Federal contract award
FA252122F0081
REPAIR GENERATOR SYSTEMS, COMM/OPS FACILITY, ASCENSION AUXILIARY AIRFIELD, SOUTH ATLANTIC
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA2521 45 CONS PK |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2BG — REPAIR OR ALTERATION OF ELECTRONIC AND COMMUNICATIONS FACILITIES |
| Parent award / vehicle | FA252120D0003 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $996.4K |
| Current contract value | $996.4K |
| Potential contract value / ceiling | $996.4K |
| Start date | Mar 4, 2022 |
| Current end date | Mar 25, 2026 |
| Potential end date | Mar 25, 2026 |
| Latest award activity | Mar 25, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 25, 2026 | P00009 | $-3.0K | REPLACE TWO EXISTING 100KW GENERATORS WITH NEW 80KW GENERATOR, GEN-C, FOR CRITICAL LOADS AND 125KW GENERATOR,GEN-I, FOR INDUSTRIAL LOADS. THE NEW GENERATORS WILL INCLUDE 24-HOUR SUB-BASE TANKS AND WEATHER RATED ENCLOSURES. COMM OPS FACILITY, AAAF |
| Aug 27, 2025 | P00008 | $0 | REPLACE TWO EXISTING 100KW GENERATORS WITH NEW 80KW GENERATOR, GEN-C, FOR CRITICAL LOADS AND 125KW GENERATOR,GEN-I, FOR INDUSTRIAL LOADS. THE NEW GENERATORS WILL INCLUDE 24-HOUR SUB-BASE TANKS AND WEATHER RATED ENCLOSURES. COMM OPS FACILITY, AAAF |
| Jul 22, 2025 | P00007 | $0 | REPLACE TWO EXISTING 100KW GENERATORS WITH NEW 80KW GENERATOR, GEN-C, FOR CRITICAL LOADS AND 125KW GENERATOR,GEN-I, FOR INDUSTRIAL LOADS. THE NEW GENERATORS WILL INCLUDE 24-HOUR SUB-BASE TANKS AND WEATHER RATED ENCLOSURES. COMM OPS FACILITY, AAAF |
| May 30, 2025 | P00006 | $0 | REPLACE TWO EXISTING 100KW GENERATORS WITH NEW 80KW GENERATOR, GEN-C, FOR CRITICAL LOADS AND 125KW GENERATOR,GEN-I, FOR INDUSTRIAL LOADS. THE NEW GENERATORS WILL INCLUDE 24-HOUR SUB-BASE TANKS AND WEATHER RATED ENCLOSURES. COMM OPS FACILITY, AAAF |
| Jan 16, 2025 | P00005 | $0 | REPLACE TWO EXISTING 100KW GENERATORS WITH NEW 80KW GENERATOR, GEN-C, FOR CRITICAL LOADS AND 125KW GENERATOR,GEN-I, FOR INDUSTRIAL LOADS. THE NEW GENERATORS WILL INCLUDE 24-HOUR SUB-BASE TANKS AND WEATHER RATED ENCLOSURES. COMM OPS FACILITY, AAAF |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.