$2.0MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Jun 27, 201348$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSISTANT DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Nov 20, 201247$1.9MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR OFFICE OF NUCLEAR EXPERIMENTS - NA-123.
Jul 25, 201246$-1.6MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR ASSOCIATE DEPUTY ADMINISTRATOR FOR STOCKPILE MANAGEMENT - NA-12.
Mar 31, 201145$-6.8MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION FOR OFFICE OF RESEARCH, DEVELOPMENT&SIMULATION - NA-12.
Dec 2, 201044$0TAS::89 0240::TAS TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Nov 23, 201043$26.4MTAS::89 0240::TAS TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Nov 22, 201042$-26.4MTAS::89 0240::TAS TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Oct 14, 201041$0TAS::89 0240::TAS TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 23, 201040$5.4MTAS::89 0240::TAS TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 29, 2009A038$258.4KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 29, 2009A039$24.1MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 17, 2008A037$740.9KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Aug 27, 2008A036$172.7KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jul 24, 2008A035$727.6KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jun 2, 2008A033$602.6KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jun 2, 2008A034$1.6MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Apr 24, 2008A032$3.2MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jan 29, 2008A031$-70.0KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Dec 31, 2007A030$48.8KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 20, 2007A028$6.8KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 20, 2007A029$47.2KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jun 27, 2007A026$138.5KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jun 27, 2007A027$75.0KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Apr 12, 2007A025$1.1MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Mar 9, 2007A024$45.0KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
May 31, 2006A023$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jan 25, 2006A022$49.9KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jan 4, 2006A021$0TRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Aug 25, 2005A020$82.3KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Aug 17, 2005A019$1.7MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
May 27, 2005A018$64.1KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 27, 2004A017$5.7MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Aug 27, 2004A016$-2.6MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jun 14, 2004A015$204.4KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
May 27, 2004A014$18.0KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
May 5, 2004A012$304.2KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
May 5, 2004A013$227.8KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Nov 26, 2003A011$238.3KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 15, 2003A010$959.8KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jun 15, 2003A009$503.4KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Apr 15, 2003A008$125.2KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Sep 15, 2002A007$50.7KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Aug 15, 2002A006$156.9KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jul 15, 2002A005$341.7KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Apr 15, 2002A004$342.6KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Feb 15, 2002A003$645.8KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Aug 15, 2001A001$49.2KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Aug 15, 2001A002$32.9KTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION
Jul 15, 20000$6.4MTRITIUM PRODUCING BURNABLE ABSORBER ROD (TPBAR) FABRICATION

Estimated positioning window

Sep 30, 2043 – Mar 30, 2044

Recompete signal:
25/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 25/100. Available recorded signals: 20 points.

Contract end 2044-09-30 (6550 days from calculation)
+5 points
0 historical awards in this buyer and category group
+0 points
105 recorded award transactions
+10 points
Latest award action: 2026-10-01
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.