Federal contract award

FA301624F0459

THE SCOPE OF DESIGN PROJECT IS TO COMPLETE100% DESIGN FOR CONSTRUCTION PACKAGE TO INSTALL A SECTION OF THE CHILLED WATER LOOP (CWL) JOINING THE EAST/WEST-SIDE RANDOLPH SECTIONS INTO ONE CWL. THE SECTION WILL BE FROM BLDG 496 CW PLANT TO BLDG 100.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA3016 502 CONS CL
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleFA301620D0017
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$649.3K
Current contract value$649.3K
Potential contract value / ceiling$649.3K
Start dateSep 30, 2024
Current end dateJan 28, 2026
Potential end dateJan 28, 2026
Latest award activityDec 19, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 19, 2025P00004$0THE SCOPE OF DESIGN PROJECT IS TO COMPLETE100% DESIGN FOR CONSTRUCTION PACKAGE TO INSTALL A SECTION OF THE CHILLED WATER LOOP (CWL) JOINING THE EAST/WEST-SIDE RANDOLPH SECTIONS INTO ONE CWL. THE SECTION WILL BE FROM BLDG 496 CW PLANT TO BLDG 100.
Sep 29, 2025P00003$0THE SCOPE OF DESIGN PROJECT IS TO COMPLETE100% DESIGN FOR CONSTRUCTION PACKAGE TO INSTALL A SECTION OF THE CHILLED WATER LOOP (CWL) JOINING THE EAST/WEST-SIDE RANDOLPH SECTIONS INTO ONE CWL. THE SECTION WILL BE FROM BLDG 496 CW PLANT TO BLDG 100.
Jun 2, 2025P00002$0THE SCOPE OF DESIGN PROJECT IS TO COMPLETE100% DESIGN FOR CONSTRUCTION PACKAGE TO INSTALL A SECTION OF THE CHILLED WATER LOOP (CWL) JOINING THE EAST/WEST-SIDE RANDOLPH SECTIONS INTO ONE CWL. THE SECTION WILL BE FROM BLDG 496 CW PLANT TO BLDG 100.
Nov 21, 2024P00001$0THE SCOPE OF DESIGN PROJECT IS TO COMPLETE100% DESIGN FOR CONSTRUCTION PACKAGE TO INSTALL A SECTION OF THE CHILLED WATER LOOP (CWL) JOINING THE EAST/WEST-SIDE RANDOLPH SECTIONS INTO ONE CWL. THE SECTION WILL BE FROM BLDG 496 CW PLANT TO BLDG 100.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.