Federal contract award
FA283523C0001
THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA2835 AFLCMC HANSCOM PZI |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2EZ — REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $30.8M |
| Current contract value | $30.8M |
| Potential contract value / ceiling | $30.8M |
| Start date | Nov 8, 2022 |
| Current end date | Feb 11, 2027 |
| Potential end date | Feb 11, 2027 |
| Latest award activity | Apr 21, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 21, 2026 | P00008 | $189.8K | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
| Sep 16, 2025 | P00007 | $499.0K | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
| Jun 25, 2025 | P00006 | $117.5K | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
| Apr 25, 2025 | P00005 | $71.5K | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
| Jan 8, 2025 | P00004 | $-8.0K | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
| Nov 26, 2024 | P00003 | $220.0K | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
| Nov 20, 2024 | P00002 | $15.8K | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
| Mar 5, 2024 | P00001 | $-109.8K | REPAIR (SUSTAIN) CENTRAL STEAM PLANT, HANSCOM AIR FORCE BASE, MA |
| Nov 8, 2022 | 0 | $29.8M | THE PROJECT ENTAILS THE REPLACEMENT OF MAJOR COMPONENTS AT THE CENTRAL PLANT TO INCLUDE A BOILER, CHILLER, GENERATOR, AND CONTROLS AT B1201.THERE WILL ALSO BE THE ADDITION OF CATWALKS AND RENOVATIONS OF THE RESTROOMS ALONG WITH A BREAKROOM. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-02-11 (109 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 9 recorded award transactions
- +10 points
- Latest award action: 2026-04-21
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.