Federal contract award

FA252125F0263

DBEH 211553 RENOVATE HANGER AF B66250; DEVELOP DRAWINGS TO A 100 PERCENT CONSTRUCTIBLE DESIGN. DESIGN SHALL PROVIDE A FACILITY THAT IS MAINTAINABLE TO CURRENT FACILITY STANDARDS. WORK INCLUDES SCOPE DEVELOPMENT, DESIGN PER SOW V4 DATED 9 JULY 2025.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA2521 45 CONS PK
NAICS541330 — Engineering Services
PSCC219 — Other Architect and Engineering Services
Parent award / vehicleFA890321D0036
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.1M
Current contract value$2.1M
Potential contract value / ceiling$2.1M
Start dateAug 11, 2025
Current end dateMay 30, 2026
Potential end dateMay 30, 2026
Latest award activityApr 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 14, 2026P00002$56.4KRENOVATE HANGER AF DEVELOP DRAWINGS TO A 100 PERCENT CONSTRUCTIBLE DESIGN. DESIGN SHALL PROVIDE A FACILITY THAT IS MAINTAINABLE TO CURRENT FACILITY STANDARDS. WORK INCLUDES SCOPE DEVELOPMENT, DESIGN PER SOW V4 DATED 9 JULY 2025.
Mar 11, 2026P00001$0DBEH 211553 RENOVATE HANGER AF B66250; DEVELOP DRAWINGS TO A 100 PERCENT CONSTRUCTIBLE DESIGN. DESIGN SHALL PROVIDE A FACILITY THAT IS MAINTAINABLE TO CURRENT FACILITY STANDARDS. WORK INCLUDES SCOPE DEVELOPMENT, DESIGN PER SOW V4 DATED 9 JULY 2025.
Aug 8, 20250$2.0MDBEH 211553 RENOVATE HANGER AF B66250; DEVELOP DRAWINGS TO A 100 PERCENT CONSTRUCTIBLE DESIGN. DESIGN SHALL PROVIDE A FACILITY THAT IS MAINTAINABLE TO CURRENT FACILITY STANDARDS. WORK INCLUDES SCOPE DEVELOPMENT, DESIGN PER SOW V4 DATED 9 JULY 2025.