Federal contract award

FA251724F0125

PROVIDE ALL LABOR AND MATERIALS NEEDED TO DEMOLISH, DISPOSE OF, AND REPLACE VARIOUS HVAC EQUIPMENT IN TWO MECHANICAL ROOMS IN BUILDING 890: 1 BOILER, 1 CHILLER, 1 CONDENSING UNIT, 1 AIR HANDLER DIRECT EXPANSION (DX) COIL AND 4 CIRCULATING PUMPS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA2517 21 CONS BLDG 350
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleFA251720D0004
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$485.1K
Current contract value$485.1K
Potential contract value / ceiling$485.1K
Start dateSep 30, 2024
Current end dateSep 19, 2025
Potential end dateSep 19, 2025
Latest award activitySep 30, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 30, 2025P00004$0PROVIDE ALL LABOR AND MATERIALS NEEDED TO DEMOLISH, DISPOSE OF, AND REPLACE VARIOUS HVAC EQUIPMENT IN TWO MECHANICAL ROOMS IN BUILDING 890: 1 BOILER, 1 CHILLER, 1 CONDENSING UNIT, 1 AIR HANDLER DIRECT EXPANSION (DX) COIL AND 4 CIRCULATING PUMPS.
Aug 25, 2025P00003$0PROVIDE ALL LABOR AND MATERIALS NEEDED TO DEMOLISH, DISPOSE OF, AND REPLACE VARIOUS HVAC EQUIPMENT IN TWO MECHANICAL ROOMS IN BUILDING 890: 1 BOILER, 1 CHILLER, 1 CONDENSING UNIT, 1 AIR HANDLER DIRECT EXPANSION (DX) COIL AND 4 CIRCULATING PUMPS.
Jul 10, 2025P00002$0PROVIDE ALL LABOR AND MATERIALS NEEDED TO DEMOLISH, DISPOSE OF, AND REPLACE VARIOUS HVAC EQUIPMENT IN TWO MECHANICAL ROOMS IN BUILDING 890: 1 BOILER, 1 CHILLER, 1 CONDENSING UNIT, 1 AIR HANDLER DIRECT EXPANSION (DX) COIL AND 4 CIRCULATING PUMPS.
Jun 6, 2025P00001$0PROVIDE ALL LABOR AND MATERIALS NEEDED TO DEMOLISH, DISPOSE OF, AND REPLACE VARIOUS HVAC EQUIPMENT IN TWO MECHANICAL ROOMS IN BUILDING 890: 1 BOILER, 1 CHILLER, 1 CONDENSING UNIT, 1 AIR HANDLER DIRECT EXPANSION (DX) COIL AND 4 CIRCULATING PUMPS.