Federal contract award

DEAC0503OR22988

OVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeEM-ENVIRONMENTAL MGMT CON BUS CTR
NAICS221121 — Electric Bulk Power Transmission and Control
PSCS112 — Electric Services
Parent award / vehicleNot reported
Set-asideNot reported
Pricing typeCOST NO FEE
Obligations$203.9M
Current contract value$222.8M
Potential contract value / ceiling$222.8M
Start dateApr 15, 2003
Current end dateDec 31, 2029
Potential end dateDec 31, 2029
Latest award activityAug 17, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 219 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 8, 2026219$400.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Aug 17, 2026218$1.9MOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
May 18, 2026217$2.0MOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Mar 20, 2026216$900.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Feb 23, 2026215$900.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Jan 21, 2026214$865.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Dec 16, 2025213$425.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Nov 5, 2025212$285.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Sep 25, 2025211$0OVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Sep 18, 2025210$0OVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Aug 21, 2025209$1.5MOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Jul 8, 2025208$530.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
May 15, 2025207$670.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Mar 24, 2025206$653.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Jan 13, 2025205$640.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Nov 18, 2024204$470.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Sep 24, 2024203$180.0KOVEC: THIS IS A FIXED UNIT RATE CONTRACT TO PROVIDE ELECTRIC UTILITY SERVICE FOR THE PORTSMOUTH GASEOUS DIFFUSION PLANT IN PIKE COUNTY, OHIO. THIS MODIFICATION PROVIDES INCREMENTAL FUNDING.
Aug 20, 2024202$750.0KDOE PORTSMOUTH/PADUCAH PROJECT OFFICE (PPPO) FIXED UNIT RATE CONTRACT FOR THE SUPPLY OF ELECTRICITY. THIS MODIFICATION ADDS INCREMENTAL FUNDING.
May 15, 2024201$590.0KDOE PORTSMOUTH/PADUCAH PROJECT OFFICE (PPPO) FIXED UNIT RATE CONTRACT FOR THE SUPPLY OF ELECTRICITY. THIS MODIFICATION ADDS INCREMENTAL FUNDING.
Feb 29, 2024200$810.0KDOE PORTSMOUTH/PADUCAH PROJECT OFFICE (PPPO) FIXED UNIT RATE CONTRACT FOR THE SUPPLY OF ELECTRICITY. THIS MODIFICATION ADDS INCREMENTAL FUNDING.
Sep 30, 2023199$25.0KDOE PORTSMOUTH/PADUCAH PROJECT OFFICE (PPPO) FIXED UNIT RATE CONTRACT FOR THE SUPPLY OF ELECTRICITY. THIS MODIFICATION ADDS INCREMENTAL FUNDING.
Sep 26, 2023198$30.0KDOE PORTSMOUTH/PADUCAH PROJECT OFFICE (PPPO) FIXED UNIT RATE CONTRACT FOR THE SUPPLY OF ELECTRICITY. THIS MODIFICATION ADDS INCREMENTAL FUNDING.
Apr 27, 2023197$2.0MEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 10, 2023196$2.5MEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Oct 31, 2022195$1.2MEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 21, 2022194$285.0KEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jul 12, 2022193$2.0MEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 10, 2022192$1.1MEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 15, 2022191$1.1MEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 26, 2022190$711.0KEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Dec 15, 2021189$925.0KEO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Nov 23, 2021188$0EO14042 ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Oct 20, 2021187$590.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 21, 2021186$210.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jul 21, 2021185$1.1MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 19, 2021184$775.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 28, 2021183$711.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Dec 2, 2020182$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 29, 2020181$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 15, 2020180$865.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jul 21, 2020179$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jun 3, 2020178$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Apr 7, 2020177$851.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 11, 2020176$335.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 30, 2019175$366.6KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Aug 26, 2019174$100.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jul 12, 2019173$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 21, 2019172$1.3MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Apr 19, 2019171$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Feb 7, 2019170$2.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 2, 2019169$800.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 26, 2018168$2.1MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 6, 2018167$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Aug 20, 2018166$1.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Aug 2, 2018165$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 22, 2018164$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Feb 23, 2018163$2.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 31, 2018162$1.7MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Dec 6, 2017161$600.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 25, 2017160$375.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 19, 2017159$1.1MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jun 22, 2017158$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Apr 12, 2017157$1.5MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 19, 2017156$3.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 20, 2016155$-2.8MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jun 13, 2016154$3.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 4, 2016153$2.5MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Feb 19, 2016152$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 29, 2015151$5.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jul 1, 2015150$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 26, 2015149$3.3MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 9, 2015148$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Feb 12, 2015147$1.7MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 30, 2014146$0ELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jun 10, 2014145$900.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 15, 2014144$1.8MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 13, 2014142$4.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 4, 2014141$300.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 31, 2014140$200.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 17, 2014139$1.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Dec 3, 2013138$100.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Nov 21, 2013137$100.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 26, 2013136$100.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Aug 23, 2013135$3.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Aug 6, 2013134$200.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jul 1, 2013133$514.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 13, 2013132$100.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 28, 2013131$100.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Feb 22, 2013130$6.9MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 15, 2013129$100.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Dec 5, 2012128$235.9KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 28, 2012127$200.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Sep 24, 2012126$2.7MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jun 28, 2012125$550.0KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 24, 2012124$2.0MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
May 7, 2012123$112.3KELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Mar 27, 2012122$2.3MELECTRIC POWER SERVICE TO THE DEPARTMENT OF ENERGY PORTSMOUTH, OHIO SITE.
Jan 25, 2012121$2.1MELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Dec 21, 2011120$305.4KELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Nov 2, 2011119$50.0KELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Sep 30, 2011118$310.1KELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Aug 24, 2011117$3.5MELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING.
Jul 28, 2011116$1.5MELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THE MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Jun 30, 2011115$24.0KELECTRIC POWER SERVICE TO THE PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Jun 21, 2011114$200.0KELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Jun 6, 2011113$0ELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS FOR AN ADMINISTRATIVE CHANGE.
May 31, 2011112$400.0KELECTRONIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
May 2, 2011111$100.0KELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING.
Apr 6, 2011110$200.0KELECTRIC POWER SERVICE TO THE PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING.
Mar 30, 2011109$500.0KELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING.
Mar 15, 2011108$1.0MELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING.
Mar 2, 2011107$200.0KELECTRIC POWER SERVICE TO PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING.
Feb 2, 2011106$512.9KELECTRICAL POWER FOR PORTSMOUTH, OHIO SITE. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS.
Jan 18, 2011105$1.8MTO FURNISH POWER TO THE PORTSMOUTH/PIKETON PLANT (PPPO)
Dec 21, 2010104$1.0MPOWER FOR PORTSMOUTH.
Oct 15, 2010103$0TO FURNISH POWER TO PIKETON PLANT.
Sep 30, 2010102$400.0KTO FURNISH POWER TO PIKETON PLANT.
Sep 27, 2010101$1.7MTO PURCHASE POWER FOR THE PIKETON PLANT.
Aug 31, 2010100$500.0KTO PURCHASE POWER AT PORTSMOUTH, OHIO.
Jul 29, 201099$500.0KTO PURCHASE POWER AT PORTSMOUTH, OHIO.
Jun 18, 201098$2.2MPURCHASE OF POWER FOR PORTSMOUTH, OHIO
Jun 7, 201097$400.0KOBLIGATE FUNDS FOR POWER AT PORTSMOUTH, OHIO
May 3, 201096$1.4MOBLIGATE FUNDS FOR POWER AT PORTSMOUTH, OHIO.
Mar 31, 201095$700.0KOBLIGATE FUNDS FOR POWER AT PORTSMOUTH.
Feb 25, 201094$1.3MOBLIGATE FUNDS FOR POWER AT PORTSMOUTH.
Nov 12, 200993$3.0MOBLIGATE FUNDS FOR POWER AT PORTSMOUTH SITE
Sep 30, 200992$1.6MOBLIGATE FUNDS FOR POWER AT PORTSMOUTH SITE
Aug 18, 2009A091$1.4MOBLIGATE FUNDS FOR POWER AT PORTSMOUTH SITE
Jun 17, 2009A090$1.2MOBLIGATE FUNDS FOR POWER AT PORTSMOUTH SITE
May 18, 2009A089$500.0KOBLIGATE FUNDS FOR POWER AT PORTSMOUTH SITE
Mar 30, 2009A088$900.0K
Mar 2, 2009A087$1.2M
Feb 9, 2009A086$600.0K
Jan 20, 2009A085$2.0M
Nov 3, 2008A084$500.0K
Sep 30, 2008A083$700.0K
Aug 28, 2008A082$2.0M
Jul 29, 2008A081$4.0M
Jul 3, 2008A080$1.3M
Apr 24, 2008A079$4.0M
Jan 25, 2008A078$5.8M
Jan 8, 2008A077$500.0K
Sep 28, 2007A076$2.1M
Aug 2, 2007A075$850.0K
Jun 20, 2007A074$281.3K
Jun 15, 2007A073$233.4K
Jun 4, 2007A072$3.0M
May 25, 2007A071$300.0K
May 3, 2007A070$300.0K
Apr 24, 2007A069$100.0K
Apr 9, 2007A067$200.0K
Apr 9, 2007A068$400.0K
Mar 16, 2007A066$310.6K
Feb 28, 2007A065$2.9M
Feb 26, 2007A064$300.0K
Feb 12, 2007A063$300.0K
Jan 22, 2007A062$2.2M
Jan 16, 2007A061$300.0K
Jan 4, 2007A060$300.0K
Dec 6, 2006A059$200.0K
Nov 22, 2006A058$200.0K
Nov 9, 2006A057$500.0K
Oct 23, 2006A056$200.0K
Sep 21, 2006A055$200.0K
Sep 11, 2006A054$200.0K
Aug 24, 2006A053$200.0K
Aug 9, 2006A029$200.0K
Aug 1, 2006A051$200.0K
Aug 1, 2006A052$300.0K
Jul 14, 2006A050$300.0K
Jun 22, 2006A049$200.0K
Jun 9, 2006A048$200.0K
May 30, 2006A047$4.8M
May 8, 2006A046$200.0K
Apr 25, 2006A045$200.0K
Apr 5, 2006A044$100.0K
Mar 7, 2006A042$255.4K
Mar 7, 2006A043$300.0K
Feb 21, 2006A041$400.0K
Feb 6, 2006A040$500.0K
Jan 31, 2006A038$1.3M
Jan 31, 2006A039$4.0M
Jan 30, 2006A037$90.0K
Dec 20, 2005A036$300.0K
Dec 14, 2005A035$300.0K
Dec 13, 2005A034$200.0K
Dec 8, 2005A033$85.0K
Nov 30, 2005A032$300.0K
Nov 9, 2005A030$250.0K
Nov 9, 2005A031$200.0K
Sep 26, 2005A028$200.0K
Sep 9, 2005A027$400.0K
Aug 30, 2005A026$300.0K
Aug 18, 2005A025$700.0K
Aug 11, 2005A024$185.0K
Jul 14, 2005A023$200.0K
Jul 10, 2005A022$4.7M
Jun 3, 2005A021$200.0K
May 2, 2005A020$400.0K
Apr 12, 2005A019$600.0K

Estimated positioning window

Dec 31, 2028 – Jun 30, 2029

Recompete signal:
25/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 25/100. Available recorded signals: 20 points.

Contract end 2029-12-31 (1156 days from calculation)
+5 points
1 historical awards in this buyer and category group
+0 points
219 recorded award transactions
+10 points
Latest award action: 2026-08-17
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.