Federal contract award

FA309925F0007

THE PURPOSE OF THIS PROJECT IS TO PREPARE BUILDING 307 (B307) FOR THE 87TH FLYING TRAINING SQUADRON. THE SCOPE INCLUDES REPAINTING INTERIOR WALLS, REPLACING FLOORING, DEMOLISHING TWO INTERIOR WALLS, AND INSTALLING A SINK WITH SHELVING IN B307.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA3099 47 CONF CC
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleFA309923D0001
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$470.3K
Current contract value$470.3K
Potential contract value / ceiling$470.3K
Start dateJul 10, 2025
Current end dateNov 28, 2025
Potential end dateNov 28, 2025
Latest award activitySep 26, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 26, 2025P00002$18.0KTHE PURPOSE OF THIS PROJECT IS TO PREPARE BUILDING 307 (B307) FOR THE 87TH FLYING TRAINING SQUADRON. THE SCOPE INCLUDES REPAINTING INTERIOR WALLS, REPLACING FLOORING, DEMOLISHING TWO INTERIOR WALLS, AND INSTALLING A SINK WITH SHELVING IN B307.
Aug 25, 2025P00001$0THE PURPOSE OF THIS PROJECT IS TO PREPARE BUILDING 307 (B307) FOR THE 87TH FLYING TRAINING SQUADRON. THE SCOPE INCLUDES REPAINTING INTERIOR WALLS, REPLACING FLOORING, DEMOLISHING TWO INTERIOR WALLS, AND INSTALLING A SINK WITH SHELVING IN B307.
Jul 3, 20250$452.2KTHE PURPOSE OF THIS PROJECT IS TO PREPARE BUILDING 307 (B307) FOR THE 87TH FLYING TRAINING SQUADRON. THE SCOPE INCLUDES REPAINTING INTERIOR WALLS, REPLACING FLOORING, DEMOLISHING TWO INTERIOR WALLS, AND INSTALLING A SINK WITH SHELVING IN B307.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.