Federal contract award
EHP4
IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NSWC CARDEROCK |
| NAICS | 541330 — Engineering Services |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | N0017804D4027 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $7.8M |
| Current contract value | $4.2M |
| Potential contract value / ceiling | $0 |
| Start date | Mar 14, 2013 |
| Current end date | May 29, 2015 |
| Potential end date | May 29, 2015 |
| Latest award activity | Oct 16, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 76 of 76 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Oct 16, 2025 | 42 | $0 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 16, 2025 | 41 | $-1.1M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 16, 2025 | 41 | $-54.7K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 16, 2025 | 41 | $-7.1M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 13, 2019 | 40 | $-346 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 22, 2018 | 1C | $-746.3K | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| May 27, 2015 | 39 | $0 | IGF::OT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| May 26, 2015 | 38 | $0 | IGF::OT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Apr 21, 2015 | 1A | $-65.5K | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 13, 2015 | 37 | $0 | IGF::OT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Nov 10, 2014 | 36 | $7.0K | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Nov 10, 2014 | 36 | $157.0K | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Oct 21, 2014 | 35 | $0 | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 15, 2014 | 34 | $110.5K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 15, 2014 | 34 | $33.8K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 15, 2014 | 34 | $782.1K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 7, 2014 | 33 | $-1.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 7, 2014 | 33 | $-787.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 4, 2014 | 32 | $763.9K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 4, 2014 | 32 | $1.5M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jul 29, 2014 | 31 | $64.8K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jul 29, 2014 | 31 | $490.6K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jul 18, 2014 | 30 | $-1.2K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jul 18, 2014 | 30 | $-890.8K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jun 27, 2014 | 29 | $9.2K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jun 27, 2014 | 29 | $167.1K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| May 20, 2014 | 28 | $7.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| May 20, 2014 | 28 | $-7.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| May 9, 2014 | 27 | $1.6M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| May 9, 2014 | 27 | $143.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Apr 17, 2014 | 26 | $15.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Apr 17, 2014 | 26 | $300.4K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Apr 17, 2014 | 26 | $343.6K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 27, 2014 | 25 | $18.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 27, 2014 | 25 | $130.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 27, 2014 | 25 | $255.2K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Feb 24, 2014 | 24 | $10.3K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Feb 24, 2014 | 24 | $881.6K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Feb 5, 2014 | 23 | $12.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Feb 5, 2014 | 23 | $125.4K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jan 17, 2014 | 22 | $21.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jan 17, 2014 | 22 | $299.6K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Dec 19, 2013 | 21 | $55.5K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Dec 19, 2013 | 21 | $209.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Dec 19, 2013 | 21 | $632.4K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Dec 10, 2013 | 20 | $0 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Nov 21, 2013 | 19 | $8.5K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Nov 21, 2013 | 19 | $158.6K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Nov 13, 2013 | 18 | $32.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Nov 13, 2013 | 18 | $120.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 26, 2013 | 17 | $0 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 17, 2013 | 16 | $0 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 11, 2013 | 15 | $85.5K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 11, 2013 | 15 | $1.5M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 5, 2013 | 14 | $619.3K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 5, 2013 | 14 | $23.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Sep 5, 2013 | 14 | $3.8M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 28, 2013 | 13 | $0 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. IGF:CT:IGF |
| Aug 27, 2013 | 12 | $691.6K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 27, 2013 | 12 | $300.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 27, 2013 | 12 | $5.3M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 26, 2013 | 11 | $0 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Aug 14, 2013 | 10 | $2.7M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jul 31, 2013 | 9 | $1.5M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jun 24, 2013 | 8 | $356.5K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jun 19, 2013 | 7 | $1.9M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Jun 7, 2013 | 6 | $2.2M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| May 21, 2013 | 5 | $2.2M | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. IGF::CT::IGF |
| May 17, 2013 | 4 | $739.8K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Apr 8, 2013 | 3 | $0 | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 26, 2013 | 2 | $149.0K | CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 21, 2013 | 1 | $0 | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 14, 2013 | 0 | $1.8M | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 14, 2013 | 0 | $0 | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 14, 2013 | 0 | $0 | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |
| Mar 14, 2013 | 0 | $0 | IGF::CT::IGF CONTRACTOR SUPPORT FOR THE ACQUISITION OF ENGINEERING AND MARINE SERVICES IN SUPPORT OF THE CCD MISSION COVERING THE FUNCTIONAL AREAS OF PROGRAM MANAGEMENT, PLANNING, ACQUISITION ENGINEERING, IN-SERVICE ENGINEERING, AND LIFE CYCLE MANAGEMENT. |