Federal contract award

FA301623F0366

THIS IS A DESIGN-BUILD PROJECT, AND THE INTENT OF THIS PROJECT IS TO REPAIR THE FIRE SUPPRESSION SYSTEM OF BUILDING 903 ON JBSA-RANDOLPH AND REMEDY THE FIRE SAFETY DEFICIENCY (FSD)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA3016 502 CONS CL
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleFA301622D0019
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$433.6K
Current contract value$433.6K
Potential contract value / ceiling$433.6K
Start dateOct 9, 2023
Current end dateOct 10, 2025
Potential end dateOct 10, 2025
Latest award activityFeb 5, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 5, 2026P00007$-596REPAIR THE FIRE SUPPRESSION SYSTEM IN BUILDING 903 AND REMEDY THE FIRE SAFETY DEFICIENCY (FSD) RATING THAT STATES: ALL OF THE COMPONENTS FOR THE FIRE SUPPRESSION WET PIPE SPRINKLER SYSTEM (I.E., FIRE PUMP, JOCKEY PUMP, AND THE ELECTRIC FIRE PUMP CONT
Sep 22, 2025P00006$0REPAIR THE FIRE SUPPRESSION SYSTEM IN BUILDING 903 AND REMEDY THE FIRE SAFETY DEFICIENCY (FSD) RATING THAT STATES: ALL OF THE COMPONENTS FOR THE FIRE SUPPRESSION WET PIPE SPRINKLER SYSTEM (I.E., FIRE PUMP, JOCKEY PUMP, AND THE ELECTRIC FIRE PUMP CONT
Apr 17, 2025P00005$0REPAIR THE FIRE SUPPRESSION SYSTEM IN BUILDING 903 AND REMEDY THE FIRE SAFETY DEFICIENCY (FSD) RATING THAT STATES: ALL OF THE COMPONENTS FOR THE FIRE SUPPRESSION WET PIPE SPRINKLER SYSTEM (I.E., FIRE PUMP, JOCKEY PUMP, AND THE ELECTRIC FIRE PUMP CONT
Mar 12, 2025P00004$0REPAIR THE FIRE SUPPRESSION SYSTEM IN BUILDING 903 AND REMEDY THE FIRE SAFETY DEFICIENCY (FSD) RATING THAT STATES: ALL OF THE COMPONENTS FOR THE FIRE SUPPRESSION WET PIPE SPRINKLER SYSTEM (I.E., FIRE PUMP, JOCKEY PUMP, AND THE ELECTRIC FIRE PUMP CONT
Jan 7, 2025P00003$0REPAIR THE FIRE SUPPRESSION SYSTEM IN BUILDING 903 AND REMEDY THE FIRE SAFETY DEFICIENCY (FSD) RATING THAT STATES: ALL OF THE COMPONENTS FOR THE FIRE SUPPRESSION WET PIPE SPRINKLER SYSTEM (I.E., FIRE PUMP, JOCKEY PUMP, AND THE ELECTRIC FIRE PUMP CONT
Oct 31, 2024P00002$0REPAIR THE FIRE SUPPRESSION SYSTEM IN BUILDING 903 AND REMEDY THE FIRE SAFETY DEFICIENCY (FSD) RATING THAT STATES: ALL OF THE COMPONENTS FOR THE FIRE SUPPRESSION WET PIPE SPRINKLER SYSTEM (I.E., FIRE PUMP, JOCKEY PUMP, AND THE ELECTRIC FIRE PUMP CONT

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.