Federal contract award

FA254323F0022

MILL AND OVERLAY BASEWIDE II

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA2543 460 CONS
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleFA255019DA005
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$6.6M
Current contract value$6.6M
Potential contract value / ceiling$6.6M
Start dateNov 1, 2023
Current end dateJul 14, 2026
Potential end dateJul 14, 2026
Latest award activitySep 26, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 26, 2025P00008$2.1M58 MXS REQUIRES SUPPLY AND INSTALLATION OF HYDRO ENGINEERING SIDE WALLS, GUTTER SIDE WALLS, AND BOLT KIT TO COMPLETE THEIR OUTDOOR WASH RACK ASSEMBLY.
Sep 24, 2025P00007$1.5MTHE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
Aug 28, 2025P00006$0THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
Jul 14, 2025P00005$0THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
May 19, 2025P00004$37.2KTHE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
Apr 18, 2025P00003$200.8KTHE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
Dec 26, 2024P00002$123.8KTHE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
Oct 24, 2024P00001$0THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S