Federal contract award
DEAC0902SR22210
SALT WASTE PROCESSING FACILITY CONCEPTUAL DESIGN
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | SAVANNAH RIVER OPERATIONS OFFICE |
| NAICS | 236210 — Industrial Building Construction |
| PSC | Y199 — Construction of Miscellaneous Buildings |
| Parent award / vehicle | Not reported |
| Set-aside | Not reported |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $2.2B |
| Current contract value | $2.3B |
| Potential contract value / ceiling | $2.3B |
| Start date | Sep 15, 2002 |
| Current end date | Apr 30, 2022 |
| Potential end date | Apr 30, 2022 |
| Latest award activity | Nov 24, 2020 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 200 of 252 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 29, 2024 | 261 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE SETTLEMENT AGREEMENT INTO THE CONTRACT. |
| Aug 28, 2024 | 260 | $10.4M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT. |
| Feb 27, 2024 | 259 | $4.0M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT AND TO CHANGE THE INVOICE APPROVING OFFICIAL. |
| Feb 17, 2022 | 258 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CLIN 7 - ONE-YEAR OF OPERATIONS-OCCURRED, ONE-YEAR OF OPERATIONS-ESTIMATE TO COMPLETE, AND HOT COMMISSIONING |
| Jan 3, 2022 | 257 | $18.1M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $18,095,000.00 TO CONTRACT LINE ITEM 0008 TRANSITION. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. |
| Dec 20, 2021 | 256 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO MAKE THE FOLLOWING CHANGES: 1. MODIFICATION 0256 IS ISSUED AS A DEFINITIZED MODIFICATION TO MODIFICATION 247 (CLIN 8 ONLY) TO CONTRACT NO. DE-AC09-02SR22210. 2. THIS DEFINITIZED MODIFICATION WILL ADD COSTS TO |
| Dec 7, 2021 | 254 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE DE-AC09-02SR22210, TO INCORPORATE THE CHANGES TO THE CAGE CODE AND VENDOR ADDRESS PER PARSONS LETTER REFERENCE NUMBER: 00-700-29315, ADDRESS CHANGE TO CAGE CODE 1BVK6, PARSONS GOVERNMENT SERVICES INC., DA |
| Nov 10, 2021 | 255 | $13.6M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $13,572,823.00 TO CONTRACT LINE ITEMS (CLINS) 0007 - OPERATIONS AND 0008 - TRANSITION. |
| Oct 14, 2021 | 253 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE DE-AC09-02SR22210, TO INCORPORATE THE FAR DEVIATION TEXT IN SECTION I OF THE CONTRACT AS INCLUDED IN THE ATTACHED CIVILIAN AGENCY ACQUISITION COUNCIL (CAAC) LETTER 2021-03, DATED SEPTEMBER 30, 2021. |
| Sep 29, 2021 | 252 | $0 | THE PURPOSE OF THIS UNDEFINITIZED MODIFICATION IS TO MAKE CHANGES BASED ON THE AGREEMENT IN PRINCIPLE (AIP) THAT WAS DUALLY SIGNED ON MAY 6, 2021 AND TO TRANSFER $400,000 FROM CLIN 7 AND MOVE TO CLIN 8 (ALL FUNDING FOR BOTH CLINS 7 & 8 WERE OBLIG |
| Sep 28, 2021 | 251 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J ATTACHMENT M THE ADVANCE AGREEMENT RELATED TO IMPACTS RESULTING FROM THE PARTIAL STOP WORK ORDER |
| Sep 1, 2021 | 249 | $10.0M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $10,000,000.00 TO CONTRACT LINE ITEM (CLIN) 0007. |
| Sep 1, 2021 | 250 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE TYPOGRAPHICAL ERROR IN THE OBLIGATED FUNDING AMOUNT IN MODIFICATION 249 FROM OF $23,833,427.00 TO $10,000,000.00 TO CONTRACT LINE ITEM (CLIN) 0007. |
| Aug 19, 2021 | 248 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CHANGE: A. CONTRACTING OFFICER FROM JORDAN RHOADES TO SUZANNE HUNT B. CONTRACTING SPECIALIST FROM SYLVIA MARONEY TO SUZANNE HUNT C. INVOICE APPROVING OFFICIAL FROM JORDAN RHOADES TO SUZANNE |
| Aug 5, 2021 | 247 | $0 | SEE PAGE 2 FOR A DESCRIPTION OF THE MODIFICATION. |
| Jul 26, 2021 | 246 | $0 | SEE PAGE 2 FOR A DESCRIPTION OF THE MODIFICATION. |
| Jun 24, 2021 | 245 | $23.8M | HE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $23,833,427.00 TO CONTRACT LINE ITEM (CLIN) 0007. |
| Apr 15, 2021 | 244 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: A. REVISE THE OVERTIME PREMIUM AMOUNT AUTHORIZED BY CLAUSE I.31, FAR 52.222-22 PAYMENT OF OVERTIME PREMIUMS (JUL 1990), PARAGRAPH (A). THE AUTHORIZED OVERTIME PREMIUM AMOUNT IS INCREASED BY $1,000,000.00 FRO |
| Mar 22, 2021 | 241 | $21.8M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $21,825,096.00 TO CONTRACT LINE ITEM (CLIN) 0007. |
| Mar 18, 2021 | 242 | $0 | HE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST OF LAWS, REGULATIONS, AND DOE DIRECTIVES APPLICABLE TO THIS CONTRACT UNDER SECTION J DOE ORDER 142.3B. |
| Mar 18, 2021 | 243 | $0 | 1. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Feb 11, 2021 | 240 | $0 | TO INCORPORATE UPDATED SECTION J, LIST OF ATTACHMENTS M, ADVANCE AGREEMENT RELATED TO IMPACTS RESULTING FROM PARTIAL STOP WORK ORDER (NONPORTABLE WORK ONLY) ASSOCIATED WITH THE CORONAVIRUS EPIDEMIC IMPACTS AT SAVANNAH RIVER SITE SALT WASTE PROCESSING |
| Feb 10, 2021 | 239 | $24.5M | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN INTERNAL ERROR IN RELATION TO MODIFICATION 84 BETWEEN THE STARS AND STRIPES SYSTEMS. |
| Jan 26, 2021 | 236 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE ADDITION OF DOE O 420.1C, CHANGE 3 AND DOE STANDARD 1066-2016 UNDER CONTRACT NUMBER DE-AC09-02SR22210. |
| Jan 26, 2021 | 238 | $11.7M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $11,658,195.00 TO CONTRACT LINE ITEM (CLIN) 0007. |
| Jan 20, 2021 | 237 | $0 | A. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE KEY PERSONNEL LIST LOCATED IN PART III LIST OF DOCUMENTS, EXHIBITS, ATTACHMENTS SECTION J ATTACHMENT F. B. MR. TONY MAXTED SHALL PROVIDE PROJECT SUPPORT ASSISTANCE TO THE PROJECT MANAGER THROUGH H |
| Dec 30, 2020 | 235 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGE BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED |
| Dec 23, 2020 | 234 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGE BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED |
| Dec 16, 2020 | 232 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST OF LAWS, REGULATIONS, AND DOE DIRECTIVES APPLICABLE TO THIS CONTRACT UNDER SECTION J DOE ORDER 470.3C CHG 1. |
| Dec 14, 2020 | 233 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGE BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Nov 30, 2020 | 230 | $0 | A. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE KEY PERSONNEL LIST LOCATED IN PART III LIST OF DOCUMENTS, EXHIBITS, ATTACHMENTS SECTION J ATTACHMENT F. B. PART III SECTION J ATTACHMENT F IS DELETED IN ITS ENTIRETY AND REPLACED HERETO. C. ALL O |
| Nov 24, 2020 | 228 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE SWPF GLYCOLIC ACID SAFETY BASIS PROPOSAL V-PMP-J-0069 REV 0 IN SUPPORT OF CHANGES IN THE SAFETY BASIS (SB) ANALYSIS TO SUPPORT AN ALTERNATE REDUCTANT (GLYCOLIC ACID) TO INCLUDE CHANGES IN RESIDUAL |
| Nov 24, 2020 | 231 | $19.2M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $19,236,750.00 TO CONTRACT LINE ITEM (CLIN) 0007. |
| Nov 12, 2020 | 229 | $0 | A. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST OF LAWS, REGULATIONS, AND DOE DIRECTIVES APPLICABLE TO THIS CONTRACT UNDER SECTION J. DOE ORDER 486.1A FOREIGN GOVERNMENT SPONSORED OR AFFILIATED ACTIVITIES DATED 09/04/2020 IS HEREBY ADDED UN |
| Oct 16, 2020 | 227 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REPLACE SECTION H IN ITS ENTIRETY DUE TO THE UPDATE OF CONTRACT CLAUSE H.48. |
| Oct 7, 2020 | 224 | $0 | UPDATE DOE O 140.1A INTERFACE WITH THE DEFENSE NUCLEAR FACILITIES SAFETY BOARD TO SECTION J ATTACHMENT K LIST B/APPLICABLE DOE DIRECTIVES AND ORDERS. LIST B IS DELETED IN ITS ENTIRETY AND IS REPLACED BY SECTION J APPENDIX K ATTACHED. |
| Oct 6, 2020 | 221 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO MAKE AN ADMINISTRATIVE CHANGE TO SECTION C AND REPLACE IT IN ITS ENTIRETY. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Oct 1, 2020 | 226 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR ON MODIFICATION 0225. |
| Sep 29, 2020 | 225 | $12.3M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $12,290,462.02 TO CONTRACT LINE ITEM (CLIN) 0007. |
| Sep 16, 2020 | 223 | $15.0M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $15,000,000.00 TO CONTRACT LINE ITEM (CLIN) 0007. THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 119 - $3,10 |
| Sep 11, 2020 | 222 | $-12.1M | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $12,100,000.00 FROM CONTRACT LINE ITEM (CLIN) 0007 AND BE REPROGRAMED AND FURTHER OBLIGATED FOR WORK TO BE PERFORMED ON CLIN 0007. THE FUNDING SHOULD BE ALLOCATED AS FOLL |
| Aug 26, 2020 | 220 | $4.6M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $4,600,000.00 TO CLIN 0006. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Aug 17, 2020 | 218 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: A) CREATE SUB-CLIN 0006AH PROJECT CLOSEOUT IN ORDER TO SEGREGATE ALL PROJECT CLOSEOUT COSTS. VALUE IN THE AMOUNT OF $300,000.00 FROM SUB-CLIN 0006AA COMMISSIONING TARGET COST WILL BE REMOVED AND PLACED ONTO |
| Aug 12, 2020 | 219 | $14.9M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $11,100,000.00 TO CLIN 0007. |
| Aug 6, 2020 | 216 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE CONTRACTUAL PERIOD OF PERFORMANCE DATE IN SECTION F. |
| Aug 3, 2020 | 217 | $3.5M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $3,500,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 1 |
| Jul 31, 2020 | 215 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION B IN ITS ENTIRETY. SECTION B HAS BEEN UPDATED TO IMPLEMENT 10 CFR 851, WORKERS SAFETY AND HEALTH PROGRAM (2018). 2. REPLACE SECTION C IN ITS ENTI |
| Jun 23, 2020 | 214 | $0 | THE PURPOSE OF THIS MODIFCATION IS TO DOCUMENT THE PARTIAL STOP WORK ORDER |
| Jun 15, 2020 | 213 | $0 | ADD DOE O 227.1A CHG 1 INDEPENDENT OVERSIGHT PROGRAM TO THE CONTRACT |
| Jun 4, 2020 | 212 | $6.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OTHER PROJECT COSTS FUNDING IN THE AMOUNT OF $6,000,000.00 TO CONTRACT LINE ITEM NUMBER 0006AE. THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CONTRACT LINE ITEM NUMBERS: CONTRACT LINE ITEM NUMBER 0005 AB: TEC FUNDING MODIFICATION 117 - $80,000,000.00 - FISCAL YEAR 13 MODIFICATION |
| Jun 2, 2020 | 211 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: (1) THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ERROR IN CLIN 0007 ACCOUNTING CODES OBLIGATED TO THE CONTRACT BY A: DEOBLIGATE $1,000,000.00 THAT WAS PLACED |
| Apr 28, 2020 | 210 | $0 | COVID-19 3610 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY. SECTION H HAS BEEN UPDATED TO REFLECT THE FOLLOWING CHANGE: A. ADD H.48 CARES ACT 2. THE TOTAL COST OF THE |
| Apr 27, 2020 | 206 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION J IN ITS ENTIRETY. SECTION J HAS BEEN UPDATED TO REFLECT THE FOLLOWING CHANGES: A. ADD ADVANCE AGREEMENT (PARTIAL STOP WORK ORDER-COVID-19) AS AT |
| Apr 27, 2020 | 208 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION J IN ITS ENTIRETY. SECTION J HAS BEEN UPDATED TO REFLECT THE FOLLOWING CHANGE: A. REPLACE ATTACHMENT L (DIRECTED CHANGES TO THE STATEMENT OF WORK |
| Apr 27, 2020 | 209 | $15.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $15,000,000.00 TO CLIN 0001 THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 1 |
| Apr 17, 2020 | 207 | $1.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD OPERATIONALL FUNDING IN THE AMOUNT OF $1,000,000.00 TO CLIN 0007 THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 119 - |
| Apr 7, 2020 | 205 | $10.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $10,000,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD |
| Mar 3, 2020 | 204 | $12.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $12,000,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD |
| Feb 13, 2020 | 203 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REMOVE DOE O 450.1, CHG 2 ENVIRONMENTAL PROTECTION PROGRAM DATED 01/15/2003 2. ADD DOE ORDER 436.1 DEPARTMENTAL SUSTAINABILITY DATED 05/02/2011 TO BE EFFECTIVE 1 |
| Feb 4, 2020 | 202 | $12.1M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $12,051,165 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 11 |
| Jan 14, 2020 | 201 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. MODIFY SECTION C, STANDARD 5, TABLE C.5-5.1 (HOT COMMISSIONING PERFORMANCE TESTING) AND REMOVE THE REQUIREMENT FOR THE ALPHA FINISHING PROCESS (AFP) FROM THE PROCES |
| Dec 10, 2019 | 200 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. CHANGE DOE ORDER 151.1D COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM FROM 151.1D DATED 06/28-2019 TO 151.1D MINCHG DATED 10/14/2019 (OFFICIAL USE ONLY) DATED 11/23/20 |
| Nov 27, 2019 | 199 | $17.5M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $17,500,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD |
| Nov 19, 2019 | 198 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: (A) CORRECT A TYPOGRAPHICAL ERROR ON MODIFICATION 0190 FUNDING ONLY. (B) THIS ERROR FLOWED INTO SUBSEQUENT FUNDING MODIFICATIONS 0193 AND 0194 FROM MODIFICATION 0190. (C) THIS TYPOGRAPHICAL ERROR DID N |
| Sep 23, 2019 | 197 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. CHANGE DOE ORDER 151.1 COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM, FROM 151.1C DATED 11/02/2005 TO 151.1D DATED 06/28/2019. |
| Sep 12, 2019 | 196 | $0 | SEE PAGE 2 FOR DESCRIPTION OF MODIFICATION |
| Aug 15, 2019 | 195 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. CHANGE DOE ORDER 142.3 UNCLASSIFIED FOREIGN VISITORS PROGRAM FROM 142.3 CHG 1 DATED 02/28/2008 TO 142.3A CHG 1 DATED 01/18/2019. |
| Aug 6, 2019 | 194 | $42.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $42,000,000.00 TO CLIN 0006AE THIS FUNDING MODIFICATION HEREBY PROVIDES AN ADDITIONAL $15,000,000.00 FOR USE IN FY19. THE BALANCE OF THE FUNDING ($27,000,000.00) |
| Aug 1, 2019 | 193 | $677.6K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPERATIONAL PROGRAM COST FUNDING IN THE AMOUNT OF $677,635.00 TO CONTRACT LINE ITEM 0006. |
| Jul 31, 2019 | 192 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE LIST B WITH DOE ORDERS 205.1C AND 442.1B, AND TO UPDATE STANDARD 8 (SAFEGUARDS AND SECURITY). |
| Jun 25, 2019 | 191 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO AUTHORIZE PARSONS GOVERNMENT SERVICES TO UTILIZE THE NNSA / EM SUPPLY CHAIN MANAGEMENT CENTER (SCMC)IN SUPPORT OF THE DEPARTMENT OF ENERGY SAVANNAH RIVER SITE (DOE-SR) SALT WASTE PROCESSING FACILITY (SWPF). |
| May 6, 2019 | 190 | $27.3M | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OTHER PROJECT COST FUNDING IN THE AMOUNT OF $27,322,365.00 TO CLIN 0006 AE. |
| Mar 18, 2019 | 189 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OTHER PROJECT COSTS FUNDING IN THE AMOUNT OF $23,500,000.00 TO CONTRACT LINE ITEM 0006 AE. |
| Mar 1, 2019 | 188 | $23.5M | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $23,500,000.00 TO CLIN 0006 AE. |
| Dec 10, 2018 | 187 | $23.5M | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $23,500,000.00 TO CLIN 0006 AE. ALSO TO ADD SUBCLIN 0006AE TO TRACK THE INCREASE IN THE TOTAL CONTRACT COST RELATED TO THE OVER TARGET BASELINE FOR WESTLOCK VALVE/ PERFORMANCE ISSUES FUNDING ONLY. |
| Sep 26, 2018 | 185 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO TAKE OFF SUBTOTALS OF FUNDING AT THE CLIN LINES. |
| Aug 29, 2018 | 184 | $5.9M | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DOE ORDER 460.1 AND ADD 140.1 TO SECTION J - LIST OF ATTACHMENTS, ATTACHMENT K, LIST OF APPLICABLE DIRECTIVES (LIST B). |
| Aug 1, 2018 | 183 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DOE ORDER 460.1 AND ADD 140.1 TO SECTION J - LIST OF ATTACHMENTS, ATTACHMENT K, LIST OF APPLICABLE DIRECTIVES (LIST B). |
| Jun 12, 2018 | 182 | $28.4M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $28,359,000.00 TO CLIN 0006. |
| Mar 22, 2018 | 181 | $13.7M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $13,689,002.00 TO CLIN 0006. |
| Mar 1, 2018 | 179 | $6.4M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $6,368,059.00 TO CLIN 0006. |
| Feb 28, 2018 | 180 | $0 | SEE PAGE 2 FOR DETAILS |
| Feb 6, 2018 | 178 | $0 | SEE PAGE 2 OF THE MODIFICATION FOR DESCRIPTION OF MODIFICATION. |
| Jan 10, 2018 | 177 | $13.4M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $13,375,247.00 TO CLIN 0006. |
| Dec 18, 2017 | 176 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REPLACE MR. BRAD SWANSON FROM THE POSITION OF PLANT MANAGER IN SECTION J, ATTACHMENT F, KEY PERSONNEL AND REPLACES HIM WITH MICHAEL PITTMAN. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. |
| Oct 18, 2017 | 175 | $22.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $21,962,831.00 TO CLIN 0006 |
| Oct 12, 2017 | 174 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE SCOPE OF WORK FOR NEXT GENERATION SOLVENT (NGS) COLD CHEMICAL FEED FACILITY (CCFF) ON CONTRACT NO. DE-AC09-02SR22210. |
| Sep 7, 2017 | 172 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE MODIFICATION 0169 IN ACCORDANCE , DOE ORDER 232.2A,"OCCURRENCE REPORTING AND PROCESSING OF OPERATIONS INFORMATION" |
| Aug 25, 2017 | 173 | $23.5M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $23,450,919.00 TO CLIN 0006 |
| Aug 4, 2017 | 171 | $9.6M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $9,617,400.00 TO CLIN 0006 |
| Jul 7, 2017 | 170 | $9.6M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $9,617,400.00 TO CLIN 0006 |
| Jun 20, 2017 | 169 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A UNDEFINITIZED MODIFICATION TO THE CONTRACTOR TO IMPLEMENT DOE ORDER 232.2A |
| Jun 13, 2017 | 168 | $10.6M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $10,575,575.00 TO CLIN 0006 |
| Mar 20, 2017 | 167 | $0 | SEE PAGE 2 FOR THE DESCRIPTION OF THE MODIFICATION. |
| Feb 9, 2017 | 162 | $0 | SEE PAGE 2 FOR THE DESCRIPTION OF THE MODIFICATION. |
| Feb 7, 2017 | 166 | $22.2M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $22,056,811 TO CLIN 0006 AND $100,000.00 TO CLIN 0006 AC |
| Jan 17, 2017 | 165 | $19.1M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $19,143,539.00 TO CLIN 0006 |
| Jan 9, 2017 | 164 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REPLACE THE WBS (ATTACHMENT 2) FOR NEXT GENERATION SOLVENT ADDED DURING MODIFICATION 156 WITH THE UPDATED WBS ATTACHED. NO ADDITIONAL COSTS ARE ASSOCIATED WITH THIS MODIFICATION |
| Nov 25, 2016 | 163 | $12.9M | THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL OTHER PROCUREMENT COST FUNDING IN THE AMOUNT OF $12,895,922.00 TO CONTRACT LINE ITEM 0006 B) CORRECT THE TOTAL OBLIGATED AMOUNT TO INCLUDE THE FUNDING ADDED ABOVE AND THE $1,112,285.40 IN FUNDING THAT WAS ADDED THROUGH MODIFICATION 156. C) REMOVE THE PERIOD OF PERFORMANCE |
| Oct 25, 2016 | 161 | $9.5M | THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF 9,542,434.00 TO CLIN 0006 B) MOVE OPC FUNDING IN THE AMOUNT OF $1,000,000.00 FROM CLIN 0005AC TO CLIN 0006 |
| Oct 18, 2016 | 130 | $0 | THIS MODIFICATION IS TO INCORPORATE THE BUSINESS SYSTEM REQUIREMENTS OF ACQUISITION LETTER AL2013-11 INTO THE SALT WASTE PROCESSING FACILITY CONTRACT. |
| Sep 30, 2016 | 159 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO SET FORTH REQUIREMENTS AND RESPONSIBILITIES FOR A DEPARTMENTAL CYBER SECURITY PROGRAM, DOE O 205.1B CHG 2, WHICH PROTECTS INFORMATION AND INFORMATION SYSTEMS. |
| Sep 29, 2016 | 160 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REPLACE MR. DAVE TUTTLE FROM THE POSITION OF QUALITY ASSURANCE MANAGER IN SECTION J, ATTACHMENT F, KEY PERSONNEL AND REPLACES HIM WITH DR. THOMAS HELMS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. |
| Sep 28, 2016 | 156 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO NEGOTIATE WITH PARSONS TO CREATE A CONCEPTUAL DESIGN PACKAGE FOR IMPLEMENTATION OF NEXT ON CONTRACT NO. DE-AC09-02SR22210. |
| Aug 31, 2016 | 158 | $10.0M | THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. ADD $4,800,000.00 OF FY 08 TEC COMMISSIONING FUNDING TO CLIN 05AB. 2. ADD $5,200,000.00 OF FY 16 TEC COMMISSIONING FUNDING TO CLIN 05AB. |
| Aug 23, 2016 | 157 | $5.0M | THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. ADD $5,005,142.60 OF FY 16 OPC COMMISSIONING FUNDING TO CLIN 0006. |
| Jun 15, 2016 | 155 | $55.3M | THE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. ADD $2.5M FY 15 TEC FROM MISC. OBLIGATION TO CLIN 0005 AB 2. ADD $17.5M FY 16 TEC TO CLIN 0005 AB (TOTAL OF $20M TO CLIN 0005 AB) 3. ADD $12,031,294.00 FY 16 TEC TO CLIN 0005 AD 4. ADD $3,285,413.00 FY 16 TEC TO CLIN 0005 AE 5. ADD $20M FY 16 OPC COMMISSIONING TO CLIN 0006. |
| Jun 1, 2016 | 151 | $0 | SEE PAGE 2 FOR A DESCRIPTION OF THE MODIFICATION. |
| Apr 25, 2016 | 154 | $15.0M | THE PURPOSE OF THIS MODIFICATION IS TO REMOVE THE INCLUSION OF THE ALPHA FINISHING PROCESS AS PART OF THE DESIGN CAPACITY PERFORMANCE TEST FROM SECTION C STANDARD 5 COMMISSIONING AND ONE YEAR OF OPERATIONS (F)(1). IN CONSIDERATION TO THE REMOVAL OF THIS REQUIREMENT, PARSONS REMOVED THIS WORK FROM THEIR BASELINE IN THE AMOUNT OF $6,956,129.00. THE UPDATED PAGES C-30 AND C-31 ARE ATTACHED AND REFLECT THE CHANGE. |
| Mar 28, 2016 | 145 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REMOVE THE INCLUSION OF THE ALPHA FINISHING PROCESS AS PART OF THE DESIGN CAPACITY PERFORMANCE TEST FROM SECTION C STANDARD 5 COMMISSIONING AND ONE YEAR OF OPERATIONS (F)(1). IN CONSIDERATION TO THE REMOVAL OF THIS REQUIREMENT, PARSONS REMOVED THIS WORK FROM THEIR BASELINE IN THE AMOUNT OF $6,956,129.00. THE UPDATED PAGES C-30 AND C-31 ARE ATTACHED AND REFLECT THE CHANGE. |
| Mar 28, 2016 | 153 | $14.9M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $10,907,600.00 TO CLIN 0005 AB AND ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $4,000,000.00 TO CLIN 0006. |
| Feb 29, 2016 | 152 | $18.9M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $11,014,800 TO CLIN 0005 AB AND ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $7,882,572.00 TO CLIN 0006. |
| Feb 25, 2016 | 150 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ASME NQA-1 2008 AND ASME NQA-1A-2009 ADDENDA INTO THE CONTRACT AT A COST OF $573,917.61. |
| Feb 1, 2016 | 149 | $15.8M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $11,836,800 TO CLIN 0005 AB AND ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $4,000,000.00 TO CLIN 0006.. |
| Jan 15, 2016 | 148 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NO COST CHANGE ORDER REVISING SECTION J, LIST OF ATTACHMENTS |
| Jan 7, 2016 | 147 | $13.5M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TOTAL ESTIMATE COST FUNDING IN THE AMOUNT OF $9,482,859.00 TO CONTRACT LINE NUMBER 0005 AB AND ADD INCREMENTAL OVERALL PROGRAM COST FUNDING IN THE AMOUNT OF $4,000,000.00 TO CONTRACT LINE NUMBER 0006. |
| Dec 22, 2015 | 146 | $1.6M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $1,575,179.00 TO CLIN 0005 AB. |
| Nov 19, 2015 | 143 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: A. CREATE CLIN 0010AE WITHIN THE SCHEDULE B TO REFLECT THE ADDITIONAL SCOPE OF WORK AND FUNDING THAT WAS ADDED TO NGS TESTING IN MODIFICATION 118. CLIN 0010AE WILL BE ADDED TO REFLECT THE VALUE OF $184,178.00. SECTION B IS HEREBY REPLACED IN ITS ENTIRETY BY THE ATTACHED SECTION B. B. IN ADDITION, SCHEDULE B HAS UPDATED TO INCLUDE FUNDING DATA AS OF MOD 141. |
| Nov 19, 2015 | 144 | $1.7M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,700,590.00 TO CLIN 0005 AB. |
| Oct 28, 2015 | 141 | $20.9M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $20,915,297.00 TO CLIN 0005AB. |
| Oct 23, 2015 | 142 | $0 | THE PURPOSE OF THIS MODIFICATION IS INCORPORATE THE CONFERENCE MANAGEMENT CLAUSE IN SECTION H AT NO COST TO THE GOVERNMENT. |
| Sep 30, 2015 | 140 | $123.6K | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING IN THE AMOUNT OF $123,592.85 TO CLIN 0010 TARGET/MAX INCENTIVE FEE. |
| Sep 28, 2015 | 139 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DOE O 420.1C CHANGE 1 FACILITY SAFETY AT NO COST TO THE GOVERNMENT. CLIN 0006 HAS BEEN MODIFIED TO REFLECT THE IMPLEMENTATION OF DOE O 420.1C CHANGE 1 FACILITY SAFETY. THIS ORDER IS HEREBY ADDED TO SECTION J ATTACHMENT K BY REFERENCE. DOE O 420.1C CHANGE 1 IS INCORPORATED FOR ALL CLIN 0006 AND CLIN 0007 ACTIVITIES. ALL ASSUMPTIONS DOCUMENTED IN ATTACHMENT A OF MODIFICATION 0135 WITH THE IMPLEMENTATION OF 420.1C FACILITY SAFETY WILL REMAIN INTACT. |
| Jun 1, 2015 | 138 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE BID SCHEDULE TO REFLECT MODIFICATION 118 AND CORRECT THE TOTAL VALUE OF THE CONTRACT TO $1,737,939,333.27 |
| May 8, 2015 | 137 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE TOTAL CONTRACT VALUE. THE TOTAL CONTRACT VALUE IS $1,737,812,838.00. |
| May 5, 2015 | 136 | $9.6M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE SALT WASTE PROCESSING FACILITY CONTRACT. |
| Apr 30, 2015 | 135 | $51.6M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE SALT WASTE PROCESSING FACILITY CONTRACT AND INCORPORATE DOE ORDER 420.1C FACILITY SAFETY. |
| Apr 2, 2015 | 134 | $10.3M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE SALT WASTE PROCESSING FACILITY CONTRACT |
| Mar 31, 2015 | 133 | $0 | MODIFICATION IS TO UPDATE THE KEY PERSONNEL ON THE SWPF PROJECT. |
| Mar 2, 2015 | 132 | $11.8M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT |
| Jan 29, 2015 | 131 | $10.2M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT |
| Jan 8, 2015 | 129 | $10.9M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT |
| Dec 19, 2014 | 128 | $0 | MODIFICATION TO INCORPORATE THE REQUIREMENTS OF DOE ORDER 414.1D AS WELL AS FAR 52.203-17 WHISTLEBLOWER CLAUSE INTO SALT WASTE PROCESSING FACILITY CONTRACT |
| Oct 22, 2014 | 127 | $21.9M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Sep 29, 2014 | 126 | $671.6K | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Sep 5, 2014 | 125 | $12.1M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Jun 24, 2014 | 124 | $17.4M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| May 14, 2014 | 123 | $20.0M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Apr 7, 2014 | 122 | $1.0M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Jan 14, 2014 | 121 | $32.0M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Dec 2, 2013 | 120 | $21.0M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Sep 24, 2013 | 119 | $5.0M | MODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT. |
| Jul 19, 2013 | 118 | $184.2K | MODIFICATION IS TO DEFINITIZE A CHANGE ORDER FOR ADDITIONAL NEXT GENERATION SOLVENT TESTING. |
| Jun 27, 2013 | 117 | $80.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $80,000,000. |
| Jun 17, 2013 | 116 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO MAKE THE FOLLOWING CHANGES PURSUANT TO FAR 52.232-22, LIMITATION OF FUNDS (APR 1984) AS A RESULT OF THE AGREEMENT IN PRINCIPLE SIGNED ON APRIL 18, 2013 IN RESPONSE TO PARSONS COST OVERRUN PROPOSAL UNDER A CONSTRAINED FUNDING PROFILE (V-PMP-J-00033, REV.0) DATED JANUARY 31, 2013 AS MODIFIED ON FEBRUARY 19, 2013 |
| Feb 19, 2013 | 115 | $7.5M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND FUND CONTRACT TO CURRENT TOTAL CONTRACT VALUE. |
| Jan 31, 2013 | 114 | $14.6M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING. |
| Nov 14, 2012 | 113 | $11.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING. |
| Aug 27, 2012 | 112 | $0 | THE PURPOSE OF THIS MODIFICATION IS ADD DEPARTMENT OF ENERGY ENVIRONMENTAL MANAGEMENT STAFF AT HEADQUARTERS AS A RECIPIENT OF THE CONTRACTORS' MONTHLY STATUS REPORT. |
| Aug 10, 2012 | 110 | $40.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING. |
| Aug 10, 2012 | 111 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ACKNOWLEDGE CONTRACTOR'S LEGAL NAME CHANGE. |
| Apr 17, 2012 | 108 | $50.0M | MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Mar 15, 2012 | 107 | $18.2M | MODIFICATION IS TO UPDATE THE KEY PERSONNEL ON THE SWPF PROJECT. |
| Mar 6, 2012 | 106 | $-4.8M | MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER FOR ADD"13.8KV SAFETY DISCONNECT SWITCHES".. |
| Mar 2, 2012 | 105 | $0 | MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER FOR ADD"13.8KV SAFETY DISCONNECT SWITCHES".. |
| Feb 1, 2012 | 103 | $25.0M | TAS::89 0251::TAS MODIFICATION IS TO ADD DOE ORDERS TO THE CONTRACT AT NO COST TO THE GOVERNMENT. |
| Dec 9, 2011 | 102 | $0 | TAS::89 0251::TAS MODIFICATION IS TO ADD DOE ORDERS TO THE CONTRACT AT NO COST TO THE GOVERNMENT. |
| Nov 30, 2011 | 101 | $30.0M | MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THIS CONTRACT. |
| Nov 7, 2011 | 100 | $0 | MODIFICATION IS TO DEFINITIZE A CHANGE ORDER FOR NEXT GENERATION SOLVENT. |
| Sep 6, 2011 | 99 | $7.1M | TAS::89 0251::TAS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE BID SCHEDULE AND PARAGRPH E TO FIX AMBIGUOUS AND ERRONEOUS LANGUAGE LEFT OUT DURING MOD 076. |
| Aug 16, 2011 | 98 | $81.2M | TAS::89 0251::TAS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE BID SCHEDULE AND PARAGRPH E TO FIX AMBIGUOUS AND ERRONEOUS LANGUAGE LEFT OUT DURING MOD 076. |
| Aug 4, 2011 | 97 | $0 | MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE BID SCHEDULE AND PARAGRPH E TO FIX AMBIGUOUS AND ERRONEOUS LANGUAGE LEFT OUT DURING MOD 076. |
| Jul 15, 2011 | 96 | $0 | TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR ADD TWO COALECSER PUMPS ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT. |
| Jul 11, 2011 | 95 | $0 | TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR ADD TWO COALECSER PUMPS ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT. |
| Jun 23, 2011 | 94 | $0 | TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR ADD TWO COALECSER PUMPS ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT. |
| Jun 20, 2011 | 93 | $0 | TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT. |
| Jun 16, 2011 | 92 | $53.0M | TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT. |
| Jun 3, 2011 | 91 | $0 | TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT. |
| May 13, 2011 | 89 | $0 | TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT. |
| May 9, 2011 | 88 | $7.0M | TAS::89 0251::TAS MODIFICATION FOR INCREMENTAL FUNDING THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Apr 8, 2011 | 86 | $955.0K | TAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Apr 8, 2011 | 87 | $30.0K | TAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Mar 18, 2011 | 84 | $0 | TAS::89 0251::TAS MODIFICATION TO THE ADMINISTRATIVE AMOUNT OBLIGATED ON CONTRACT FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Mar 18, 2011 | 85 | $35.0M | TAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Mar 15, 2011 | 83 | $0 | TAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Feb 11, 2011 | 82 | $0 | TAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Jan 31, 2011 | 81 | $25.0M | TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Nov 22, 2010 | 80 | $0 | TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Nov 18, 2010 | 79 | $42.0M | TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Sep 29, 2010 | 76 | $0 | TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Sep 29, 2010 | 77 | $3.3M | TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Sep 29, 2010 | 78 | $3.0M | TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT |
| Jul 30, 2010 | 75 | $75.0M | TAS::89 0251::TAS FUNDING FOR SWPF PROJECT |
| May 12, 2010 | 74 | $43.5M | TAS::89 0251::TAS INCREMENTAL FUNDING FOR SALT WASTE PROCESSING FACILITY PROJECT |
| Feb 16, 2010 | 73 | $75.0M | SWPF CONCEPTUAL DESIGN |
| Dec 15, 2009 | 72 | $55.0M | SWPF CONCEPTUAL DESIGN |
| Nov 17, 2009 | 71 | $0 | SWPF CONCEPTUAL DESIGN |
| Oct 30, 2009 | 70 | $0 | SWPF CONCEPTUAL DESIGN |
| Sep 30, 2009 | 69 | $3.0M | INCREMENTAL FUNDING FOR SALE WASTE PROCESSING FACILITY CONCEPTUAL DESIGN |
| Sep 22, 2009 | 68 | $24.5M | SWPF CONCEPTUAL DESIGN |
| Sep 11, 2009 | 67 | $23.6M | SWPF CONCEPTUAL DESIGN |
| Jun 22, 2009 | M065 | $0 | SWPF-OBLIGATION OF FUNDS |
| May 1, 2009 | 64 | $54.0M | SWPF-OBLIGATION OF FUNDS |
| Apr 6, 2009 | A063 | $11.2M | SWPF-OBLIGATION OF FUNDS |
| Mar 26, 2009 | A062 | $10.0M | SWPF-OBLIGATION OF FUNDS |
| Dec 31, 2008 | A061 | $2.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING. |
| Nov 6, 2008 | A059 | $29.8M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING. |
| Nov 6, 2008 | M060 | $0 | |
| Nov 5, 2008 | M058 | $0 | |
| Oct 14, 2008 | M057 | $0 |
Research next steps
- Review the award scope and buyer evidence before making a bid/no-bid decision.