| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | SC OAK RIDGE OFFICE |
| NAICS | 561210 — Facilities Support Services |
| PSC | M181 — Operation of Government-Owned Contractor-Operated (GOCO) R&D Facilities |
| Parent award / vehicle | Not reported |
| Set-aside | Not reported |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $42.4B |
| Current contract value | $43.6B |
| Potential contract value / ceiling | $43.6B |
| Start date | Feb 1, 2000 |
| Current end date | Mar 31, 2030 |
| Potential end date | Mar 31, 2030 |
| Latest award activity | Aug 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 1,370 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 27, 2026 | 1408 | $107.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Aug 27, 2026 | 1409 | $71.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Aug 17, 2026 | 1407 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jul 31, 2026 | 1405 | $129.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jul 31, 2026 | 1406 | $31.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jul 21, 2026 | 1404 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jun 26, 2026 | 1403 | $262.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jun 25, 2026 | 1402 | $279.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| May 28, 2026 | 1400 | $133.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| May 28, 2026 | 1401 | $22.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| May 6, 2026 | 1399 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Apr 29, 2026 | 1397 | $506.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Apr 29, 2026 | 1398 | $80.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Mar 27, 2026 | 1395 | $100.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Mar 27, 2026 | 1396 | $34.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Feb 26, 2026 | 1393 | $167.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Feb 26, 2026 | 1394 | $23.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Feb 6, 2026 | 1392 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jan 29, 2026 | 1390 | $67.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jan 29, 2026 | 1391 | $18.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Dec 23, 2025 | 1388 | $66.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Dec 23, 2025 | 1389 | $105.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Dec 16, 2025 | 1387 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Nov 25, 2025 | 1386 | $7.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Nov 24, 2025 | 1384 | $509.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Nov 24, 2025 | 1385 | $495.0K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Nov 14, 2025 | 1382 | $17.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Nov 14, 2025 | 1383 | $2.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Oct 31, 2025 | 1380 | $12.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Oct 31, 2025 | 1381 | $334.7K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Sep 30, 2025 | 1377 | $191.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Sep 30, 2025 | 1378 | $133.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Sep 30, 2025 | 1379 | $2.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Aug 29, 2025 | 1375 | $181.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Aug 29, 2025 | 1376 | $20.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jul 31, 2025 | 1374 | $24.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jul 30, 2025 | 1373 | $117.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jul 10, 2025 | 1370 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Jun 27, 2025 | 1371 | $323.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Jun 27, 2025 | 1372 | $1.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Jun 18, 2025 | 1362 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| May 28, 2025 | 1368 | $203.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| May 28, 2025 | 1369 | $24.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| May 13, 2025 | 1365 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Apr 30, 2025 | 1366 | $165.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Apr 30, 2025 | 1367 | $39.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Mar 28, 2025 | 1363 | $6.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Mar 28, 2025 | 1364 | $1.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Mar 14, 2025 | 1361 | $10.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT |
| Mar 13, 2025 | 1360 | $55.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Mar 7, 2025 | 1359 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY CONTRACT EXTENSION. |
| Mar 5, 2025 | 1351 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Feb 27, 2025 | 1357 | $29.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE FUNDS. |
| Feb 27, 2025 | 1358 | $40.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE FUNDS. |
| Feb 7, 2025 | 1340 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $7,858,834.54 IN NASA FUNDS FOR JULY 2024. |
| Feb 7, 2025 | 1356 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Jan 31, 2025 | 1354 | $437.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Jan 31, 2025 | 1355 | $16.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Dec 20, 2024 | 1352 | $116.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Dec 20, 2024 | 1353 | $81.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Dec 5, 2024 | 1346 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Nov 22, 2024 | 1349 | $77.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Nov 22, 2024 | 1350 | $13.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Oct 30, 2024 | 1347 | $361.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Oct 30, 2024 | 1348 | $2.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Sep 26, 2024 | 1344 | $113.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Sep 26, 2024 | 1345 | $106.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Sep 16, 2024 | 1334 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TO REPLACE CHANGE NOTICE (RCN) OR 96 WITH RCN OR 97 DATED MAY 29,2024, IN SECTION J, APPENDIX E. |
| Sep 12, 2024 | 1343 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Sep 10, 2024 | 1339 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Aug 30, 2024 | 1341 | $119.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $120,925,369.05 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $1,701,471.41 CUMULATIVE NAF = $1,150,371,462.52 |
| Aug 30, 2024 | 1342 | $57.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $57,636,916.41 IN DEPARTMENT OF DEFENSE FUNDS FOR AUGUST 2024. |
| Jul 31, 2024 | 1338 | $7.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $7,858,834.54 IN NASA FUNDS FOR JULY 2024. |
| Jul 30, 2024 | 1337 | $196.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $198,456,100.69 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $2,345,745.20 CUMULATIVE NAF = $1,148,669,991.11 |
| Jun 27, 2024 | 1336 | $10.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $10,064,475.52 NASA FUNDS FOR JUNE 2024. |
| Jun 26, 2024 | 1335 | $265.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $265,679,247.32 IN DOE AND UKRAINE FUNDS FOR JUNE 2024. |
| May 30, 2024 | 1332 | $227.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $227,625,483.11 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $674,944.66 CUMULATIVE NAF = $1,108,113,843.38 |
| May 30, 2024 | 1333 | $26.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $26,813,341.46 IN SPP/VA MAY 2024. |
| Apr 30, 2024 | 1330 | $244.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $244,014,467.65 IN DOE FUNDS. |
| Apr 30, 2024 | 1331 | $22.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $25,437,315.24. NON-APPROPRIATED FUNDING (NAF): $2,753,819.60 IN NAF AND 22,683,495.64 IN STRATEGIC PARTNERSHIP PROJECTS |
| Apr 12, 2024 | 1326 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TO REPLACE CHANGE NOTICE (RCN) OR 95 WITH RCN OR 96 DATED FEBRUARY 29,2024, IN SECTION J, APPENDIX E. |
| Apr 8, 2024 | 1329 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY UPDATE CONTRACT SECTIONS H & J. |
| Mar 28, 2024 | 1327 | $154.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $155,433,372.23 IN DOE FUNDS. CURRENT NAF = 1,148,296.43 CUMULATIVE NAF = $1,082,001,583.48 |
| Mar 28, 2024 | 1328 | $19.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $19,849,331.79 IN SPP/NASA MAR 2024. |
| Feb 29, 2024 | 1325 | $11.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $11,665,453.95 IN SPP/NASA FEB 2024. |
| Feb 28, 2024 | 1324 | $228.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $231,870,745.18 IN DOE FUNDS. CURRENT NAF = $3,085,400.71 CUMULATIVE NAF = $1,080,853,287.05 |
| Jan 29, 2024 | 1322 | $35.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $37,154,515.28 IN DOE FUNDS. CURRENT NAF = $1,482,000.00 CUMULATIVE NAF = $1,077,767,886.34 |
| Jan 29, 2024 | 1323 | $14.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $14,105,819.68 IN SPP/AIR FORCE JAN 2024. |
| Jan 19, 2024 | 1321 | $57.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $57,931,180.31 IN DOE FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $1,075,876,864.15 |
| Dec 26, 2023 | 1318 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TO REPLACE CHANGE NOTICE (RCN) OR 94 WITH RCN OR 95 DATED NOVEMBER 30, 2023 , IN SECTION J, APPENDIX E. |
| Dec 26, 2023 | 1319 | $277.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $277,946,265.36 IN DOE FUNDS AND NON APPROPRIATED FUNDS. CURRENT NAF = $604,865.60 CUMULATIVE NAF = $1,075,876,864.15 |
| Dec 26, 2023 | 1320 | $10.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $10,505,105.61 IN SPP/NASA DEC 2023. |
| Nov 30, 2023 | 1317 | $34.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $34,642,307.51 IN DOE FUNDS. |
| Nov 17, 2023 | 1315 | $58.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $59,576,208.83 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = 1,508,993.30 CUMULATIVE NAF = $1,075,271,998.55 |
| Nov 17, 2023 | 1316 | $23.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $23,926,003.89 IN SPP/DOD NOV 2023. |
| Oct 30, 2023 | 1313 | $222.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $225,582,556.21 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $3,137,419.40 CUMULATIVE NAF = $1,073,763,005.25 |
| Oct 30, 2023 | 1314 | $628.2K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $628,194.11 IN SPP/AIR FORCE OCT 2023. |
| Sep 29, 2023 | 1311 | $169.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $170,922,037.28 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $1,373,418.26 CUMULATIVE NAF = $1,070,625,585.85 |
| Sep 29, 2023 | 1312 | $36.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $36,528,971.72 IN SPP/STATE SEPT 2023. |
| Sep 28, 2023 | 1310 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TO REPLACE CHANGE NOTICE (RCN) OR 93 WITH RCN OR 94 DATED AUGUST 31, 2023 , IN SECTION J, APPENDIX E. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Aug 31, 2023 | 1308 | $330.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $181,296,450.60 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $(149,167,944.39) CUMULATIVE NAF = $1,069,252,167.59 |
| Aug 31, 2023 | 1309 | $57.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $57,751,440.94 IN SPP/COMMERCE AUG 2023. |
| Jul 31, 2023 | 1307 | $21.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $21,803,878.46 IN SPP/VA JUL 2023. |
| Jul 28, 2023 | 1306 | $143.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $151,713,866.61 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF $7,824,194.93 CUMULATIVE NAF $1,218,420,111.98. |
| Jun 30, 2023 | 1302 | $38.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $38,066,445.20 IN DOE FUNDS. CURRENT NAF = $0 CUMULATIVE NAF = $1,168,776,768.12. |
| Jun 30, 2023 | 1303 | $38.0K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $41,857,148.93 IN DOE UKRAINE AND NON APPROPRIATED FUNDS. CURRENT NAF = $41,819,148.93 CUMULATIVE NAF = $1,210,595,917.05. |
| Jun 30, 2023 | 1304 | $11.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 0400 :: TAS SPP/DOD PREDOMINANT FUNDING JUNE 2023, OBLIGATING NET $11,040,825.05 WHICH INCLUDES $436,893.20 IN COVID FUNDS FROM TAS 75 0943. |
| Jun 30, 2023 | 1305 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY - CORRECTING TYPOGRAPHICAL ERROR ON 1304. |
| May 31, 2023 | 1301 | $864.2K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $864,153.23 IN DOE FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $1,168,776,768.12. |
| May 30, 2023 | 1298 | $100.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $100,204,571.49 IN DOE FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $1,133,156,812.20. |
| May 30, 2023 | 1299 | $-2.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $35,619,955.92 IN DEOBLIGATED DOE UKRAINE AND NON APPROPRIATED FUNDS. CURRENT NAF = $35,619,955.92 CUMULATIVE NAF = $1,168,776,768.12. |
| May 30, 2023 | 1300 | $36.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 36 0167 :: TAS SPP/VA PREDOMINANT FUNDING MAY 2023 |
| May 23, 2023 | 1294 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY // TO REPLACE REQUIREMENT CHANGE NOTICE (RCN) OR-91 WITH RCN OR-92 DATED MARCH 26, 2023 |
| Apr 28, 2023 | 1295 | $179.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $179,560,409.05 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $12,306,375.80 CUMULATIVE NAF = $1,133,156,812.20. |
| Apr 28, 2023 | 1296 | $12.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 0400 :: TAS SPP/DOD PREDOMINANT FUNDING APR 2023 |
| Apr 28, 2023 | 1297 | $-74 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $12,306,301.73 IN DEOBLIGATED DOE COVID AND NON APPROPRIATED FUNDS. CURRENT NAF = $12,306,375.80 CUMULATIVE NAF = $1,133,156,812.20. |
| Mar 31, 2023 | 1292 | $440.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $453,538,262.51 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $12,780,417.50 CUMULATIVE NAF = $1,120,850,436.40. |
| Mar 31, 2023 | 1293 | $19.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 0440 :: TAS SPP/DOD PREDOMINANT FUNDING MAR 2023 |
| Feb 28, 2023 | 1286 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY // TO INCORPRATE TWO NEW H-CLAUSES, RCN-91 AND FY 2023 PEMP. |
| Feb 28, 2023 | 1291 | $4.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $4,540,000.00 IN DOE FUNDS. |
| Feb 27, 2023 | 1289 | $342.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $33,946,548,149.24 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $8,036,950.95 CUMULATIVE NAF = $1,108,070,018.90. |
| Feb 27, 2023 | 1290 | $18.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 57 3400 :: TAS SPP/USAF PREDOMINANT FUNDING FEB 2023 |
| Jan 31, 2023 | 1287 | $264.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $281,759,871.26IN DOE FUNDS. CURRENT NAF = $16,900,723.39 CUMULATIVE NAF = $1,100,033,067.95 |
| Jan 31, 2023 | 1288 | $12.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $12,793,851.08 IN SPP/DOD JAN 2023. |
| Jan 13, 2023 | 1285 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY - TO INCORPORATE POLICY FLASH 2022-35 MODEL EMPLOYEE COMPENSATION: PAY AND BENEFITS CORPORATE H CLAUSE |
| Dec 27, 2022 | 1284 | $114.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $114,600,000.00 IN DOE FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $1,083,132,344.56 |
| Dec 23, 2022 | 1282 | $9.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 75 0600 :: TAS SPP/HHS DEC 2022 |
| Dec 23, 2022 | 1283 | $4.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $4,356,831.62 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = -$249,044.00 CUMULATIVE NAF = $1,083,132,344.56 |
| Dec 22, 2022 | 1280 | $-10.5K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $5,077,757.19 IN DEOBLIGATED COVID AND NON APPROPRIATED FUNDS. CURRENT NAF = $5,088,263.04 CUMULATIVE NAF = $ 1,083,381,388.56. |
| Dec 22, 2022 | 1281 | $2.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $2,596,840.78 IN DOE FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $ 1,083,381,388.56. |
| Nov 30, 2022 | 1279 | $9.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 70 0566 :: TAS SPP/DEPARTMENT OF HOMELAND SECURITY NOV 2022 |
| Nov 29, 2022 | 1278 | $40.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $44,315,957.10 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $4,127,413.50 CUMULATIVE NAF = $1,078,293,125.52. |
| Nov 8, 2022 | 1274 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY // TO INCORPORATE RCN NO. OR-90 |
| Oct 31, 2022 | 1276 | $1.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE $1,250,000.00 IN DOE FUNDS. |
| Oct 31, 2022 | 1277 | $1.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 57 3600 :: TAS SPP/AIR FORCE PREDOMINANT FUNDING OCT 2022 |
| Oct 28, 2022 | 1275 | $289.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $308,477,549.80 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $19,426,571.66 CUMULATIVE NAF = $1,074,165,712.02. |
| Sep 29, 2022 | 1272 | $330.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $330,604,590.67 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = -$200,411.47 CUMULATIVE NAF = $1,054,739,140.36. |
| Sep 29, 2022 | 1273 | $9.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 57 3600 :: TAS SPP/AIR FORCE PREDOMINANT FUNDING SEP 2022 |
| Sep 28, 2022 | 1270 | $108.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $117,223,426.00 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $8,468,804.02 CUMULATIVE NAF = $1,054,939,551.83. |
| Sep 28, 2022 | 1271 | $25.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 57 3600 :: TAS SPP/AIR FORCE PREDOMINANT FUNDING SEP 2022 |
| Aug 29, 2022 | 1268 | $140.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $149,339,462.13 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $8,488,882.93 CUMULATIVE NAF = $1,046,470,747.81. |
| Aug 29, 2022 | 1269 | $71.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 13 1460 :: TAS SPP/D/COMMERCE PREDOMINANT FUNDING AUG 2022 |
| Aug 18, 2022 | 1266 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY, CHANGING SECTION J, ATT. A AND B |
| Aug 18, 2022 | 1267 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY // TO INCORPORATE RCN NO. OR-89 |
| Jul 29, 2022 | 1265 | $37.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 80 0120 :: TAS SPP/NASA PREDOMINANT FUNDING JULY 2022 |
| Jul 28, 2022 | 1264 | $100.0K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $100,000.00 IN DOE FUNDS. |
| Jul 27, 2022 | 1263 | $159.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $173,337,254.07 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $14,258,433.92 CUMULATIVE NAF = $1,037,981,864.88. |
| Jul 19, 2022 | 1262 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 3040 :: TAS SPP/DOD PREDOMINANT FUNDING JUNE 2022 |
| Jun 30, 2022 | 1259 | $107.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $119,544,138.05 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $11,731,039.27 CUMULATIVE NAF = $1,023,723,430.96. |
| Jun 30, 2022 | 1260 | $7.5K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $7,500.00 IN DOE FUNDS. |
| Jun 30, 2022 | 1261 | $23.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 3040 :: TAS SPP/DOD PREDOMINANT FUNDING JUNE 2022 |
| May 31, 2022 | 1254 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| May 27, 2022 | 1257 | $399.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $410,521,737.65 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $10,957,415.48 CUMULATIVE NAF = $1,011,992,391.69. |
| May 27, 2022 | 1258 | $19.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 21 2040 :: TAS SPP/ARMY PREDOMINANT FUNDING MAY 2022 |
| Apr 28, 2022 | 1255 | $291.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $297,672,878.72 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $6,278,340.32 CUMULATIVE NAF = $1,001,034,976.21. |
| Apr 28, 2022 | 1256 | $14.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 36 0167 :: TAS SPP/VA PREDOMINANT FUNDING APR 2022 |
| Apr 11, 2022 | 1253 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Mar 30, 2022 | 1252 | $13.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 0134 :: TAS SPP/DOD PREDOMINANT FUNDING MAR 2022 |
| Mar 29, 2022 | 1251 | $-47.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Feb 24, 2022 | 1249 | $31.9M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Feb 24, 2022 | 1250 | $14.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Feb 7, 2022 | 1246 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Jan 27, 2022 | 1247 | $101.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $115,684,194.56 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $14,488,281.21 CUMULATIVE NAF = $866,750,976.26. |
| Jan 27, 2022 | 1248 | $14.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 573400 :: TAS SPP/AIR FORCE PREDOMINANT FUNDING JAN 2022 |
| Dec 22, 2021 | 1244 | $331.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $332,145,004.26 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $1,129,898.05 CUMULATIVE NAF = $852,262,695.05. |
| Dec 22, 2021 | 1245 | $1.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 974555 :: TAS SPP/DOD PREDOMINANT FUNDING DEC 2021 |
| Nov 30, 2021 | 1243 | $1.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $10,558,799.02 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $8,858,000.00 CUMULATIVE NAF = $851,132,797.00. |
| Nov 23, 2021 | 1241 | $71.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $71,749,394.79 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $574,205.02 CUMULATIVE NAF = $842,274,797.00. |
| Nov 23, 2021 | 1242 | $12.5M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 700566 :: TAS SPP/DHS PREDOMINANT FUNDING NOV 2021 |
| Oct 29, 2021 | 1240 | $-242.6K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 970400 :: TAS SPP/DOD PREDOMINANT FUNDING OCT 2021 |
| Oct 28, 2021 | 1239 | $185.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $186,499,168.72 IN DOE AND NON APPROPRIATED FUNDS. CURRENT NAF = $1,086,202.53 CUMULATIVE NAF = $841,700,591.98. |
| Oct 12, 2021 | 1238 | $0 | EO14042 MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY // INCORPORATE NEW CONTRACT CLAUSE IN SECTION I PER EXECUTE ORDER 14042 AND REPLACE RCN-85 WITH RCN-86. |
| Sep 30, 2021 | 1236 | $29.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 36 0167 :: TAS SPP/VA PREDOMINANT FUNDING SEP 2021 |
| Sep 30, 2021 | 1237 | $201.9K | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $201,920.00 IN DOE FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $840,614,389.45. |
| Sep 29, 2021 | 1235 | $36.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $38,467,209.24 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $1,665,326.76 CUMULATIVE NAF = $840,614,389.45. |
| Sep 20, 2021 | 1234 | $21.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $28,514,756.94 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $7,125,000.00 CUMULATIVE NAF = $838,949,062.69. |
| Sep 15, 2021 | 1233 | $10.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $10,058,072.50 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $831,824,062.69. |
| Aug 26, 2021 | 1231 | $111.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $123,565,583.91 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $12,393,037.85 CUMULATIVE NAF = $831,824,062.69 . |
| Aug 26, 2021 | 1232 | $17.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 57 3600 :: TAS SPP/AIR FORCE PREDOMINANT FUNDING AUGUST 2021 |
| Jul 30, 2021 | 1230 | $35.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 13 1460 :: TAS SPP/DOD PREDOMINANT FUNDING JULY 2021 |
| Jul 29, 2021 | 1229 | $92.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $95,389,626.69 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $2,809,740.36 CUMULATIVE NAF = $819,431,024.84. |
| Jul 28, 2021 | 1228 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Jun 30, 2021 | 1227 | $14.0M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 0400 :: TAS SPP/DOD PREDOMINANT FUNDING JUNE 2021 |
| Jun 29, 2021 | 1226 | $27.7M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $41,521,353.64 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $13,990,906.66 CUMULATIVE NAF = $816,621,284.48. |
| May 26, 2021 | 1224 | $14.8M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $15,375,281.87 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $544,977.74 CUMULATIVE NAF = $802,630,377.82. |
| May 26, 2021 | 1225 | $40.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 97 0400 :: TAS SPP/DOD PREDOMINANT FUNDING MAY 2021 |
| May 14, 2021 | 1223 | $76.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $91,337,720.12 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $14,999,000.00 CUMULATIVE NAF = $802,085,400.08. |
| May 7, 2021 | 1220 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Apr 30, 2021 | 1221 | $130.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $136,045,255.41 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $5,460,158.97 CUMULATIVE NAF = $787,086,400.08. |
| Apr 30, 2021 | 1222 | $27.1M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 80 0120 :: TAS SPP/NASA PREDOMINANT FUNDING APR 2021 |
| Apr 23, 2021 | 1212 | $0 | COVID 19 3610 MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Apr 19, 2021 | 1219 | $39.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $39,641,177.88 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $781,626,241.11. |
| Apr 12, 2021 | 1218 | $12.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $12,320,171.64 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $0.00 CUMULATIVE NAF = $781,626,241.11. |
| Mar 26, 2021 | 1216 | $16.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $17,123,066.64 IN DOE AND NON-APPROPRIATED FUNDS. CURRENT NAF = $872,597.30 CUMULATIVE NAF = $781,626,241.11. |
| Mar 26, 2021 | 1217 | $34.3M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY TAS :: 36 0167 :: TAS SPP/VA PREDOMINANT FUNDING MAR 2021 |
| Mar 22, 2021 | 1215 | $207.4M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $213,157,861.89 IN DOE FUNDS. CURRENT NAF = $5,719,000.00 CUMULATIVE NAF = $780,753,643.81. |
| Mar 16, 2021 | 1214 | $444.6M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $444,603,401.49 IN DOE FUNDS. CURRENT NAF = $0 CUMULATIVE NAF = $775,034,643.81. |
| Mar 8, 2021 | 1213 | $5.2M | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY OBLIGATE NET $5,166,703.00 IN DOE FUNDS. CURRENT NAF = $0 CUMULATIVE NAF = $775,034,643.81. |
| Feb 26, 2021 | 1209 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY |
| Feb 26, 2021 | 1211 | $0 | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY NET $0 END OF MONTH ACCOUNTING CHANGE |
Estimated positioning window
Mar 31, 2029 – Sep 30, 2029
25/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 25/100. Available recorded signals: 20 points.
- Contract end 2030-03-31 (1253 days from calculation)
- +5 points
- 0 historical awards in this buyer and category group
- +0 points
- 1370 recorded award transactions
- +10 points
- Latest award action: 2026-08-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Review the award scope and buyer evidence before making a bid/no-bid decision.