Federal contract award

DEAC0902SR22210

SALT WASTE PROCESSING FACILITY CONCEPTUAL DESIGN

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeSAVANNAH RIVER OPERATIONS OFFICE
NAICS236210 — Industrial Building Construction
PSCY199 — Construction of Miscellaneous Buildings
Parent award / vehicleNot reported
Set-asideNot reported
Pricing typeCOST PLUS INCENTIVE FEE
Obligations$2.2B
Current contract value$2.3B
Potential contract value / ceiling$2.3B
Start dateSep 15, 2002
Current end dateApr 30, 2022
Potential end dateApr 30, 2022
Latest award activityNov 24, 2020
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 200 of 252 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 29, 2024261$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE SETTLEMENT AGREEMENT INTO THE CONTRACT.
Aug 28, 2024260$10.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Feb 27, 2024259$4.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT AND TO CHANGE THE INVOICE APPROVING OFFICIAL.
Feb 17, 2022258$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CLIN 7 - ONE-YEAR OF OPERATIONS-OCCURRED, ONE-YEAR OF OPERATIONS-ESTIMATE TO COMPLETE, AND HOT COMMISSIONING
Jan 3, 2022257$18.1MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $18,095,000.00 TO CONTRACT LINE ITEM 0008 TRANSITION. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Dec 20, 2021256$0THE PURPOSE OF THIS MODIFICATION IS TO MAKE THE FOLLOWING CHANGES: 1. MODIFICATION 0256 IS ISSUED AS A DEFINITIZED MODIFICATION TO MODIFICATION 247 (CLIN 8 ONLY) TO CONTRACT NO. DE-AC09-02SR22210. 2. THIS DEFINITIZED MODIFICATION WILL ADD COSTS TO
Dec 7, 2021254$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE DE-AC09-02SR22210, TO INCORPORATE THE CHANGES TO THE CAGE CODE AND VENDOR ADDRESS PER PARSONS LETTER REFERENCE NUMBER: 00-700-29315, ADDRESS CHANGE TO CAGE CODE 1BVK6, PARSONS GOVERNMENT SERVICES INC., DA
Nov 10, 2021255$13.6MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $13,572,823.00 TO CONTRACT LINE ITEMS (CLINS) 0007 - OPERATIONS AND 0008 - TRANSITION.
Oct 14, 2021253$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE DE-AC09-02SR22210, TO INCORPORATE THE FAR DEVIATION TEXT IN SECTION I OF THE CONTRACT AS INCLUDED IN THE ATTACHED CIVILIAN AGENCY ACQUISITION COUNCIL (CAAC) LETTER 2021-03, DATED SEPTEMBER 30, 2021.
Sep 29, 2021252$0THE PURPOSE OF THIS UNDEFINITIZED MODIFICATION IS TO MAKE CHANGES BASED ON THE AGREEMENT IN PRINCIPLE (AIP) THAT WAS DUALLY SIGNED ON MAY 6, 2021 AND TO TRANSFER $400,000 FROM CLIN 7 AND MOVE TO CLIN 8 (ALL FUNDING FOR BOTH CLINS 7 & 8 WERE OBLIG
Sep 28, 2021251$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J ATTACHMENT M THE ADVANCE AGREEMENT RELATED TO IMPACTS RESULTING FROM THE PARTIAL STOP WORK ORDER
Sep 1, 2021249$10.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $10,000,000.00 TO CONTRACT LINE ITEM (CLIN) 0007.
Sep 1, 2021250$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE TYPOGRAPHICAL ERROR IN THE OBLIGATED FUNDING AMOUNT IN MODIFICATION 249 FROM OF $23,833,427.00 TO $10,000,000.00 TO CONTRACT LINE ITEM (CLIN) 0007.
Aug 19, 2021248$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CHANGE: A. CONTRACTING OFFICER FROM JORDAN RHOADES TO SUZANNE HUNT B. CONTRACTING SPECIALIST FROM SYLVIA MARONEY TO SUZANNE HUNT C. INVOICE APPROVING OFFICIAL FROM JORDAN RHOADES TO SUZANNE
Aug 5, 2021247$0SEE PAGE 2 FOR A DESCRIPTION OF THE MODIFICATION.
Jul 26, 2021246$0SEE PAGE 2 FOR A DESCRIPTION OF THE MODIFICATION.
Jun 24, 2021245$23.8MHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $23,833,427.00 TO CONTRACT LINE ITEM (CLIN) 0007.
Apr 15, 2021244$0THE PURPOSE OF THIS MODIFICATION IS TO: A. REVISE THE OVERTIME PREMIUM AMOUNT AUTHORIZED BY CLAUSE I.31, FAR 52.222-22 PAYMENT OF OVERTIME PREMIUMS (JUL 1990), PARAGRAPH (A). THE AUTHORIZED OVERTIME PREMIUM AMOUNT IS INCREASED BY $1,000,000.00 FRO
Mar 22, 2021241$21.8MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $21,825,096.00 TO CONTRACT LINE ITEM (CLIN) 0007.
Mar 18, 2021242$0HE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST OF LAWS, REGULATIONS, AND DOE DIRECTIVES APPLICABLE TO THIS CONTRACT UNDER SECTION J DOE ORDER 142.3B.
Mar 18, 2021243$01. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Feb 11, 2021240$0TO INCORPORATE UPDATED SECTION J, LIST OF ATTACHMENTS M, ADVANCE AGREEMENT RELATED TO IMPACTS RESULTING FROM PARTIAL STOP WORK ORDER (NONPORTABLE WORK ONLY) ASSOCIATED WITH THE CORONAVIRUS EPIDEMIC IMPACTS AT SAVANNAH RIVER SITE SALT WASTE PROCESSING
Feb 10, 2021239$24.5MTHE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN INTERNAL ERROR IN RELATION TO MODIFICATION 84 BETWEEN THE STARS AND STRIPES SYSTEMS.
Jan 26, 2021236$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE ADDITION OF DOE O 420.1C, CHANGE 3 AND DOE STANDARD 1066-2016 UNDER CONTRACT NUMBER DE-AC09-02SR22210.
Jan 26, 2021238$11.7MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $11,658,195.00 TO CONTRACT LINE ITEM (CLIN) 0007.
Jan 20, 2021237$0A. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE KEY PERSONNEL LIST LOCATED IN PART III LIST OF DOCUMENTS, EXHIBITS, ATTACHMENTS SECTION J ATTACHMENT F. B. MR. TONY MAXTED SHALL PROVIDE PROJECT SUPPORT ASSISTANCE TO THE PROJECT MANAGER THROUGH H
Dec 30, 2020235$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGE BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
Dec 23, 2020234$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGE BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
Dec 16, 2020232$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST OF LAWS, REGULATIONS, AND DOE DIRECTIVES APPLICABLE TO THIS CONTRACT UNDER SECTION J DOE ORDER 470.3C CHG 1.
Dec 14, 2020233$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGE BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY TO REFLECT THE UPDATE OF CONTRACT CLAUSE H.48 CARES ACT. 2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Nov 30, 2020230$0A. THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE KEY PERSONNEL LIST LOCATED IN PART III LIST OF DOCUMENTS, EXHIBITS, ATTACHMENTS SECTION J ATTACHMENT F. B. PART III SECTION J ATTACHMENT F IS DELETED IN ITS ENTIRETY AND REPLACED HERETO. C. ALL O
Nov 24, 2020228$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE SWPF GLYCOLIC ACID SAFETY BASIS PROPOSAL V-PMP-J-0069 REV 0 IN SUPPORT OF CHANGES IN THE SAFETY BASIS (SB) ANALYSIS TO SUPPORT AN ALTERNATE REDUCTANT (GLYCOLIC ACID) TO INCLUDE CHANGES IN RESIDUAL
Nov 24, 2020231$19.2MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $19,236,750.00 TO CONTRACT LINE ITEM (CLIN) 0007.
Nov 12, 2020229$0A. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST OF LAWS, REGULATIONS, AND DOE DIRECTIVES APPLICABLE TO THIS CONTRACT UNDER SECTION J. DOE ORDER 486.1A FOREIGN GOVERNMENT SPONSORED OR AFFILIATED ACTIVITIES DATED 09/04/2020 IS HEREBY ADDED UN
Oct 16, 2020227$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE SECTION H IN ITS ENTIRETY DUE TO THE UPDATE OF CONTRACT CLAUSE H.48.
Oct 7, 2020224$0UPDATE DOE O 140.1A INTERFACE WITH THE DEFENSE NUCLEAR FACILITIES SAFETY BOARD TO SECTION J ATTACHMENT K LIST B/APPLICABLE DOE DIRECTIVES AND ORDERS. LIST B IS DELETED IN ITS ENTIRETY AND IS REPLACED BY SECTION J APPENDIX K ATTACHED.
Oct 6, 2020221$0THE PURPOSE OF THIS MODIFICATION IS TO MAKE AN ADMINISTRATIVE CHANGE TO SECTION C AND REPLACE IT IN ITS ENTIRETY. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Oct 1, 2020226$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR ON MODIFICATION 0225.
Sep 29, 2020225$12.3MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $12,290,462.02 TO CONTRACT LINE ITEM (CLIN) 0007.
Sep 16, 2020223$15.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $15,000,000.00 TO CONTRACT LINE ITEM (CLIN) 0007. THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 119 - $3,10
Sep 11, 2020222$-12.1MTHE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $12,100,000.00 FROM CONTRACT LINE ITEM (CLIN) 0007 AND BE REPROGRAMED AND FURTHER OBLIGATED FOR WORK TO BE PERFORMED ON CLIN 0007. THE FUNDING SHOULD BE ALLOCATED AS FOLL
Aug 26, 2020220$4.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $4,600,000.00 TO CLIN 0006. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Aug 17, 2020218$0THE PURPOSE OF THIS MODIFICATION IS TO: A) CREATE SUB-CLIN 0006AH PROJECT CLOSEOUT IN ORDER TO SEGREGATE ALL PROJECT CLOSEOUT COSTS. VALUE IN THE AMOUNT OF $300,000.00 FROM SUB-CLIN 0006AA COMMISSIONING TARGET COST WILL BE REMOVED AND PLACED ONTO
Aug 12, 2020219$14.9MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $11,100,000.00 TO CLIN 0007.
Aug 6, 2020216$0THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE CONTRACTUAL PERIOD OF PERFORMANCE DATE IN SECTION F.
Aug 3, 2020217$3.5MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $3,500,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 1
Jul 31, 2020215$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION B IN ITS ENTIRETY. SECTION B HAS BEEN UPDATED TO IMPLEMENT 10 CFR 851, WORKERS SAFETY AND HEALTH PROGRAM (2018). 2. REPLACE SECTION C IN ITS ENTI
Jun 23, 2020214$0THE PURPOSE OF THIS MODIFCATION IS TO DOCUMENT THE PARTIAL STOP WORK ORDER
Jun 15, 2020213$0ADD DOE O 227.1A CHG 1 INDEPENDENT OVERSIGHT PROGRAM TO THE CONTRACT
Jun 4, 2020212$6.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OTHER PROJECT COSTS FUNDING IN THE AMOUNT OF $6,000,000.00 TO CONTRACT LINE ITEM NUMBER 0006AE. THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CONTRACT LINE ITEM NUMBERS: CONTRACT LINE ITEM NUMBER 0005 AB: TEC FUNDING MODIFICATION 117 - $80,000,000.00 - FISCAL YEAR 13 MODIFICATION
Jun 2, 2020211$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: (1) THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ERROR IN CLIN 0007 ACCOUNTING CODES OBLIGATED TO THE CONTRACT BY A: DEOBLIGATE $1,000,000.00 THAT WAS PLACED
Apr 28, 2020210$0COVID-19 3610 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION H IN ITS ENTIRETY. SECTION H HAS BEEN UPDATED TO REFLECT THE FOLLOWING CHANGE: A. ADD H.48 CARES ACT 2. THE TOTAL COST OF THE
Apr 27, 2020206$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION J IN ITS ENTIRETY. SECTION J HAS BEEN UPDATED TO REFLECT THE FOLLOWING CHANGES: A. ADD ADVANCE AGREEMENT (PARTIAL STOP WORK ORDER-COVID-19) AS AT
Apr 27, 2020208$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REPLACE SECTION J IN ITS ENTIRETY. SECTION J HAS BEEN UPDATED TO REFLECT THE FOLLOWING CHANGE: A. REPLACE ATTACHMENT L (DIRECTED CHANGES TO THE STATEMENT OF WORK
Apr 27, 2020209$15.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $15,000,000.00 TO CLIN 0001 THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 1
Apr 17, 2020207$1.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD OPERATIONALL FUNDING IN THE AMOUNT OF $1,000,000.00 TO CLIN 0007 THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 119 -
Apr 7, 2020205$10.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $10,000,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD
Mar 3, 2020204$12.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $12,000,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD
Feb 13, 2020203$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. REMOVE DOE O 450.1, CHG 2 ENVIRONMENTAL PROTECTION PROGRAM DATED 01/15/2003 2. ADD DOE ORDER 436.1 DEPARTMENTAL SUSTAINABILITY DATED 05/02/2011 TO BE EFFECTIVE 1
Feb 4, 2020202$12.1MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $12,051,165 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD 11
Jan 14, 2020201$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. MODIFY SECTION C, STANDARD 5, TABLE C.5-5.1 (HOT COMMISSIONING PERFORMANCE TESTING) AND REMOVE THE REQUIREMENT FOR THE ALPHA FINISHING PROCESS (AFP) FROM THE PROCES
Dec 10, 2019200$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. CHANGE DOE ORDER 151.1D COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM FROM 151.1D DATED 06/28-2019 TO 151.1D MINCHG DATED 10/14/2019 (OFFICIAL USE ONLY) DATED 11/23/20
Nov 27, 2019199$17.5MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $17,500,000.00 TO CLIN 0006AE THE FUNDING SHOULD BE ALLOCATED AS FOLLOWS TO THE VARIOUS CLINS: CLIN 0005 AB: TEC FUNDING MOD 117 - $80,000,000.00 - FY 13 MOD
Nov 19, 2019198$0THE PURPOSE OF THIS MODIFICATION IS TO: (A) CORRECT A TYPOGRAPHICAL ERROR ON MODIFICATION 0190 FUNDING ONLY. (B) THIS ERROR FLOWED INTO SUBSEQUENT FUNDING MODIFICATIONS 0193 AND 0194 FROM MODIFICATION 0190. (C) THIS TYPOGRAPHICAL ERROR DID N
Sep 23, 2019197$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. CHANGE DOE ORDER 151.1 COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM, FROM 151.1C DATED 11/02/2005 TO 151.1D DATED 06/28/2019.
Sep 12, 2019196$0SEE PAGE 2 FOR DESCRIPTION OF MODIFICATION
Aug 15, 2019195$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES BELOW: 1. CHANGE DOE ORDER 142.3 UNCLASSIFIED FOREIGN VISITORS PROGRAM FROM 142.3 CHG 1 DATED 02/28/2008 TO 142.3A CHG 1 DATED 01/18/2019.
Aug 6, 2019194$42.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $42,000,000.00 TO CLIN 0006AE THIS FUNDING MODIFICATION HEREBY PROVIDES AN ADDITIONAL $15,000,000.00 FOR USE IN FY19. THE BALANCE OF THE FUNDING ($27,000,000.00)
Aug 1, 2019193$677.6KTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPERATIONAL PROGRAM COST FUNDING IN THE AMOUNT OF $677,635.00 TO CONTRACT LINE ITEM 0006.
Jul 31, 2019192$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE LIST B WITH DOE ORDERS 205.1C AND 442.1B, AND TO UPDATE STANDARD 8 (SAFEGUARDS AND SECURITY).
Jun 25, 2019191$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO AUTHORIZE PARSONS GOVERNMENT SERVICES TO UTILIZE THE NNSA / EM SUPPLY CHAIN MANAGEMENT CENTER (SCMC)IN SUPPORT OF THE DEPARTMENT OF ENERGY SAVANNAH RIVER SITE (DOE-SR) SALT WASTE PROCESSING FACILITY (SWPF).
May 6, 2019190$27.3MTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OTHER PROJECT COST FUNDING IN THE AMOUNT OF $27,322,365.00 TO CLIN 0006 AE.
Mar 18, 2019189$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OTHER PROJECT COSTS FUNDING IN THE AMOUNT OF $23,500,000.00 TO CONTRACT LINE ITEM 0006 AE.
Mar 1, 2019188$23.5MTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $23,500,000.00 TO CLIN 0006 AE.
Dec 10, 2018187$23.5MTHE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $23,500,000.00 TO CLIN 0006 AE. ALSO TO ADD SUBCLIN 0006AE TO TRACK THE INCREASE IN THE TOTAL CONTRACT COST RELATED TO THE OVER TARGET BASELINE FOR WESTLOCK VALVE/ PERFORMANCE ISSUES FUNDING ONLY.
Sep 26, 2018185$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO TAKE OFF SUBTOTALS OF FUNDING AT THE CLIN LINES.
Aug 29, 2018184$5.9MTHE PURPOSE OF THIS MODIFICATION IS TO UPDATE DOE ORDER 460.1 AND ADD 140.1 TO SECTION J - LIST OF ATTACHMENTS, ATTACHMENT K, LIST OF APPLICABLE DIRECTIVES (LIST B).
Aug 1, 2018183$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DOE ORDER 460.1 AND ADD 140.1 TO SECTION J - LIST OF ATTACHMENTS, ATTACHMENT K, LIST OF APPLICABLE DIRECTIVES (LIST B).
Jun 12, 2018182$28.4MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $28,359,000.00 TO CLIN 0006.
Mar 22, 2018181$13.7MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $13,689,002.00 TO CLIN 0006.
Mar 1, 2018179$6.4MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $6,368,059.00 TO CLIN 0006.
Feb 28, 2018180$0SEE PAGE 2 FOR DETAILS
Feb 6, 2018178$0SEE PAGE 2 OF THE MODIFICATION FOR DESCRIPTION OF MODIFICATION.
Jan 10, 2018177$13.4MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $13,375,247.00 TO CLIN 0006.
Dec 18, 2017176$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE MR. BRAD SWANSON FROM THE POSITION OF PLANT MANAGER IN SECTION J, ATTACHMENT F, KEY PERSONNEL AND REPLACES HIM WITH MICHAEL PITTMAN. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Oct 18, 2017175$22.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $21,962,831.00 TO CLIN 0006
Oct 12, 2017174$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE SCOPE OF WORK FOR NEXT GENERATION SOLVENT (NGS) COLD CHEMICAL FEED FACILITY (CCFF) ON CONTRACT NO. DE-AC09-02SR22210.
Sep 7, 2017172$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE MODIFICATION 0169 IN ACCORDANCE , DOE ORDER 232.2A,"OCCURRENCE REPORTING AND PROCESSING OF OPERATIONS INFORMATION"
Aug 25, 2017173$23.5MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $23,450,919.00 TO CLIN 0006
Aug 4, 2017171$9.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $9,617,400.00 TO CLIN 0006
Jul 7, 2017170$9.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $9,617,400.00 TO CLIN 0006
Jun 20, 2017169$0THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A UNDEFINITIZED MODIFICATION TO THE CONTRACTOR TO IMPLEMENT DOE ORDER 232.2A
Jun 13, 2017168$10.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $10,575,575.00 TO CLIN 0006
Mar 20, 2017167$0SEE PAGE 2 FOR THE DESCRIPTION OF THE MODIFICATION.
Feb 9, 2017162$0SEE PAGE 2 FOR THE DESCRIPTION OF THE MODIFICATION.
Feb 7, 2017166$22.2MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $22,056,811 TO CLIN 0006 AND $100,000.00 TO CLIN 0006 AC
Jan 17, 2017165$19.1MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $19,143,539.00 TO CLIN 0006
Jan 9, 2017164$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE THE WBS (ATTACHMENT 2) FOR NEXT GENERATION SOLVENT ADDED DURING MODIFICATION 156 WITH THE UPDATED WBS ATTACHED. NO ADDITIONAL COSTS ARE ASSOCIATED WITH THIS MODIFICATION
Nov 25, 2016163$12.9MTHE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL OTHER PROCUREMENT COST FUNDING IN THE AMOUNT OF $12,895,922.00 TO CONTRACT LINE ITEM 0006 B) CORRECT THE TOTAL OBLIGATED AMOUNT TO INCLUDE THE FUNDING ADDED ABOVE AND THE $1,112,285.40 IN FUNDING THAT WAS ADDED THROUGH MODIFICATION 156. C) REMOVE THE PERIOD OF PERFORMANCE
Oct 25, 2016161$9.5MTHE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF 9,542,434.00 TO CLIN 0006 B) MOVE OPC FUNDING IN THE AMOUNT OF $1,000,000.00 FROM CLIN 0005AC TO CLIN 0006
Oct 18, 2016130$0THIS MODIFICATION IS TO INCORPORATE THE BUSINESS SYSTEM REQUIREMENTS OF ACQUISITION LETTER AL2013-11 INTO THE SALT WASTE PROCESSING FACILITY CONTRACT.
Sep 30, 2016159$0THE PURPOSE OF THIS MODIFICATION IS TO SET FORTH REQUIREMENTS AND RESPONSIBILITIES FOR A DEPARTMENTAL CYBER SECURITY PROGRAM, DOE O 205.1B CHG 2, WHICH PROTECTS INFORMATION AND INFORMATION SYSTEMS.
Sep 29, 2016160$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE MR. DAVE TUTTLE FROM THE POSITION OF QUALITY ASSURANCE MANAGER IN SECTION J, ATTACHMENT F, KEY PERSONNEL AND REPLACES HIM WITH DR. THOMAS HELMS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 28, 2016156$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO NEGOTIATE WITH PARSONS TO CREATE A CONCEPTUAL DESIGN PACKAGE FOR IMPLEMENTATION OF NEXT ON CONTRACT NO. DE-AC09-02SR22210.
Aug 31, 2016158$10.0MTHE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. ADD $4,800,000.00 OF FY 08 TEC COMMISSIONING FUNDING TO CLIN 05AB. 2. ADD $5,200,000.00 OF FY 16 TEC COMMISSIONING FUNDING TO CLIN 05AB.
Aug 23, 2016157$5.0MTHE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. ADD $5,005,142.60 OF FY 16 OPC COMMISSIONING FUNDING TO CLIN 0006.
Jun 15, 2016155$55.3MTHE PURPOSE OF THIS MODIFICATION IS AS FOLLOWS: 1. ADD $2.5M FY 15 TEC FROM MISC. OBLIGATION TO CLIN 0005 AB 2. ADD $17.5M FY 16 TEC TO CLIN 0005 AB (TOTAL OF $20M TO CLIN 0005 AB) 3. ADD $12,031,294.00 FY 16 TEC TO CLIN 0005 AD 4. ADD $3,285,413.00 FY 16 TEC TO CLIN 0005 AE 5. ADD $20M FY 16 OPC COMMISSIONING TO CLIN 0006.
Jun 1, 2016151$0SEE PAGE 2 FOR A DESCRIPTION OF THE MODIFICATION.
Apr 25, 2016154$15.0MTHE PURPOSE OF THIS MODIFICATION IS TO REMOVE THE INCLUSION OF THE ALPHA FINISHING PROCESS AS PART OF THE DESIGN CAPACITY PERFORMANCE TEST FROM SECTION C STANDARD 5 COMMISSIONING AND ONE YEAR OF OPERATIONS (F)(1). IN CONSIDERATION TO THE REMOVAL OF THIS REQUIREMENT, PARSONS REMOVED THIS WORK FROM THEIR BASELINE IN THE AMOUNT OF $6,956,129.00. THE UPDATED PAGES C-30 AND C-31 ARE ATTACHED AND REFLECT THE CHANGE.
Mar 28, 2016145$0THE PURPOSE OF THIS MODIFICATION IS TO REMOVE THE INCLUSION OF THE ALPHA FINISHING PROCESS AS PART OF THE DESIGN CAPACITY PERFORMANCE TEST FROM SECTION C STANDARD 5 COMMISSIONING AND ONE YEAR OF OPERATIONS (F)(1). IN CONSIDERATION TO THE REMOVAL OF THIS REQUIREMENT, PARSONS REMOVED THIS WORK FROM THEIR BASELINE IN THE AMOUNT OF $6,956,129.00. THE UPDATED PAGES C-30 AND C-31 ARE ATTACHED AND REFLECT THE CHANGE.
Mar 28, 2016153$14.9MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $10,907,600.00 TO CLIN 0005 AB AND ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $4,000,000.00 TO CLIN 0006.
Feb 29, 2016152$18.9MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $11,014,800 TO CLIN 0005 AB AND ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $7,882,572.00 TO CLIN 0006.
Feb 25, 2016150$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ASME NQA-1 2008 AND ASME NQA-1A-2009 ADDENDA INTO THE CONTRACT AT A COST OF $573,917.61.
Feb 1, 2016149$15.8MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $11,836,800 TO CLIN 0005 AB AND ADD INCREMENTAL OPC FUNDING IN THE AMOUNT OF $4,000,000.00 TO CLIN 0006..
Jan 15, 2016148$0THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NO COST CHANGE ORDER REVISING SECTION J, LIST OF ATTACHMENTS
Jan 7, 2016147$13.5MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TOTAL ESTIMATE COST FUNDING IN THE AMOUNT OF $9,482,859.00 TO CONTRACT LINE NUMBER 0005 AB AND ADD INCREMENTAL OVERALL PROGRAM COST FUNDING IN THE AMOUNT OF $4,000,000.00 TO CONTRACT LINE NUMBER 0006.
Dec 22, 2015146$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL TEC FUNDING IN THE AMOUNT OF $1,575,179.00 TO CLIN 0005 AB.
Nov 19, 2015143$0THE PURPOSE OF THIS MODIFICATION IS TO: A. CREATE CLIN 0010AE WITHIN THE SCHEDULE B TO REFLECT THE ADDITIONAL SCOPE OF WORK AND FUNDING THAT WAS ADDED TO NGS TESTING IN MODIFICATION 118. CLIN 0010AE WILL BE ADDED TO REFLECT THE VALUE OF $184,178.00. SECTION B IS HEREBY REPLACED IN ITS ENTIRETY BY THE ATTACHED SECTION B. B. IN ADDITION, SCHEDULE B HAS UPDATED TO INCLUDE FUNDING DATA AS OF MOD 141.
Nov 19, 2015144$1.7MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,700,590.00 TO CLIN 0005 AB.
Oct 28, 2015141$20.9MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $20,915,297.00 TO CLIN 0005AB.
Oct 23, 2015142$0THE PURPOSE OF THIS MODIFICATION IS INCORPORATE THE CONFERENCE MANAGEMENT CLAUSE IN SECTION H AT NO COST TO THE GOVERNMENT.
Sep 30, 2015140$123.6KTHE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING IN THE AMOUNT OF $123,592.85 TO CLIN 0010 TARGET/MAX INCENTIVE FEE.
Sep 28, 2015139$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DOE O 420.1C CHANGE 1 FACILITY SAFETY AT NO COST TO THE GOVERNMENT. CLIN 0006 HAS BEEN MODIFIED TO REFLECT THE IMPLEMENTATION OF DOE O 420.1C CHANGE 1 FACILITY SAFETY. THIS ORDER IS HEREBY ADDED TO SECTION J ATTACHMENT K BY REFERENCE. DOE O 420.1C CHANGE 1 IS INCORPORATED FOR ALL CLIN 0006 AND CLIN 0007 ACTIVITIES. ALL ASSUMPTIONS DOCUMENTED IN ATTACHMENT A OF MODIFICATION 0135 WITH THE IMPLEMENTATION OF 420.1C FACILITY SAFETY WILL REMAIN INTACT.
Jun 1, 2015138$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE BID SCHEDULE TO REFLECT MODIFICATION 118 AND CORRECT THE TOTAL VALUE OF THE CONTRACT TO $1,737,939,333.27
May 8, 2015137$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE TOTAL CONTRACT VALUE. THE TOTAL CONTRACT VALUE IS $1,737,812,838.00.
May 5, 2015136$9.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE SALT WASTE PROCESSING FACILITY CONTRACT.
Apr 30, 2015135$51.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE SALT WASTE PROCESSING FACILITY CONTRACT AND INCORPORATE DOE ORDER 420.1C FACILITY SAFETY.
Apr 2, 2015134$10.3MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE SALT WASTE PROCESSING FACILITY CONTRACT
Mar 31, 2015133$0MODIFICATION IS TO UPDATE THE KEY PERSONNEL ON THE SWPF PROJECT.
Mar 2, 2015132$11.8MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT
Jan 29, 2015131$10.2MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT
Jan 8, 2015129$10.9MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT
Dec 19, 2014128$0MODIFICATION TO INCORPORATE THE REQUIREMENTS OF DOE ORDER 414.1D AS WELL AS FAR 52.203-17 WHISTLEBLOWER CLAUSE INTO SALT WASTE PROCESSING FACILITY CONTRACT
Oct 22, 2014127$21.9MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Sep 29, 2014126$671.6KMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Sep 5, 2014125$12.1MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Jun 24, 2014124$17.4MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
May 14, 2014123$20.0MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Apr 7, 2014122$1.0MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Jan 14, 2014121$32.0MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Dec 2, 2013120$21.0MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Sep 24, 2013119$5.0MMODIFICATION TO ADD INCREMENTAL FUNDING TO SALT WASTE PROCESSING FACILITY CONTRACT.
Jul 19, 2013118$184.2KMODIFICATION IS TO DEFINITIZE A CHANGE ORDER FOR ADDITIONAL NEXT GENERATION SOLVENT TESTING.
Jun 27, 2013117$80.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $80,000,000.
Jun 17, 2013116$0THE PURPOSE OF THIS MODIFICATION IS TO MAKE THE FOLLOWING CHANGES PURSUANT TO FAR 52.232-22, LIMITATION OF FUNDS (APR 1984) AS A RESULT OF THE AGREEMENT IN PRINCIPLE SIGNED ON APRIL 18, 2013 IN RESPONSE TO PARSONS COST OVERRUN PROPOSAL UNDER A CONSTRAINED FUNDING PROFILE (V-PMP-J-00033, REV.0) DATED JANUARY 31, 2013 AS MODIFIED ON FEBRUARY 19, 2013
Feb 19, 2013115$7.5MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND FUND CONTRACT TO CURRENT TOTAL CONTRACT VALUE.
Jan 31, 2013114$14.6MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING.
Nov 14, 2012113$11.0MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING.
Aug 27, 2012112$0THE PURPOSE OF THIS MODIFICATION IS ADD DEPARTMENT OF ENERGY ENVIRONMENTAL MANAGEMENT STAFF AT HEADQUARTERS AS A RECIPIENT OF THE CONTRACTORS' MONTHLY STATUS REPORT.
Aug 10, 2012110$40.0MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING.
Aug 10, 2012111$0THE PURPOSE OF THIS MODIFICATION IS TO ACKNOWLEDGE CONTRACTOR'S LEGAL NAME CHANGE.
Apr 17, 2012108$50.0MMODIFICATION IS TO ADD INCREMENTAL FUNDING.
Mar 15, 2012107$18.2MMODIFICATION IS TO UPDATE THE KEY PERSONNEL ON THE SWPF PROJECT.
Mar 6, 2012106$-4.8MMODIFICATION IS TO DEFINITIZE THE CHANGE ORDER FOR ADD"13.8KV SAFETY DISCONNECT SWITCHES"..
Mar 2, 2012105$0MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER FOR ADD"13.8KV SAFETY DISCONNECT SWITCHES"..
Feb 1, 2012103$25.0MTAS::89 0251::TAS MODIFICATION IS TO ADD DOE ORDERS TO THE CONTRACT AT NO COST TO THE GOVERNMENT.
Dec 9, 2011102$0TAS::89 0251::TAS MODIFICATION IS TO ADD DOE ORDERS TO THE CONTRACT AT NO COST TO THE GOVERNMENT.
Nov 30, 2011101$30.0MMODIFICATION IS TO ADD INCREMENTAL FUNDING TO THIS CONTRACT.
Nov 7, 2011100$0MODIFICATION IS TO DEFINITIZE A CHANGE ORDER FOR NEXT GENERATION SOLVENT.
Sep 6, 201199$7.1MTAS::89 0251::TAS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE BID SCHEDULE AND PARAGRPH E TO FIX AMBIGUOUS AND ERRONEOUS LANGUAGE LEFT OUT DURING MOD 076.
Aug 16, 201198$81.2MTAS::89 0251::TAS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE BID SCHEDULE AND PARAGRPH E TO FIX AMBIGUOUS AND ERRONEOUS LANGUAGE LEFT OUT DURING MOD 076.
Aug 4, 201197$0MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE BID SCHEDULE AND PARAGRPH E TO FIX AMBIGUOUS AND ERRONEOUS LANGUAGE LEFT OUT DURING MOD 076.
Jul 15, 201196$0TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR ADD TWO COALECSER PUMPS ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT.
Jul 11, 201195$0TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR ADD TWO COALECSER PUMPS ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT.
Jun 23, 201194$0TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR ADD TWO COALECSER PUMPS ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT.
Jun 20, 201193$0TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT.
Jun 16, 201192$53.0MTAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT.
Jun 3, 201191$0TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT.
May 13, 201189$0TAS::89 0251::TAS MODIFICATION IS TO ISSUE CHANGE ORDER REVISING THE SOW TO INCORPORATE NEW SCOPE FOR NGS SOLVENT TESTING ON THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT.
May 9, 201188$7.0MTAS::89 0251::TAS MODIFICATION FOR INCREMENTAL FUNDING THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Apr 8, 201186$955.0KTAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Apr 8, 201187$30.0KTAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Mar 18, 201184$0TAS::89 0251::TAS MODIFICATION TO THE ADMINISTRATIVE AMOUNT OBLIGATED ON CONTRACT FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Mar 18, 201185$35.0MTAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Mar 15, 201183$0TAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Feb 11, 201182$0TAS::89 0251::TAS MODIFICATION TO DEFINITIZE CHANGE PROPOSAL FOR THE SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Jan 31, 201181$25.0MTAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Nov 22, 201080$0TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Nov 18, 201079$42.0MTAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Sep 29, 201076$0TAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Sep 29, 201077$3.3MTAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Sep 29, 201078$3.0MTAS::89 0251::TAS FUNDING FOR SALT WASTE PROCESSING FACILITY (SWPF) PROJECT
Jul 30, 201075$75.0MTAS::89 0251::TAS FUNDING FOR SWPF PROJECT
May 12, 201074$43.5MTAS::89 0251::TAS INCREMENTAL FUNDING FOR SALT WASTE PROCESSING FACILITY PROJECT
Feb 16, 201073$75.0MSWPF CONCEPTUAL DESIGN
Dec 15, 200972$55.0MSWPF CONCEPTUAL DESIGN
Nov 17, 200971$0SWPF CONCEPTUAL DESIGN
Oct 30, 200970$0SWPF CONCEPTUAL DESIGN
Sep 30, 200969$3.0MINCREMENTAL FUNDING FOR SALE WASTE PROCESSING FACILITY CONCEPTUAL DESIGN
Sep 22, 200968$24.5MSWPF CONCEPTUAL DESIGN
Sep 11, 200967$23.6MSWPF CONCEPTUAL DESIGN
Jun 22, 2009M065$0SWPF-OBLIGATION OF FUNDS
May 1, 200964$54.0MSWPF-OBLIGATION OF FUNDS
Apr 6, 2009A063$11.2MSWPF-OBLIGATION OF FUNDS
Mar 26, 2009A062$10.0MSWPF-OBLIGATION OF FUNDS
Dec 31, 2008A061$2.0MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING.
Nov 6, 2008A059$29.8MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING.
Nov 6, 2008M060$0
Nov 5, 2008M058$0
Oct 14, 2008M057$0