Federal contract award

FA254322F0011

OUTFALL TWO RESTORATION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA2543 460 CONS
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleFA255019DA006
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$2.0M
Current contract value$2.0M
Potential contract value / ceiling$2.4M
Start dateMar 28, 2022
Current end dateSep 1, 2026
Potential end dateSep 1, 2026
Latest award activityMar 17, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 17, 2026P00008$0THE NEW OUTFALL 2 DESIGN IS TO REDUCE THE DISCHARGE OF POLLUTANTS INTO ETGC AND COMPLY WITH BUCKLEYS MS4 PERMIT AND COLORADOS ANTI DEGRADATION POLICY FOR WATER QUALITY STANDARDS. REFER TO STATEMENT OF WORK (SOW) REVISION TWO (REV2) DATE 18 MAR 2024.
May 23, 2025P00007$0THE NEW OUTFALL 2 DESIGN IS TO REDUCE THE DISCHARGE OF POLLUTANTS INTO ETGC AND COMPLY WITH BUCKLEYS MS4 PERMIT AND COLORADOS ANTI DEGRADATION POLICY FOR WATER QUALITY STANDARDS. REFER TO STATEMENT OF WORK (SOW) REVISION TWO (REV2) DATE 18 MAR 2024.
Nov 21, 2024P00006$0THE NEW OUTFALL 2 DESIGN IS TO REDUCE THE DISCHARGE OF POLLUTANTS INTO ETGC AND COMPLY WITH BUCKLEYS MS4 PERMIT AND COLORADOS ANTI DEGRADATION POLICY FOR WATER QUALITY STANDARDS. REFER TO STATEMENT OF WORK (SOW) REVISION TWO (REV2) DATE 18 MAR 2024.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.