Federal contract award

FA441723C0014

ADD/ALTR 8 SOS BLDG.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4417 1 SOCONS
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideWOMEN OWNED SMALL BUSINESS
Pricing typeFIRM FIXED PRICE
Obligations$950.5K
Current contract value$950.5K
Potential contract value / ceiling$950.5K
Start dateSep 20, 2023
Current end dateFeb 21, 2025
Potential end dateFeb 21, 2025
Latest award activityFeb 18, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 18, 2026P00005$-527.7KTHE WORK INCLUDES MINOR DEMOLITION AND NEW CONSTRUCTION FOR AN ADDITION TO THE 8 SOS BUILDING 90145. THE ADDITION IS A ONE STORY, SLAB ON GRADE WITH SCORED, SPLIT FACES LOW AND END WALLS MATCHING THE EXISTING BUILDING ON A PRE-ENGINEERED METAL BUILDI
Dec 30, 2025P00004$0THE WORK INCLUDES MINOR DEMOLITION AND NEW CONSTRUCTION FOR AN ADDITION TO THE 8 SOS BUILDING 90145. THE ADDITION IS A ONE STORY, SLAB ON GRADE WITH SCORED, SPLIT FACES LOW AND END WALLS MATCHING THE EXISTING BUILDING ON A PRE-ENGINEERED METAL BUILDI
Feb 21, 2025P00003$0THE WORK INCLUDES MINOR DEMOLITION AND NEW CONSTRUCTION FOR AN ADDITION TO THE 8 SOS BUILDING 90145. THE ADDITION IS A ONE STORY, SLAB ON GRADE WITH SCORED, SPLIT FACES LOW AND END WALLS MATCHING THE EXISTING BUILDINGON A PRE-ENGINEERED METAL BUILDI
Nov 26, 2024P00002$-10.1KTHE WORK INCLUDES MINOR DEMOLITION AND NEW CONSTRUCTION FOR AN ADDITION TO THE 8 SOS BUILDING 90145. THE ADDITION IS A ONE STORY, SLAB ON GRADE WITH SCORED, SPLIT FACES LOW AND END WALLS MATCHING THE EXISTING BUILDINGON A PRE-ENGINEERED METAL BUILDI

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.