Federal contract award

DESC0014664

IGF::OT::IGF MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeSC OAK RIDGE OFFICE
NAICS541990 — All Other Professional, Scientific, and Technical Services
PSCU099 — Other Education and Training Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
Obligations$3.2B
Current contract value$3.8B
Potential contract value / ceiling$3.8B
Start dateMar 10, 2016
Current end dateSep 30, 2027
Potential end dateSep 30, 2027
Latest award activityAug 26, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 494 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 26, 2026496$5.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 26, 2026497$58.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 17, 2026495$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 30, 2026493$8.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 30, 2026494$10.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 29, 2026492$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 21, 2026491$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION. EO 14398
Jun 26, 2026489$12.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 26, 2026490$8.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 26, 2026487$14.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 26, 2026488$9.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 29, 2026486$12.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 28, 2026485$3.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 8, 2026484$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 27, 2026482$1.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 27, 2026483$1.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 12, 2026481$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 26, 2026479$1.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 26, 2026480$5.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 30, 2026478$-478.7KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 29, 2026477$4.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 31, 2025474$-12.6MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 31, 2025475$1.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 31, 2025476$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 16, 2025473$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Nov 24, 2025471$2.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Nov 24, 2025472$1.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Nov 7, 2025470$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Oct 31, 2025468$36.0KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Oct 31, 2025469$531.3KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 30, 2025467$119.5KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 29, 2025465$5.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 29, 2025466$62.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 17, 2025464$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 29, 2025462$2.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 29, 2025463$6.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 31, 2025459$925.7KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 31, 2025460$-14.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 16, 2025458$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 10, 2025454$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 27, 2025455$5.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 27, 2025456$4.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 13, 2025453$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 28, 2025451$5.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 28, 2025452$4.6MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 29, 2025446$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 29, 2025449$2.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 29, 2025450$3.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 28, 2025448$620.3KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 27, 2025447$-64.0KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 13, 2025444$13.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 13, 2025445$3.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 27, 2025443$8.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 26, 2025441$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 26, 2025442$804.0KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 18, 2025438$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 7, 2025435$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 31, 2025439$6.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 31, 2025440$12.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 20, 2024436$26.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 20, 2024437$4.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 17, 2024429$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Nov 25, 2024434$3.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Nov 22, 2024433$9.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Oct 30, 2024430$6.6MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Oct 30, 2024431$611.8KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Oct 30, 2024432$182.4KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 26, 2024427$14.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 26, 2024428$51.6MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 30, 2024425$8.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 30, 2024426$63.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 9, 2024424$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 7, 2024419$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 31, 2024422$24.6MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 31, 2024423$33.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 25, 2024421$22.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 24, 2024420$18.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 30, 2024417$4.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 30, 2024418$12.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 30, 2024415$14.0MMANAGEMENT OF ORISE
Apr 30, 2024416$15.0MMANAGEMENT OF ORISE
Apr 29, 2024412$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION TO REPLACE CHANGE NOTICE (RCN) ORAU 30 WITH RCN ORAU 31 DATED FEBRUARY 28, 2024, IN SECTION J, ATTACHMENT D.2.
Mar 29, 2024413$5.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 29, 2024414$6.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 29, 2024411$11.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Feb 28, 2024410$8.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 30, 2024409$13.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 29, 2024408$2.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 19, 2024407$8.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jan 10, 2024404$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION TO REPLACE CHANGE NOTICE (RCN) ORAU 28 WITH RCN ORAU 30 DATED NOVEMBER 29, 2023, IN SECTION J, ATTACHMENT D.2. RCN 29 CONTAINED NO CHANGES.
Dec 26, 2023405$7.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Dec 26, 2023406$2.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Nov 17, 2023402$924.0KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Nov 17, 2023403$1.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Oct 30, 2023400$3.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Oct 30, 2023401$251.3KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 28, 2023398$19.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Sep 28, 2023399$71.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 31, 2023396$11.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Aug 31, 2023397$58.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 31, 2023395$23.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jul 28, 2023394$14.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 28, 2023391$10.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 28, 2023392$28.6MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Jun 28, 2023393$-750.4KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 31, 2023389$1.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 30, 2023387$5.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
May 30, 2023388$22.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 28, 2023386$101.6KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 27, 2023383$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION // TO REPLACE REQUIREMENT CHANGE NOTICE (RCN) ORAU-26 WITH RCN ORAU-27, ATTACHMENT D.2, DATED APRIL 5, 2023.
Apr 27, 2023384$13.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Apr 27, 2023385$25.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION.
Mar 30, 2023381$71.0KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 30, 2023382$68.5KCOVID FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 29, 2023379$11.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 29, 2023380$4.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 28, 2023373$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 28, 2023375$6.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 28, 2023376$1.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 28, 2023377$7.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 28, 2023378$459.1KCOVID 19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 31, 2023370$5.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 31, 2023371$955.3KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 31, 2023372$-11.7KCOVID-19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 28, 2022369$74.6KCOVID-19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 23, 2022367$3.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 23, 2022368$-1.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 22, 2022366$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Nov 28, 2022365$194.2KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Nov 25, 2022363$1.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Nov 25, 2022364$1.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Nov 8, 2022358$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION // TO INCORPORATE REQUIREMENT CHANGE NOTICE (RCN) ORAU-25
Nov 2, 2022362$1.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Oct 31, 2022361$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Oct 27, 2022359$2.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Oct 27, 2022360$-2.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Sep 29, 2022355$24.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Sep 29, 2022356$68.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Sep 29, 2022357$594.1KCOVID-19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Sep 16, 2022354$1.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Sep 12, 2022353$1.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Aug 30, 2022352$1.1MCOVID-19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Aug 29, 2022350$7.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Aug 29, 2022351$50.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Aug 26, 2022349$2.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Aug 15, 2022348$2.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Aug 12, 2022347$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Aug 5, 2022346$4.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jul 26, 2022344$1.1MCOVID-19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jul 26, 2022345$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jul 25, 2022342$2.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jul 25, 2022343$28.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION OBLIGATING FUNDS AND ADMINISTRATIVELY INCREASE CONTRACT CEILING FOR THE PURPOSE OF FUNDS OBLIGATED
Jul 15, 2022341$225.3KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jul 7, 2022340$486.1KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jun 30, 2022335$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jun 30, 2022339$28.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jun 29, 2022338$614.0KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jun 17, 2022336$3.8MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jun 17, 2022337$1.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 27, 2022334$3.2MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 24, 2022333$569.7KCOVID-19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 23, 2022332$17.7MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 20, 2022331$9.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 17, 2022329$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 17, 2022330$637.5KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 6, 2022328$3.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
May 4, 2022324$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 28, 2022326$-458.6KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 28, 2022327$458.6KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 26, 2022325$374.2KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 22, 2022321$2.1MFUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 22, 2022322$12.4MFUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 22, 2022323$-118.2KCOVID 19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 15, 2022320$452.6KFUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Apr 8, 2022319$4.3MFUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 28, 2022318$-444.7KCOVID-19 FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 25, 2022316$3.3MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 25, 2022317$5.0MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 21, 2022315$647.5KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Mar 11, 2022314$1.6MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 24, 2022310$747.6KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 24, 2022311$45.5KCOVID FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 24, 2022312$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 24, 2022313$1.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 18, 2022308$2.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Feb 18, 2022309$6.5MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 31, 2022307$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 25, 2022304$582.1KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 25, 2022305$-630.6KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 25, 2022306$141.1KCOVID FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 14, 2022303$2.1MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Jan 7, 2022302$539.7KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 21, 2021301$-256.9KCOVID FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 20, 2021299$2.9MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 20, 2021300$245.0KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 14, 2021298$0MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Dec 13, 2021297$1.4MMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Nov 22, 2021294$669.1KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Nov 22, 2021295$731.1KMANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION
Nov 22, 2021296$67.9KCOVID FUNDING MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION

Estimated positioning window

Oct 25, 2026 – Mar 30, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-09-30 (340 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
494 recorded award transactions
+10 points
Latest award action: 2026-08-26
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.