Federal contract award
DEEM0001971
IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | EM-CARLSBAD |
| NAICS | 561210 — Facilities Support Services |
| PSC | F999 — Other Environmental Services, Studies, and Analytical Support |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $2.8B |
| Current contract value | $3.0B |
| Potential contract value / ceiling | $3.0B |
| Start date | Apr 19, 2012 |
| Current end date | Feb 3, 2023 |
| Potential end date | Feb 14, 2025 |
| Latest award activity | Feb 13, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 200 of 385 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Feb 13, 2025 | 385 | $-19.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 15, 2024 | 384 | $-1.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 21, 2024 | 383 | $-200 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 1, 2024 | 382 | $-39.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 2, 2023 | 381 | $-65 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 13, 2023 | 380 | $3.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 16, 2023 | 379 | $-13.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 9, 2023 | 378 | $-73.7K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 6, 2023 | 377 | $1.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 15, 2023 | 376 | $-382.2K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 1, 2023 | 375 | $-72.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 1, 2023 | 374 | $-86.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 31, 2023 | 373 | $-27.7M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 25, 2023 | 372 | $275.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 23, 2023 | 371 | $37.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 23, 2022 | 370 | $14.7M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 20, 2022 | 369 | $98.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 6, 2022 | 368 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 29, 2022 | 367 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 17, 2022 | 366 | $2.7M | THIS MODIFICATION ADDS WORK FOR OTHERS INCREMENTAL FUNDING |
| Oct 27, 2022 | 365 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 20, 2022 | 364 | $79.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 30, 2022 | 363 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 22, 2022 | 362 | $5.1M | THIS MODIFICATION PROVIDES WORK FOR OTHERS FUNDING AND CORRECTIONS. |
| Sep 15, 2022 | 361 | $25.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 14, 2022 | 360 | $-48.7K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 8, 2022 | 359 | $-4.3K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 1, 2022 | 358 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 30, 2022 | 357 | $10.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 24, 2022 | 356 | $16.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 18, 2022 | 355 | $2.6M | THIS MODIFICATION OBLIGATES AND DEOBLIGATES WORK FOR OTHERS INCREMENTAL FUNDING. |
| Aug 9, 2022 | 354 | $974.8K | THIS MODIFICATION OBLIGATES WORK FOR OTHERS INCREMENTAL FUNDING. |
| Aug 2, 2022 | 353 | $-10.0K | THIS MODIFICATION DEOBLIGATES WORK FOR OTHERS INCREMENTAL FUNDING. |
| Jul 26, 2022 | 352 | $42.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 21, 2022 | 351 | $57.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 19, 2022 | 350 | $-16.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 14, 2022 | 349 | $55.2K | THIS MODIFICATION PROVIDES WORK FOR OTHERS INCREMENTAL FUNDING |
| Jun 30, 2022 | 347 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 30, 2022 | 348 | $56.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 24, 2022 | 346 | $4.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE WORK FOR OTHERS INCREMENTAL FUNDING. |
| Jun 13, 2022 | 345 | $6.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 8, 2022 | 344 | $515.6K | THIS MODIFICATION ADDS WORK FOR OTHERS (WFO) INCREMENTAL FUNDING |
| Jun 6, 2022 | 343 | $23.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 2, 2022 | 342 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 18, 2022 | 341 | $85.0K | THIS MODIFICATION ADDS WORK FOR OTHERS (WFO) INCREMENTAL FUNDING. |
| May 16, 2022 | 340 | $5.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 10, 2022 | 339 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 4, 2022 | 338 | $16.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 2, 2022 | 337 | $12.2K | WORK FOR OTHERS (WFO) OBLIGATION OF $12,182.00 |
| Apr 26, 2022 | 336 | $7.4M | WORK FOR OTHERS (WFO) OBLIGATION OF $7,365,000.00 |
| Apr 19, 2022 | 335 | $17.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 29, 2022 | 334 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 24, 2022 | 333 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 17, 2022 | 332 | $922.8K | WFO NET OBLIGATION OF $922,845 |
| Mar 9, 2022 | 331 | $15.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 17, 2022 | 330 | $-5.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Feb 16, 2022 | 329 | $4.8M | WFO FUNDING $4,800,000 |
| Feb 15, 2022 | 328 | $-989 | DEOB WFO FUNDING $988.89 |
| Feb 8, 2022 | 327 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 17, 2021 | 326 | $69.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 19, 2021 | 324 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 19, 2021 | 325 | $-163.7K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 22, 2021 | 323 | $60.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 14, 2021 | 322 | $0 | COVID-19 - ADD COVID DOE ORDER 350.5 AND DELETE SECTION H CLAUSE H.68 FAR 52.223-99 |
| Oct 8, 2021 | 321 | $0 | COVID-19 - ADD COVID CLAUSE H.68 FAR 52.223-99 |
| Sep 30, 2021 | 320 | $16.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 23, 2021 | 319 | $4.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 22, 2021 | 318 | $70.0K | COVID-19 FUNDING ADJUSTMENT - NET $69,955.59 INCREASE |
| Sep 21, 2021 | 317 | $1.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 20, 2021 | 316 | $-16.7K | COVID FUNDING ADJUSTMENT - NET INCREASE OF $16,681.21. |
| Sep 14, 2021 | 315 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 31, 2021 | 313 | $13.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 31, 2021 | 314 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 27, 2021 | 311 | $1.3M | COVID-19 FUNDING ADJUSTMENT - NET $1,943,952.92 |
| Jul 19, 2021 | 310 | $2.4M | COVID-19 FUNDING ADJUSTMENT - NET $1,943,952.92 |
| Jul 8, 2021 | 308 | $38.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 8, 2021 | 309 | $1.9M | COVID-19 FUNDING ADJUSTMENT - NET $1,943,952.92 |
| Jun 22, 2021 | 307 | $2.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 3, 2021 | 306 | $850.3K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 2, 2021 | 305 | $37.1K | COVID-19 FUNDING OF $37,074.13 |
| May 28, 2021 | 304 | $10.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 20, 2021 | 303 | $-21.7K | COVID-19 FUNDING OF $3,385,602.43 |
| May 19, 2021 | 302 | $0 | COVID-19 FUNDING OF $3,385,602.43 |
| Apr 29, 2021 | 301 | $3.4M | COVID-19 FUNDING OF $3,385,602.43 |
| Apr 19, 2021 | 300 | $37.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 6, 2021 | 299 | $47.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 11, 2021 | 298 | $59.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 4, 2021 | 297 | $4.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 26, 2021 | 296 | $500.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 18, 2021 | 295 | $4.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 11, 2021 | 293 | $28.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 11, 2021 | 294 | $-4.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 25, 2021 | 292 | $3.5M | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FY2021 COVID-19 FUNDING IN THE AMOUNT OF $3,532,054.20. |
| Jan 19, 2021 | 291 | $39.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 12, 2021 | 290 | $11.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 21, 2020 | 288 | $0 | FY2020 COVID FUNDING ADJUSTMENT NET $0 |
| Dec 21, 2020 | 289 | $10.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 11, 2020 | 286 | $50.4K | COVID FY2020 TRU-UP FUNDING ADJUSTMENTS, NET $50,428.15. |
| Dec 11, 2020 | 287 | $749.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 10, 2020 | 284 | $40.8K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 10, 2020 | 285 | $-50.4K | COVID FY2020 TRU-UP FUNDING ADJUSTMENTS, NET ($50,428.15). |
| Dec 9, 2020 | 283 | $-836.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 8, 2020 | 282 | $7.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 7, 2020 | 281 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 19, 2020 | 280 | $5.9M | COVID FUNDING $5,914,573.11 - WIPP M&O |
| Nov 18, 2020 | 279 | $44.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 25, 2020 | 277 | $3.8M | COVID-19 FY2020 FUNDING $3,803,052.18 |
| Sep 25, 2020 | 278 | $4.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 23, 2020 | 276 | $1.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 15, 2020 | 272 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 9, 2020 | 275 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 8, 2020 | 274 | $2.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 31, 2020 | 273 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 21, 2020 | 271 | $33.7K | COVID-19 FUNDING TO WIPP CAPITAL ASSET PROJECTS |
| Aug 14, 2020 | 267 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 14, 2020 | 270 | $-33.7K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 10, 2020 | 269 | $3.8M | COVID-19 2020 FUNDING - THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATION |
| Aug 4, 2020 | 268 | $1.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 31, 2020 | 266 | $58.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 13, 2020 | 265 | $128.1K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 30, 2020 | 264 | $300.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 18, 2020 | 263 | $0 | COVID-19 FUNDING - $4,475,410.81 - THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). |
| May 21, 2020 | 262 | $0 | COVID-19 - ADDITION OF CLAUSES (NO FUNDING) - THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). |
| May 6, 2020 | 261 | $1.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 15, 2020 | 260 | $46.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 7, 2020 | 259 | $19.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 2, 2020 | 258 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 25, 2020 | 257 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 17, 2020 | 256 | $68.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 14, 2020 | 255 | $49.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 29, 2020 | 254 | $8.7M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 17, 2019 | 253 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 16, 2019 | 252 | $26.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 18, 2019 | 251 | $594.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 16, 2019 | 250 | $50.7M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 30, 2019 | 249 | $1.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 25, 2019 | 248 | $14.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 17, 2019 | 247 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 30, 2019 | 246 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 22, 2019 | 244 | $38.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 22, 2019 | 245 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 19, 2019 | 243 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 9, 2019 | 242 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 26, 2019 | 241 | $56.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 8, 2019 | 240 | $1.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 30, 2019 | 239 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Apr 29, 2019 | 238 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Apr 23, 2019 | 237 | $4.2M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Apr 18, 2019 | 236 | $71.7M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Mar 18, 2019 | 235 | $6.2M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Mar 5, 2019 | 234 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Feb 7, 2019 | 233 | $93.8M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jan 18, 2019 | 232 | $369.4K | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Dec 20, 2018 | 230 | $24.9M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Dec 20, 2018 | 231 | $3.0M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Dec 11, 2018 | 229 | $28.5M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Dec 10, 2018 | 228 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Nov 27, 2018 | 227 | $325.0K | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Nov 15, 2018 | 226 | $3.0M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Nov 8, 2018 | 225 | $24.2M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Oct 29, 2018 | 224 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 27, 2018 | 223 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 26, 2018 | 222 | $252.2K | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 24, 2018 | 221 | $354.4K | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 21, 2018 | 220 | $4.2M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 20, 2018 | 218 | $100.9K | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 20, 2018 | 219 | $3.5M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 19, 2018 | 215 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 19, 2018 | 216 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 19, 2018 | 217 | $96.2M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Aug 3, 2018 | 214 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jul 30, 2018 | 213 | $-1.8M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jul 12, 2018 | 212 | $26.9M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jul 9, 2018 | 211 | $28.9M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jun 7, 2018 | 210 | $5.0M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jun 6, 2018 | 204 | $7.1M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jun 5, 2018 | 208 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Jun 5, 2018 | 209 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| May 31, 2018 | 207 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| May 30, 2018 | 205 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| May 30, 2018 | 206 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| May 29, 2018 | 203 | $3.0M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| May 24, 2018 | 201 | $39.5K | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| May 24, 2018 | 202 | $30.1M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| May 3, 2018 | 200 | $1.3M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Apr 30, 2018 | 199 | $19.8M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Mar 22, 2018 | 198 | $2.5M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Mar 14, 2018 | 197 | $22.7M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Feb 2, 2018 | 195 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Feb 2, 2018 | 196 | $31.9M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) |
| Dec 29, 2017 | 194 | $10.6M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Dec 28, 2017 | 193 | $16.6K | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Oct 30, 2017 | 192 | $47.0M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 29, 2017 | 191 | $6.4M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 28, 2017 | 190 | $9.0M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 26, 2017 | 189 | $5.6M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 19, 2017 | 187 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 19, 2017 | 188 | $44.9M | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 18, 2017 | 186 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
| Sep 15, 2017 | 185 | $0 | IGF::OT::IGF THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM IS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT BY SAFE MANAGEMENT, RETRIEVAL, CHARACTERIZATION, TRANSPORTATION, AND DISPOSAL OF APPROVED WASTES. |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.