Federal contract award
DTFAWA12C00064
THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL F IGF::OT::IGF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693KA9 CONTRACTING FOR SERVICES |
| NAICS | 541712 |
| PSC | AD61 — CONSTRUCTION - BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $1.5B |
| Current contract value | $1.5B |
| Potential contract value / ceiling | $1.9B |
| Start date | Aug 23, 2012 |
| Current end date | Feb 20, 2024 |
| Potential end date | Feb 20, 2024 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 476 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | P00823 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROCESS A FUNDING DE-OBLIGATION IN THE AMOUNT OF -$2,400,676.30. |
| May 22, 2025 | P00822 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO PROCESS A FUNDING DE-OBLIGATION IN THE AMOUNT OF -$2,400,676.30. |
| May 13, 2025 | P00821 | $-2.4M | THE PURPOSE OF THIS MODIFICATION IS TO PROCESS A FUNDING DE-OBLIGATION IN THE AMOUNT OF -$2,400,676.30. |
| Feb 26, 2025 | P00820 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Feb 25, 2025 | P00818 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Feb 25, 2025 | P00819 | $-380.6K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 24, 2025 | P00817 | $-106.8K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 21, 2025 | P00816 | $-102.8K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 8, 2025 | P00815 | $-147.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 7, 2025 | P00812 | $-41.2K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 7, 2025 | P00814 | $-115.3K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 6, 2025 | P00813 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 18, 2024 | P00811 | $-846.8K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 17, 2024 | P00810 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 11, 2024 | P00809 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 10, 2024 | P00808 | $10.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 2, 2024 | P00807 | $-492.9K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Nov 21, 2024 | P00806 | $-147.4K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Nov 7, 2024 | P00805 | $-44.2K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Oct 25, 2024 | P00804 | $263.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Oct 22, 2024 | P00803 | $-1.0M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 23, 2024 | P00802 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 13, 2024 | P00801 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 11, 2024 | P00800 | $150.5K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Aug 29, 2024 | P00799 | $-273.6K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Aug 7, 2024 | P00798 | $576.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jul 25, 2024 | P00797 | $-130.1K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jul 22, 2024 | P00796 | $-538.6K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jul 18, 2024 | P00795 | $-1.3M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jul 15, 2024 | P00794 | $124.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jun 26, 2024 | P00793 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jun 11, 2024 | P00792 | $-994.8K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 29, 2024 | P00791 | $840.5K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 24, 2024 | P00790 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 22, 2024 | P00789 | $-1.3M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 13, 2024 | P00788 | $224.5K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Apr 17, 2024 | P00787 | $-31.4K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Apr 3, 2024 | P00785 | $579.7K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Apr 3, 2024 | P00786 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Apr 2, 2024 | P00784 | $-168.6K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Mar 28, 2024 | P00783 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Mar 22, 2024 | P00782 | $-507.5K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Mar 14, 2024 | P00781 | $-1.9M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Mar 6, 2024 | P00779 | $834.6K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Mar 6, 2024 | P00780 | $6.3K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Mar 4, 2024 | P00778 | $-580.9K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Feb 15, 2024 | P00777 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Feb 13, 2024 | P00776 | $20.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Feb 2, 2024 | P00775 | $-2.0M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 29, 2024 | P00774 | $244.4K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 16, 2024 | P00773 | $-32.1K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 10, 2024 | P00772 | $4.4M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jan 9, 2024 | P00771 | $-269.4K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 13, 2023 | P00770 | $499.9K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 11, 2023 | P00769 | $-147.8K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 5, 2023 | P00768 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Dec 4, 2023 | P00767 | $-581.6K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Nov 16, 2023 | P00766 | $6.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Nov 15, 2023 | P00765 | $90.3K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Nov 14, 2023 | P00764 | $-1.2M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Oct 25, 2023 | P00762 | $1.2M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Oct 25, 2023 | P00763 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Oct 13, 2023 | P00761 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Oct 12, 2023 | P00760 | $-286.4K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 8, 2023 | P00755 | $1.2M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 8, 2023 | P00756 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 8, 2023 | P00757 | $-1.9M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 8, 2023 | P00758 | $318.6K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 8, 2023 | P00759 | $500.0K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Sep 7, 2023 | P00754 | $-1.3M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Aug 16, 2023 | P00753 | $-542.5K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Aug 11, 2023 | P00752 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Aug 9, 2023 | P00751 | $3.2M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Aug 5, 2023 | P00750 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Aug 4, 2023 | P00749 | $-3.2M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jul 7, 2023 | P00748 | $1.5M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| Jul 5, 2023 | P00747 | $-2.2M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 24, 2023 | P00740 | $-1.3M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 24, 2023 | P00741 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 24, 2023 | P00742 | $-340.1K | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 24, 2023 | P00743 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 24, 2023 | P00744 | $6.7M | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 24, 2023 | P00745 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 24, 2023 | P00746 | $0 | THE CONTRACTOR MUST FURNISH ALL PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN SECTION C OF THE CONTRACT. TYPES OF WORK THAT MAY BE PERFORMED UNDER THIS CONTRACT ARE DESCRIBED BELOW: SITE SURVEY, SELECTION AND ENGINEERING, CONSTRUCTION, ENVIRONMENTAL AND FIRE/LIFE SAFETY, EQUIPMENT INSTALLATION, REMOVAL, AND TEST, DRAFTING, STAGING, WAREHOUSE, AND DISTRIBUTION, CONTRACT SURVEILLANCE AND OVERSIGHT. THE CONTRACT SCOPE ALSO INCLUDES SUBCONTRACTED EFFORT FOR PUBLIC WORKS CONSTRUCTION. |
| May 11, 2023 | P00739 | $700.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 5, 2023 | P00738 | $6.5M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 28, 2023 | P00737 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 25, 2023 | P00736 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 18, 2023 | P00735 | $-5.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 11, 2023 | P00734 | $20.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 10, 2023 | P00733 | $9.5M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Mar 24, 2023 | P00732 | $-187.2K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Mar 14, 2023 | P00730 | $-457.5K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Mar 10, 2023 | P00729 | $4.9M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Feb 27, 2023 | P00727 | $-485.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Feb 27, 2023 | P00728 | $878.4K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Feb 10, 2023 | P00726 | $9.7M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Feb 3, 2023 | P00724 | $-4.0M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00717 | $15.7M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00718 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00719 | $-5.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00720 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00721 | $-4.8M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00722 | $5.3M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00723 | $200.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 12, 2022 | P00725 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Dec 6, 2022 | P00716 | $-10.1M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Nov 23, 2022 | P00714 | $-17.3M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Nov 17, 2022 | P00713 | $3.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Nov 10, 2022 | P00712 | $-15.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Nov 4, 2022 | P00710 | $-12.6M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Nov 4, 2022 | P00711 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Oct 20, 2022 | P00709 | $1.8M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Oct 13, 2022 | P00707 | $-2.5M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Oct 13, 2022 | P00708 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 22, 2022 | P00706 | $6.0M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 16, 2022 | P00703 | $36.9M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 16, 2022 | P00704 | $1.0M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 16, 2022 | P00705 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 8, 2022 | P00702 | $33.4M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 1, 2022 | P00701 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Aug 25, 2022 | P00700 | $-1.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Aug 12, 2022 | P00699 | $-642.1K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Aug 8, 2022 | P00698 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Aug 5, 2022 | P00696 | $34.3M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Aug 5, 2022 | P00697 | $25.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jul 20, 2022 | P00695 | $-3.7M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jul 15, 2022 | P00694 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jul 12, 2022 | P00693 | $-674.8K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jul 8, 2022 | P00692 | $7.7M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jul 1, 2022 | P00691 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jun 16, 2022 | P00690 | $1.3M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jun 13, 2022 | P00689 | $-214.7K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jun 9, 2022 | P00688 | $10.4M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 12, 2022 | P00687 | $156.1K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 11, 2022 | P00686 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 10, 2022 | P00685 | $-3.1M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 6, 2022 | P00682 | $7.7M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 6, 2022 | P00683 | $853.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 6, 2022 | P00684 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| May 3, 2022 | P00681 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 26, 2022 | P00680 | $-2.4M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 21, 2022 | P00679 | $45.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 20, 2022 | P00678 | $8.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 15, 2022 | P00677 | $-3.0M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 8, 2022 | P00676 | $100.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 7, 2022 | P00674 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 7, 2022 | P00675 | $13.4M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 5, 2022 | P00673 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 4, 2022 | P00667 | $22.8M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 4, 2022 | P00668 | $5.1M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 4, 2022 | P00669 | $18.0M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 4, 2022 | P00670 | $255.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 4, 2022 | P00671 | $11.1M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 4, 2022 | P00672 | $17.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 3, 2022 | P00662 | $5.4M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 3, 2022 | P00664 | $6.8M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jan 21, 2022 | P00663 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jan 20, 2022 | P00665 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Jan 20, 2022 | P00666 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 27, 2021 | P00648 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 27, 2021 | P00650 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 27, 2021 | P00656 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 27, 2021 | P00661 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Sep 17, 2021 | P00660 | $34.8M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Aug 11, 2021 | P00657 | $190.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Aug 11, 2021 | P00658 | $7.1M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Aug 10, 2021 | P00659 | $-157.5K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jul 30, 2021 | P00655 | $3.4M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jul 22, 2021 | P00654 | $-474.9K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jul 12, 2021 | P00653 | $6.7M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jul 2, 2021 | P00652 | $199.4K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jun 28, 2021 | P00651 | $19.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jun 10, 2021 | P00649 | $39.8M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| May 24, 2021 | P00647 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIR |
| Apr 20, 2021 | P00646 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Apr 14, 2021 | P00645 | $-404.9K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Apr 10, 2021 | P00644 | $65.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Apr 9, 2021 | P00643 | $12.2M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Mar 31, 2021 | P00642 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Mar 16, 2021 | P00641 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Mar 11, 2021 | P00640 | $2.3M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Mar 9, 2021 | P00639 | $-95.1K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Mar 8, 2021 | P00638 | $9.4M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Feb 18, 2021 | P00637 | $-186.6K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Feb 17, 2021 | P00636 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Feb 12, 2021 | P00635 | $13.9M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jan 27, 2021 | P00634 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jan 22, 2021 | P00633 | $-597.2K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jan 19, 2021 | P00632 | $56.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jan 16, 2021 | P00631 | $28.7M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jan 12, 2021 | P00629 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jan 12, 2021 | P00630 | $-10.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Jan 7, 2021 | P00628 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Dec 16, 2020 | P00627 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Dec 9, 2020 | P00626 | $-1.1M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Dec 4, 2020 | P00624 | $5.9M | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Dec 4, 2020 | P00625 | $52.0K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Nov 12, 2020 | P00623 | $0 | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
| Nov 10, 2020 | P00622 | $-167.6K | PROFESSIONAL, TECHNICAL AND SUPPORT LABOR, MATERIAL, SUPPLIES, MANAGEMENT SERVICES, DATA, AND FACILITIES REQUIRED TO ACCOMPLISH THE WORK TO BE ORDERED UNDER TECHNICAL FUNCTIONAL AREA WORK EFFORTS AS DEFINED IN THE CONTRACT ACROSS THE FAA NATIONAL AIRSPACE SYSTEM (NAS) |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.