Federal contract award
FA252125F0171
SCOPE OF WORK IS TO DEVELOP DBEH 17-1581, (SPOTFI) RENOVATE HANGAR D DESIGN. SUBMIT DESIGN DRAWINGS, DESIGN ANALYSIS, CONSTRUCTION ESTIMATE, SPECIFICATIONS, A DRAFT STATEMENT OF WORK, AND DD1354. THE PERIOD OF PERFORMANCE IS 214 DAYS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA2521 45 CONS PK |
| NAICS | 541330 — Engineering Services |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | FA252124D0002 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $699.0K |
| Current contract value | $699.0K |
| Potential contract value / ceiling | $699.0K |
| Start date | Apr 24, 2025 |
| Current end date | Jan 26, 2026 |
| Potential end date | Jan 26, 2026 |
| Latest award activity | Dec 5, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 5, 2025 | P00002 | $0 | SCOPE OF WORK IS TO DEVELOP RENOVATE HANGAR DESIGN AT CAPE CANAVERAL SPACE FORCE STATION FLORIDA |
| Sep 30, 2025 | P00001 | $0 | RENOVATE HANGAR D DESIGN AT CAPE CANAVERAL FLORIDA |
| Apr 23, 2025 | 0 | $699.0K | SCOPE OF WORK IS TO DEVELOP DBEH 17-1581, (SPOTFI) RENOVATE HANGAR D DESIGN. SUBMIT DESIGN DRAWINGS, DESIGN ANALYSIS, CONSTRUCTION ESTIMATE, SPECIFICATIONS, A DRAFT STATEMENT OF WORK, AND DD1354. THE PERIOD OF PERFORMANCE IS 214 DAYS. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.