Federal contract award
DTFAWA16C00021
TERMINAL FLIGHT DATA MANAGER IGF::OT::IGF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693KA7 ENROUTE & TERMINAL CONTRACTS |
| NAICS | 541512 — Computer Systems Design Services |
| PSC | E1BC — PURCHASE OF RADAR AND NAVIGATIONAL FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $581.1M |
| Current contract value | $581.1M |
| Potential contract value / ceiling | $626.2M |
| Start date | Jun 28, 2016 |
| Current end date | Jun 29, 2028 |
| Potential end date | Jun 29, 2028 |
| Latest award activity | Sep 2, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 204 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 9, 2026 | P00208 | $6.4M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B TO ADJUST CLIN CEILINGS A. DECREASE 04-004A TO ALIGN WITH ACTUAL FUNDING B. DECREASE 05-004 TO ALIGN WITH ACTUAL FUNDING C. DECREASE 05-004A TO ALIGN WITH ACTUAL FUNDING D. INCREASE 06- |
| Sep 2, 2026 | P00207 | $545.0K | MOD 207 |
| Aug 22, 2026 | P00206 | $-82 | 1) UPDATE SECTION B TO UPDATE CLIN 07-006 DESCRIPTION TO ADDRESS ATTACHMENT J-11 (REV. 16) DISPLAY SIZES FOR TTS-1 AND TTS-2 TRAINING EQUIPMENT PER AIRPORT. 2) UPDATE ATTACHMENT J-11 (REV. 16) TO UPDATE THE WATERFALL SCHEDULE AND REVISE TABLES 1 AN |
| Aug 19, 2026 | P00205 | $0 | 1) UPDATE SECTION B TO UPDATE CLIN 07-006 DESCRIPTION TO ADDRESS ATTACHMENT J-11 (REV. 16) DISPLAY SIZES FOR TTS-1 AND TTS-2 TRAINING EQUIPMENT PER AIRPORT. 2) UPDATE ATTACHMENT J-11 (REV. 16) TO UPDATE THE WATERFALL SCHEDULE AND REVISE TABLES 1 AN |
| Aug 4, 2026 | P00204 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: UPDATE SECTION G TO REALLOCATE FUNDING TO CLINS 06-001 AND 06-005. 1) FUNDING IS REALLOCATED FROM CLIN 03-002 TO CLIN 06-005 IN THE AMOUNT OF: WA-25-06916 12782A0250.2025.5FF72B07A0.WAG5310000.31047.17 |
| Jul 10, 2026 | P00202 | $424.9K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) EXERCISE CLIN 06-001 AND ESTABLISH CLIN 06-001M TO MEMORIALIZE THE OFFER FROM LEIDOS RECEIVED ON MAY 11, 2026, TO SUPPORT THE TFDM LOGISTICS, SUPPLY SUPPORT, CONTRACTOR SUPPORT SERVICES, AND REMOTE MONITORI |
| Jul 10, 2026 | P00203 | $1.0M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) EXERCISE CLIN 06-001 AND ESTABLISH CLIN 06-001M TO MEMORIALIZE THE OFFER FROM LEIDOS RECEIVED ON MAY 11, 2026, TO SUPPORT THE TFDM LOGISTICS, SUPPLY SUPPORT, CONTRACTOR SUPPORT SERVICES, AND REMOTE MONITORI |
| Jul 1, 2026 | P00201 | $879.1K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) EXERCISE CLIN 06-001 AND ESTABLISH CLIN 06-001M TO MEMORIALIZE THE OFFER FROM LEIDOS RECEIVED ON MAY 11, 2026, TO SUPPORT THE TFDM LOGISTICS, SUPPLY SUPPORT, CONTRACTOR SUPPORT SERVICES, AND REMOTE MONITORI |
| Jun 24, 2026 | P00199 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE CEILING, TRACKING TABLE AND FUND CLIN 05-004 2) ADMINISTRATIVE CORRECTION TO THE PERIOD OF PERFORMANCE FOR CLIN 0016M IN SECTION F 3) UPDATE H.5 KEY PERSONNEL FOR A CHANGE IN THE LEAD SYSTEM ARCHIT |
| Jun 24, 2026 | P00200 | $816.4K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B TO DEFINITIZE CLIN 06-004 AND CLIN 06-004A, INCREASE THE CEILING FOR CLIN 06-004, AND INCREASE THE CEILING CLIN FOR CLIN 06-004A. 2) UPDATE SECTION G TO INCREMENTALLY FUND CLINS 06-004 AN |
| Jun 18, 2026 | P00198 | $3.5M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B TO MEMORIALIZE THE FAA OFFER PROVIDED TO LEIDOS MAY 6, 2026 IN SUPPORT OF CPFF CLINS 06-005 (F&E) AND 06-005M (OPS) FOR BUILD 2.7 REQUIREMENTS. 2) SECTION F ESTABLISHMENT AND ADJUST |
| Jun 9, 2026 | P00197 | $2.5M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B A. ESTABLISH CLIN 0016M B. INCREASE CLIN 0017M CEILING TO SUPPORT CONTINUED REQUIREMENTS C. INCREASE CLIN 04-005 TO COVER AUTHORIZED COSTS FOR JUNE 2) SECTION F ADJUST AND ESTABLISHMENT |
| May 15, 2026 | P00195 | $535.4K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B A. INCREASE THE SLOC REQUIREMENT ON CLIN 05-005M (OPS) AND CORRECT THE TRAVEL REFERENCE FROM CLIN 0017 TO CLIN 0017M. B. INCREASE THE SLOC REQUIREMENT FOR CLIN 05-005 (F&E) C. UPDATE |
| May 15, 2026 | P00196 | $14.5M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B A. ADD DELTA SPARES MATERIALS ON CLIN 07-006 RESULTING FROM THE PROVISIONING CONFERENCE B. AUTHORIZED $5,000 FOR ENGINEERING ESTIMATE FOR THE BUILD 2.5T DELTA PCA AND INCREASE THE CEILING |
| May 8, 2026 | P00194 | $46.0K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B TO CLARIFY APPLICABILITY OF CLIN 0017M TO SUPPORT ALL OPS CLIN TRAVEL REQUIREMENTS AND INCREASE THE CEILING. 2) EXTEND THE PERIOD OF PERFORMANCE (POP) FOR CLIN 0017M THROUGH OCTOBER 2026. |
| Apr 27, 2026 | P00193 | $2.3M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B TO INCREASE THE CEILING A. CLIN 07-006 FOR ADDITIONAL MATERIALS AS A RESULT OF THE PROVISIONING CONFERENCE. B. CLIN 05-004 TO UPDATE THE FUNDING AMOUNT IN THE TRACKING TABLE FOR 05-004 AN |
| Apr 22, 2026 | P00192 | $435.0K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B TO AUTHORIZE CLIN 0020 FOR PROPOSAL PREPARATION ON CLIN 06-001/06-001M 2) UPDATE SECTION G TO PROVIDE INCREMENTAL FUNDING FOR CLIN 05-005M A. FUNDING IS INCREMENTALLY FUNDED ON CLIN 05-00 |
| Apr 17, 2026 | P00191 | $4.4M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B FOR 15 MORE SITES A. ESTABLISH CLIN 0018 B. APPLY SHIPPING FOR 15 SITES TO CLIN 04-006 C. INCREASE CLIN 05-002 FOR 15 SITES 2) REVISE THE STATEMENT OF WORK (SOW) C.4.4.1.5 PER SECURITY |
| Apr 14, 2026 | P00190 | $750.8K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B: A. INCREASE CEILING ON CLIN 07-006 FOR ADDITIONAL MATERIAL AND UPDATE THE CLIN DESCRIPTION B. INCREASE CEILING ON CLIN 05-004 TO SHOW UPDATES TO THE TASK ORDER AUTHORIZATION LEVELS C. I |
| Apr 9, 2026 | P00189 | $1.8M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE CLIN 07-006 IN SECTION B TO INCREASE THE CEILING FOR ADDITIONAL LAB MATERIALS. 2) FUND CLIN 07-006 IN SECTION G TO SUPPORT LAB MATERIALS. WA-26-03980 IN THE AMOUNT OF $1,839,864.00 THEREFORE, THIS |
| Apr 6, 2026 | P00188 | $-417.5K | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE TO DPAS RATING LANGUAGE 2) UPDATE SECTION B: A. CLIN 0004 TO APPLY CREDITS FOR ENGINEERING STUDY AND SOFTWARE (SW) NOW PROVIDED BY THE GOVERNMENT AND REMOVE A PARAGRAPH THAT IS CAPTURED IN TABLE |
| Mar 16, 2026 | P00187 | $24.7M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) SECTION B CHANGE TO MEMORIALIZE THE CLIN 07-006 DEFINITIZED REQUIREMENTS AND COSTS TO ESTABLISHING THE NEW CLIN 07-006 TO SUPPORT BULK BUY AND LONG LEAD MATERIAL. 2) SECTION F IS UPDATED TO EXTEND THE PER |
| Mar 4, 2026 | P00186 | $14.6M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) UPDATE SECTION B A. UPDATE CEILING AND SUMMARY TABLE FOR CLIN 05-004. B. UPDATE CEILING FOR CLIN 05-004A. C. CLIN 0004 SITE SIZE CORRECTION FOR RSW AND HOU. D. INCREASE CLIN 0017 CEILING TO SUPPORT UPCO |
| Feb 13, 2026 | P00185 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: 1) APPLY DPAS RATING TO THE CONTRACT DTFAWA-16-C-00021 2) UPDATES TO SECTION B A. ADD AIR TRAFFIC (AT) TRAINING DELTA PACKS TO CLIN 04-005T B. APPLY CREDITS FOR SOFTWARE (SW), UPDATE SITES SIZES, AND CAI/IO |
| Feb 5, 2026 | P00184 | $4.6M | THE PURPOSE OF THIS MODIFICATION IS TO: 1) SECTION B INCREASE AUTHORIZATION TO PROCEED (ATP) ON CLIN 07-006 2) SECTION F CLIN 04-005 MILESTONE UPDATED LANGUAGE 3) SECTION G ADD INCREMENTAL FUNDING AND ADMINISTRATIVE CORRECTION TO CLIN 02-004 FROM |
| Jan 28, 2026 | P00183 | $-42.5K | THE PURPOSE OF THIS MODIFICATION IS TO: 1. UPDATE SECTION B: A. REVISE TASK ORDER TRACKER IN CLIN 05-004 TO INCLUDED RECENT CHANGES FOR TO 52, 53, 55 B. INCREASE CLIN 07-006 CEILING FOR AN AUTHORIZATION TO PROCEED (ATP) FOR TWO SUPPORT LABS C. AU |
| Jan 21, 2026 | P00182 | $550.0K | THE PURPOSE OF THIS MODIFICATION IS TO 1) MEMORIALIZE THE AGREEMENT BETWEEN FAA AND LEIDOS TO INCORPORATE 7 SITES. A. UPDATE CLIN 05-002 FOR SITE IMPLEMENTATION B. UPDATE CLIN 0004 FOR PAT C. UPDATE CLIN 04-006 FOR SHIPPING COSTS D. INCREASE CL |
| Jan 12, 2026 | P00181 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE CEILING ON CLIN 04-005 BY $152,055 TO SUPPORT AIR TRAFFIC (AT) TRAINING SUBJECT MATTER EXPERT (SME). THEREFORE, THIS CONTRACT IS MODIFIED AS FOLLOWS: |
| Jan 6, 2026 | P00180 | $170.0K | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATE SECTION B A. REFRESH THE TASK ORDER TRACKER IN CLIN 05-004. B. INCREASE CLIN 04-005 CEILING FOR AN ADDITIONAL PTR (#115) FIX. C. NOTE: THE CLIN 0017 CEILING WAS INCREASE BY $22,000.00 IN MOD 179 B |
| Dec 22, 2025 | P00179 | $15.9M | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATE SECTION B A. INCREASE CLIN 07-006 CEILING FOR AN AUTHORIZATION TO PROCEED (ATP) FOR LONG LEAD EQUIPMENT. B. INCREASE CLIN 0017 FOR TRAVEL EXPENSES 2) UPDATE SECTION G A. CHANGE FAA PROGRAM MANAGE |
| Dec 15, 2025 | P00178 | $400.0K | THE PURPOSE OF THIS MODIFICATION IS TO 1) MEMORIALIZE THE AGREEMENT BETWEEN FAA AND LEIDOS TO INCORPORATE 2 ADDITIONAL SITES. 2) INCREASE CLIN 04-005 CEILING TO ACCOUNT FOR ONE ADDITIONAL PTR FIX. 3) EXTEND PERIOD OF PERFORMANCE (POP) TO CLIN 04- |
| Dec 2, 2025 | P00177 | $444.7K | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATE SECTION B AS FOLLOWS: A. INCREASE THE CEILING BY $1,873.51 ON CLIN 03-002 FOR MEDIA CONVERTERS LEIDOS REPLACED AT IAH. B. DECREASE THE CEILING FOR CLIN 03-004 TO MATCH CURRENT REDUCED FUNDING. FUN |
| Dec 1, 2025 | P00176 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO 1) SECTION B CHANGE TO DEFINITIZE TFDM CLINS: A. MEMORIALIZE THE CLIN 04-005T DEFINITIZED COSTS IN RESPONSE TO ESTABLISHING THE NEW CLIN TO SUPPORT BUILD 2.5T. B. MEMORIALIZE THE CLIN 05-001 DEFINITIZED REQU |
| Nov 24, 2025 | P00175 | $1.2M | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATES TO SECTION B: A. INCREASE THE AUTHORIZATION TO PROCEED (ATP) ON CLIN 07-006 BY $1,561,995.97 FROM $700,000.00 TO $2,261,995.97 TO SUPPORT LONG LEAD EQUIPMENT FOR THE TSLE LAB AND DL360 GEN 10 UPGRA |
| Nov 19, 2025 | P00174 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATES TO SECTION B A. REDUCE CLIN 04-001 CEILING (NOT FUNDED AMOUNT) TO ACCOUNT FOR OPS FUNDING COVERED UNDER CLIN 05-001M IN MOD 165. B. UPDATE TASK ORDER TRACKER IN CLIN 05-004 TO SHOW COST ASSOCIATE |
| Oct 22, 2025 | P00173 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO 1) ADMINISTRATIVE CORRECTION IN SECTION J TO UPDATE DID TRNG-13 THAT WAS INTENDED FOR INCLUSION IN MOD 137 WHEN THE CORRESPONDING CDRL TR-13 WAS UPDATED AND THE CORRESPONDING UPDATES TO THE SECTION J-LIST AND |
| Sep 24, 2025 | P00172 | $800.0K | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATE AND EXERCISE CLIN 05-001 AND MEMORIALIZE THE AUTHORIZED TO PROCEED (ATP) COST OF $800,000.00 TO SUPPORT THE TFDM LOGISTICS, SUPPLY SUPPORT, CONTRACTOR SUPPORT SERVICES, AND REMOTE MONITORING AND LO |
| Sep 23, 2025 | P00171 | $700.0K | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATE AND EXERCISE CLIN 07-006 AND MEMORIALIZE AGREED TO AUTHORIZED TO PROCEED (ATP) COST OF $700,000.00 TO SUPPORT THE BULK BUY AND LONG LEAD EQUIPMENT ITEMS FOR TECHNOLOGY REFRESHMENT OF COTS HARDWARE A |
| Sep 16, 2025 | P00169 | $2.0M | THE PURPOSE OF THIS MODIFICATION IS TO 1) REVISIONS TO SECTION B FOR CLINS 05-004 AND 05-004A: A. INCREASE THE CEILING ON CLIN 05-004 TO SUPPORT TASK ORDER 55 FOR THE TECH REFRESH EQUIPMENT PURCHASES, PROCUREMENT LABOR, AND INSTALLATION LABOR |
| Sep 16, 2025 | P00170 | $3.8M | THE PURPOSE OF THIS MODIFICATION IS TO 1) SECTION B CHANGES: A. ADJUST CLIN 0020 AUTHORIZED PROPOSAL PREPARATION TO SUPPORT CLIN 05-001 PROPOSAL SUBMISSION. B. ESTABLISH CLIN 04-001M TO RECLASSIFY F&E FUNDING FROM CLIN 04-001 TO 04-001M |
| Sep 5, 2025 | P00168 | $235.5K | THE PURPOSE OF THIS MODIFICATION IS TO 1) MEMORIALIZE THE AGREEMENT BETWEEN FAA AND LEIDOS TO INCORPORATE 8 ADDITIONAL SITES A. UPDATE CLIN 05-002 (IMPLEMENTATION CLIN) TO ADD AUS, DAY, SDF, IAD, RSW, SMF, HOU, AND SAN. B. UPDATE CLIN 0004 (PRO |
| Sep 3, 2025 | P00167 | $1.7M | THE PURPOSE OF THIS MODIFICATION IS TO 1) ESTABLISH 04-005T AND MEMORIALIZE AGREED TO AUTHORIZED TO PROCEED (ATP) COST OF $1,673,443.00 FOR ESTIMATED 2.5 TO 3 MONTHS OF 04-005T TASKS RELATED TO BUILD 2.5T ENHANCEMENTS/ADDITIONAL FUNCTIONALITY F |
| Aug 25, 2025 | P00166 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO 1)UPDATES TO SECTION B TO MEMORIALIZE AGREED TO COST FOR TASKS RELATED TO DEN AND FLL PROVIDED TO LEIDOS ON AUGUST 13, 2025, IN SUPPORT OF CLIN 04-002 IMPLEMENTATION: PRE-SITE SURVEY, INSTALLATION, INTEGRATI |
| Aug 24, 2025 | P00165 | $1.7M | THE PURPOSE OF THIS MODIFICATION IS TO 1) UPDATE SECTION B TO MEMORIALIZE FAA OFFER PROVIDED TO LEIDOS AUGUST 4, 2025 IN SUPPORT OF CPFF CLIN 05-001M &CLIN 0017M. A. ADD NEW CLIN 0017M B. ADD CLIN 05-001M 2) REVISE SECTION C TO ADD DIRECTI |
| Aug 8, 2025 | P00164 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO 1)MEMORIALIZE THE AGREEMENT BETWEEN FAA AND LEIDOS TO INCORPORATE UPDATES FROM THE CURRENT WATERFALL SCHEDULE A. UPDATE CLIN 04-002 (IMPLEMENTATION CLIN) TO ADD EWR, PHL, LGA, JFK, ORD, BOS, AND MCO PER THE |
| Aug 6, 2025 | P00163 | $274.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO CLIN 03-006 AND 04-001 IN SECTION G. PR# WA-25-08410 IN THE AMOUNT OF $21,000.00 PR# WA-25-08412 IN THE AMOUNT OF $253,000.00 THE AMOUNT OF FUNDS CURRENTLY OBLIGATED IS INCREASED |
| Jul 16, 2025 | P00162 | $1.0M | 1)INFORMATIONAL CORRECTION TO CLEAR UP MOD NUMBERING ALIGNMENT FROM 154 TO 161 BETWEEN THE MOD ACTION AND PRISM. 2)CLIN 0020 CORRECTION AND UPDATE A. AUTHORIZE PROPOSAL PREPARATION COSTS FOR CLIN 05-001. B. ADMINISTRATION CORRECTION IN SECTION B T |
| Jul 3, 2025 | P00161 | $1.8M | TO CORRECT THE MOD NUMBERING ISSUE FOR TFDM WE WILL PROCESS MODS 160 AND 161 TOGETHER IN PRISM MOD 160 1) INCREASE THE COST, FEE, AND CEILING AMOUNT FOR CLIN 04-001 FROM $6,068,936.75 TO $7,195,397.15 2) REVISE SECTION C.11 AND SUBSECTIONS IN SUP |
| Jun 25, 2025 | P00160 | $10.5M | 1) UPDATE SECTION B TO INCREASE THE CEILING FOR CLINS 04-004A TO $138,933.00, 0016 TO $15,052,840.48, 0017 TO $330,110.08, AND 0020. 2) REALLOCATE UNUSED VALUE TO CLIN 20 FOR FUTURE PROPOSAL PREPARATION COSTS. 3) EXTEND PERIOD OF PERFORMANCE ON CLI |
| Jun 18, 2025 | P00159 | $1.8M | 1) UPDATE SECTION B TO MEMORIALIZE FAA OFFER PROVIDED TO LEIDOS JUNE 2, 2025 IN SUPPORT OF CPFF CLINS 05-005 & CLIN 05-005M. 2) UPDATE APPROPRIATE SECTIONS TO ESTABLISH NEW CLIN 05-005M. 3) AUTHORIZE ASSOCIATED TRAVEL UNDER CLINS 17 IN SUPPO |
| Jun 17, 2025 | P00158 | $0 | 1) SECTION B ADMINISTRATIVE CORRECTION: A. ADMINISTRATIVE CORRECTION IN SECTION B FOR CLIN 02-005AA CEILING AND REESTABLISH THE ESTIMATED COST/FEE TO CORRECT AMOUNTS ESTABLISHED IN MOD 147. B. ADMINISTRATIVE INCLUSION OF E47 PRICING IN SECTION B I |
| Jun 16, 2025 | P00157 | $0 | THE PURPOSE OF THIS MOD IS TO REDUCE CEILINGS FOR COMPLETED CLINS AND UNPRICED OPTION CLINS. CLIN 0001 - TFDM SYSTEM DESIGN & DEVELOPMENT THROUGH SITE ACCEPTANCE TESTING FOR INITIAL SITES FROM: CLIN 0001 CEILING $117,109,985.23 OVERRUN TO: CLI |
| Jun 2, 2025 | P00156 | $0 | SECTION F SPECIFIC CHANGES INSERT PERIOD OF PERFORMANCE FOR PHASE OUT AND SUPPORTING TRAVEL FOR PHASE OUT CLINS MISSING FROM THE BASE CONTRACT. SECTION G SPECIFIC CHANGES IN MODIFICATION 129, THE TOTAL CONTRACT CEILING BY MOD (G.23.A) ACCURATEL |
| May 23, 2025 | P00155 | $2.1M | MOD 152 PR# WA-25-03407 IN THE AMOUNT OF $328,000.00 MOD 154 PR# WA-25-05578 IN THE AMOUNT OF $152,000.00 PR# WA-25-05574 IN THE AMOUNT OF $1,130,000.00 PR# WA-25-05665 IN THE AMOUNT OF $30,169.00 PR# WA-25-05575 IN THE AMOUNT OF $5,000.00 |
| May 13, 2025 | P00154 | $0 | 1)ADJUST CEILING IN SECTION B ON CLINS 02-005AA (FROM MOD 153 REALLOCATION) AS WELL AS 03-004A, 04-004A, 04-004, 04-007, 05-007, 06-007, AND 07-009 TO SUPPORT ADDITIONAL FUNDING CHANGES. 2)UPDATE SECTION B CLINS 03-006, 04-002, AND 0004 TO REPLACE P |
| May 1, 2025 | P00152 | $0 | 1)INCREASE CEILING FOR CLIN 0016 FROM $11,791,822.08 TO $12,607,076.68. 2)UPDATE SECTION C TO DEFINE CDRL E47 IN SUPPORT OF THE REVISED OPERATIONAL BUILD RELEASE. 3)EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0016 TO JUNE 30, 2025. 4)PROVIDE INCREME |
| May 1, 2025 | P00153 | $0 | 1) UPDATE SECTION G TO REALLOCATE $2,136,013.13 FROM CLIN 02 005AA TO 04 005 WHICH IS THE ACTIVE CLIN SUPPORTING FUTURE ENHANCEMENTS/ADDITIONAL FUNCTIONALITY FOR TFDM SYSTEM. A. FUNDING IS REALLOCATED FROM CLIN 02-005AA IN THE AMOUNT OF: PR# WA-24 |
| Apr 2, 2025 | P00151 | $0 | 1) UPDATE SECTION B TO MEMORIALIZE AGREED TO LANGUAGE PERTAINING TO MILESTONE PAYMENT. 2) UPDATE SECTION F, CLIN 0011D BUILD 2.3 TO EXTEND OT READINESS DATE FROM 3/24/2025 TO 3/28/2025. 3) UPDATE SECTION F TO EXTEND CLIN 4 PERIOD OF PERFORMANCE TO |
| Mar 6, 2025 | P00150 | $475.0K | INADVERTENTLY LEFT OFF OF MOD 144. |
| Mar 4, 2025 | P00149 | $2.2M | PLEASE NOTE THAT PRISM MOD 149 IS LEIDOS MOD 150 1) INCREASE THE COST AND FEE TO CLIN 0016 FOR A 1 MONTH PERIOD OF PERFORMANCE EXTENSION. 2) UPDATE SECTION B CLIN CEILINGS AND VALUE. A) ADMINISTRATIVE UPDATE TO CLIN 0008 CEILING FROM A MOD 129 RED |
| Feb 26, 2025 | P00148 | $0 | PLEASE NOTE THAT PRISM MOD 148 IS LEIDOS MOD 149 A. CLIN 0020 PERIOD OF PERFORMANCE IS EXTENDED TO JUNE 29, 2025. B. SECTION F.2.2 BASE CLIN PERIODS OF PERFORMANCE IS CHANGED AS FOLLOWS: CHANGES TO SECTION F IN WILL BE REFLECTED IN THE NEXT UPDATE |
| Feb 25, 2025 | P00147 | $0 | PLEASE NOTE THAT PRISM MOD 147 IS LEIDOS MOD 149 CLIN 02-005AA 1) ALL PREVIOUSLY PLANNED CLIN 02-005AA WORK IN PROCESS (WIP) (E.G. REMAINING SOFTWARE DEVELOPMENT, IMPLEMENTATION, TEST ACTIVITIES AND PTR RESOLUTION) FOR BUILD 2.4 BEYOND JANUARY 3, 2 |
| Feb 18, 2025 | P00146 | $0 | PLEASE NOTE THAT PRISM MOD 146 IS LEIDOS MOD 148 REQUEST THE CONTINUANCE OF BI-WEEKLY TRAINING COURSE REVIEW MEETINGS (SECTION C.11.6.5.2 BI-WEEKLY REVIEWS) IN JANUARY 2025 THROUGH JUNE 30, 2025 AND UPDATE ATTACHMENT J-07 (WORK GROUP LISTING) ACCORD |
| Feb 14, 2025 | P00145 | $0 | PLEASE NOTE THAT PRISM MOD 145 IS LEIDOS MOD 147 UPDATE SECTION F TO AUTHORIZE THE EXTENSION TO THE PERIOD OF PERFORMANCE (POP) FOR CLIN 0004 FROM DECEMBER 31, 2024 TO MARCH 31, 2025. A. ALLOW TIME FOR THE FAA TO REVIEW THE CLIN 0004 ENGINEERING ST |
| Jan 24, 2025 | P00144 | $4.2M | THE PURPOSE OF THE MOD IS TO INCREASE THE COST AND FEE FOR CLIN 11D BUILD 2.3 FOR AN ADDITIONAL 350 SLOC AND TO UPDATE THE APPLICABLE SECTIONS OF THE CONTRACT. SECTION B COSTS FOR THIS CHANGE IN CLIN 11D IS REVISED AND INCREASED BY $1,596,784.87 AN |
| Nov 25, 2024 | P00143 | $0 | THE PURPOSE OF THE MOD IS TO INCREASE THE COST AND FEE FOR CLIN 11D BUILD 2.3 FOR AN ADDITIONAL 350 SLOC AND TO UPDATE THE APPLICABLE SECTIONS OF THE CONTRACT. SECTION B COSTS FOR THIS CHANGE IN CLIN 11D IS REVISED AND INCREASED BY $1,596,784.87 AN |
| Nov 21, 2024 | P00142 | $3.2M | THE PURPOSE OF THE MOD IS TO INCREASE THE COST AND FEE FOR CLIN 11D BUILD 2.3 FOR AN ADDITIONAL 350 SLOC AND TO UPDATE THE APPLICABLE SECTIONS OF THE CONTRACT. SECTION B COSTS FOR THIS CHANGE IN CLIN 11D IS REVISED AND INCREASED BY $1,596,784.87 AN |
| Nov 19, 2024 | P00141 | $2.0M | THE PURPOSE OF THE MOD IS TO INCREASE THE COST AND FEE FOR CLIN 11D BUILD 2.3 FOR AN ADDITIONAL 350 SLOC AND TO UPDATE THE APPLICABLE SECTIONS OF THE CONTRACT. SECTION B COSTS FOR THIS CHANGE IN CLIN 11D IS REVISED AND INCREASED BY $1,596,784.87 AN |
| Oct 14, 2024 | P00140 | $0 | REVISE COST FOR CLIN 04-001 |
| Sep 25, 2024 | P00139 | $10.5M | CLIN 0016 PERIOD OF PERFORMANCE EXTENSION |
| Sep 18, 2024 | P00138 | $2.2M | INCREASE THE COST AND FEE TO CLIN 0011D FOR ADDITIONAL 1,200 SLOC REQUIRED FOR BUILD 2.3 |
| Sep 17, 2024 | P00137 | $0 | MEMORIALIZE THE DEFINITIZATION OF CLIN 04-001 |
| Sep 13, 2024 | P00136 | $0 | UPDATE SECTION B TO COMBINE ALL COST AND FEE VALUES UNDER CLINS 02-005 AA AND AB INTO CLIN 02-005AA. |
| Sep 6, 2024 | P00135 | $0 | UPDATE SECTION B TO REDUCE CEILINGS OF SELECT EXPIRED UNEXECUTED CLINS AND OPTIONAL UNPRICED CEILING CLINS |
| Aug 21, 2024 | P00134 | $0 | MEMORIALIZE THE DEFINITIZED REQUIREMENTS AND COSTS IN RESPONSE TO THE BASELINE CHANGE DECISION (BCD) REQUEST FOR OFFER (RFO) |
| Aug 6, 2024 | P00133 | $0 | CLIN 0004 AND 0004A CHANGES |
| Jul 23, 2024 | P00132 | $10.7M | INCREMENTAL FUNDING |
| Jul 18, 2024 | P00131 | $0 | DEFINITIZE CHANGES TO CLINS 03-006 AND 04-002 |
| Jul 15, 2024 | P00130 | $0 | UPDATE SECTIONS B AND G |
| Jul 3, 2024 | P00129 | $0 | UPDATE SECTIONS B AND G |
| Jun 17, 2024 | P00128 | $562.5K | ADD INCREMENTAL FUNDING |
| Jun 4, 2024 | P00127 | $0 | REVISE SECTION B TO ADD CLIN 0011D COST |
| Jun 3, 2024 | P00126 | $314.0K | ADD FUNDING |
| May 14, 2024 | P00125 | $4.4M | ADD FUNDING |
| May 10, 2024 | P00124 | $0 | CHANGE SCHEDULE DATES FOR THE UPCOMING PRODUCTION ACCEPTANCE TEST (PAT) |
| Apr 11, 2024 | P00123 | $0 | AUTHORIZE LEIDOS TO BEGIN TRAINING WORKGROUP MEETINGS UNDER CLIN 11D |
| Apr 2, 2024 | P00122 | $0 | REVISE SCHEDULE OF WORK, SECTION B AND SECTION F |
| Mar 15, 2024 | P00119 | $0 | THE PURPOSE OF THIS CHANGE ORDER MODIFICATION IS TO AUTHORIZE LEIDOS TO BEGIN ALL EFFORTS WITH RESPECT TO THE ADDITIONAL REQUIREMENTS FOR CLIN 0011D (TITLED FUTURE ENHANCEMENTS BUILD 1.5, 2.2, 2.3) OUTLINED IN THE ATTACHED SOW. CONTRACTOR SHALL SEGRE |
| Mar 15, 2024 | P00120 | $5.4M | FUNDING MODIFICATION |
| Mar 15, 2024 | P00121 | $622.0K | FUNDING MODIFICATION |
| Mar 5, 2024 | P00118 | $0 | MAKE CHANGES TO CLIN 02001 FEE AND CLIN 0020 |
| Mar 1, 2024 | P00117 | $940.0K | MAKE CHANGES TO CLIN 0020 AND ADD FUNDING |
| Feb 22, 2024 | P00116 | $0 | MAKE CHANGES TO CLIN 0007D |
| Dec 22, 2023 | P00115 | $4.2M | MAKE CHANGES TO CLINS 02-004A, 0008 AND 0020 |
| Dec 14, 2023 | P00114 | $75.0K | MAKE CHANGES TO CLINS 01-001, 0007A, 0008A, 0008, 0017, 03-002 AND 03-002A |
| Sep 18, 2023 | P00113 | $280.0K | MAKE CHANGES TO CLIN 0003, 0003B, 03-002 |
| Sep 9, 2023 | P00112 | $8.6M | PROVIDE INCREMENTAL FUNDING |
| Sep 8, 2023 | P00111 | $1.0M | PROVIDE INCREMENTAL FUNDING |
| Sep 7, 2023 | P00110 | $0 | THE EXTENSION OF 2.3 TRR TO JULY WAS DRIVEN BY THE GOVERNMENT ADDITION OF REQUIREMENTS AND THE PREDECESSOR BUILD 2.2 SCHEDULE DELAY. |
| Sep 5, 2023 | P00109 | $0 | EXECUTE ADMINISTRATIVE CHANGES TO SECTION B |
| Aug 17, 2023 | P00107 | $0 | PROVIDE INCREMENTAL FUNDING TO CONTINUE SERVICES |
| Aug 9, 2023 | P00108 | $22.6K | PROVIDE INCREMENTAL FUNDING TO CONTINUE SERVICES |
| Jul 12, 2023 | P00106 | $543.7K | PROVIDE INCREMENTAL FUNDING TO CONTINUE SERVICES |
| Jul 11, 2023 | P00105 | $975.0K | PROVIDE INCREMENTAL FUNDING TO CONTINUE SERVICES |
| Jul 7, 2023 | P00104 | $794.0K | PROVIDE INCREMENTAL FUNDING TO CONTINUE SERVICES |
| Jun 28, 2023 | P00103 | $6.2M | PROVIDE INCREMENTAL FUNDING TO CONTINUE SERVICES |
| Jun 21, 2023 | P00102 | $715.0K | SOFTWARE DEVELOPMENT |
| Jun 8, 2023 | P00101 | $105.0K | TERMINAL FLIGHT DATA MANAGER - ADDED CLIN0007D |
| May 23, 2023 | P00100 | $0 | TERMINAL FLIGHT DATA MANAGER - SECTION J UPDATES |
| May 12, 2023 | P00099 | $0 | TERMINAL FLIGHT DATA MANAGER - SECTION J UPDATES |
| Apr 19, 2023 | P00098 | $3.3M | TERMINAL FLIGHT DATA MANAGER - BUILD 1 QUALITY INCENTIVE FEE PAYMENT |
| Apr 17, 2023 | P00097 | $67.0K | TERMINAL FLIGHT DATA MANAGER |
| Mar 23, 2023 | P00096 | $450.0K | TERMINAL FLIGHT DATA MANAGER |
| Mar 20, 2023 | P00095 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Feb 27, 2023 | P00094 | $12.7M | TERMINAL FLIGHT DATA MANAGER |
| Feb 23, 2023 | P00093 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Feb 21, 2023 | P00092 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Feb 2, 2023 | P00091 | $382.6K | TERMINAL FLIGHT DATA MANAGER |
| Jan 20, 2023 | P00090 | $4.4M | TERMINAL FLIGHT DATA MANAGER |
| Dec 19, 2022 | P00089 | $517.6K | TERMINAL FLIGHT DATA MANAGER |
| Dec 8, 2022 | P00088 | $2.3M | TERMINAL FLIGHT DATA MANAGER |
| Dec 5, 2022 | P00086 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Dec 5, 2022 | P00087 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Oct 20, 2022 | P00085 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Sep 12, 2022 | P00084 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Aug 23, 2022 | P00083 | $10.9M | TERMINAL FLIGHT DATA MANAGER |
| Jul 28, 2022 | P00081 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jul 28, 2022 | P00082 | $248.5K | TERMINAL FLIGHT DATA MANAGER |
| Jul 27, 2022 | P00080 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jul 21, 2022 | P00079 | $850.0K | TERMINAL FLIGHT DATA MANAGER |
| Jul 20, 2022 | P00077 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jul 20, 2022 | P00078 | $10.9M | TERMINAL FLIGHT DATA MANAGER |
| Jul 18, 2022 | P00075 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jul 18, 2022 | P00076 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jul 14, 2022 | P00074 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jul 13, 2022 | P00073 | $0 | TERMINAL FLIGHT DATA MANAGER |
| May 9, 2022 | P00072 | $930.0K | TERMINAL FLIGHT DATA MANAGER |
| May 5, 2022 | P00071 | $371.0K | TERMINAL FLIGHT DATA MANAGER |
| Apr 21, 2022 | P00070 | $11.0M | TERMINAL FLIGHT DATA MANAGER |
| Mar 23, 2022 | P00068 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Feb 21, 2022 | P00069 | $6.7M | TERMINAL FLIGHT DATA MANAGER |
| Dec 13, 2021 | P00067 | $6.5M | TERMINAL FLIGHT DATA MANAGER |
| Dec 9, 2021 | P00066 | $2.1M | TERMINAL FLIGHT DATA MANAGER |
| Dec 6, 2021 | P00065 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Dec 3, 2021 | P00064 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Sep 27, 2021 | P00063 | $25.0K | TERMINAL FLIGHT DATA MANAGER |
| Sep 20, 2021 | P00062 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Sep 18, 2021 | P00061 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Aug 26, 2021 | P00060 | $10.3M | TERMINAL FLIGHT DATA MANAGER |
| Jul 28, 2021 | P00059 | $965.3K | TERMINAL FLIGHT DATA MANAGER |
| Jul 6, 2021 | P00058 | $2.7M | TERMINAL FLIGHT DATA MANAGER |
| Jun 10, 2021 | P00057 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jun 3, 2021 | P00056 | $10.0M | TERMINAL FLIGHT DATA MANAGER |
| Mar 22, 2021 | P00055 | $12.5M | TERMINAL FLIGHT DATA MANAGER |
| Mar 19, 2021 | P00053 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Mar 19, 2021 | P00054 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Feb 16, 2021 | P00052 | $3.1M | TERMINAL FLIGHT DATA MANAGER |
| Jan 6, 2021 | P00050 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Jan 6, 2021 | P00051 | $8.2M | TERMINAL FLIGHT DATA MANAGER |
| Nov 29, 2020 | P00049 | $2.3M | TERMINAL FLIGHT DATA MANAGER |
| Oct 20, 2020 | P00048 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Aug 29, 2020 | P00046 | $4.9M | TERMINAL FLIGHT DATA MANAGER |
| Aug 19, 2020 | P00045 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Aug 17, 2020 | P00043 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Aug 17, 2020 | P00044 | $9.8M | TERMINAL FLIGHT DATA MANAGER |
| Aug 4, 2020 | P00042 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Apr 29, 2020 | P00041 | $5.0M | TERMINAL FLIGHT DATA MANAGER |
| Apr 28, 2020 | P00040 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Mar 23, 2020 | P00039 | $33.0M | TERMINAL FLIGHT DATA MANAGER |
| Feb 17, 2020 | P00038 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Dec 30, 2019 | P00037 | $13.6M | TERMINAL FLIGHT DATA MANAGER |
| Nov 22, 2019 | P00036 | $4.2M | TERMINAL FLIGHT DATA MANAGER |
| Sep 16, 2019 | P00034 | $0 | TERMINAL FLIGHT DATA MANAGER |
| Sep 16, 2019 | P00035 | $1.6M | TERMINAL FLIGHT DATA MANAGER |
| Aug 9, 2019 | P00033 | $7.8M | TERMINAL FLIGHT DATA MANAGER |
| Jul 9, 2019 | P00032 | $21.0M | TERMINAL FLIGHT DATA MANAGER |
| May 16, 2019 | P00031 | $11.2M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Apr 10, 2019 | P00030 | $4.6M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Apr 5, 2019 | P00029 | $0 | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Feb 20, 2019 | P00028 | $10.6M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Dec 12, 2018 | P00027 | $12.0M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Nov 9, 2018 | P00026 | $6.7M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Sep 17, 2018 | P00025 | $38.0K | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Aug 13, 2018 | P00024 | $400.0K | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Jul 13, 2018 | P00023 | $22.3M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Jul 6, 2018 | P00022 | $0 | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Jun 20, 2018 | P00021 | $9.3M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Apr 26, 2018 | P00020 | $1.8M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Apr 19, 2018 | P00019 | $353.6K | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Mar 13, 2018 | P00018 | $7.1M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Mar 12, 2018 | P00017 | $0 | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Jan 19, 2018 | P00016 | $3.3M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Dec 7, 2017 | P00015 | $2.0M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Dec 4, 2017 | P00014 | $6.3M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Oct 24, 2017 | P00013 | $10.0M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Sep 7, 2017 | 12 | $7.8M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Jul 7, 2017 | 11 | $13.7M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| May 17, 2017 | 10 | $3.5M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Mar 13, 2017 | 9 | $1.7M | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
| Feb 21, 2017 | 8 | $0 | IGF::OT::IGF TERMINAL FLIGHT DATA MANAGER |
Estimated positioning window
Jun 29, 2027 – Dec 29, 2027
60/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 60/100. Available recorded signals: 55 points.
- Contract end 2028-06-29 (606 days from calculation)
- +25 points
- 20 historical awards in this buyer and category group
- +15 points
- 204 recorded award transactions
- +10 points
- Latest award action: 2026-09-02
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.