Federal contract award

FA441723C0016

INSTALL EMERGENCY GENERATORS MULTI BUILDINGS HURLBURT FIELD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4417 1 SOCONS
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$1.7M
Current contract value$1.7M
Potential contract value / ceiling$1.7M
Start dateOct 16, 2023
Current end dateOct 31, 2025
Potential end dateOct 31, 2025
Latest award activityAug 6, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 6, 2025P00006$42.0KREPAIR GENERATORS MULTI PROJECT INCLUDES PROVIDING ELECTRICAL WORK TO REPLACE EXISTING EMERGENCY GENERATOR SYSTEMS. REMOVAL/ DISPOSAL OF EXISTING GENERATOR SETS AND AUTOMATIC TRANSFER SWITCHES THAT DO NOT COMPLY WITH UFC REQUIREMENTS, WITH EXISTING A
Mar 14, 2025P00005$0REPAIR GENERATORS MULTI PROJECT INCLUDES PROVIDING ELECTRICAL WORK TO REPLACE EXISTING EMERGENCY GENERATOR SYSTEMS. REMOVAL/ DISPOSAL OF EXISTING GENERATOR SETS AND AUTOMATIC TRANSFER SWITCHES THAT DO NOT COMPLY WITH UFC REQUIREMENTS, WITH EXISTINGA
Jan 22, 2025P00004$0REPAIR GENERATORS MULTI PROJECT INCLUDES PROVIDING ELECTRICAL WORK TO REPLACE EXISTING EMERGENCY GENERATOR SYSTEMS. REMOVAL/ DISPOSAL OF EXISTING GENERATOR SETS AND AUTOMATIC TRANSFER SWITCHES THAT DO NOT COMPLY WITH UFC REQUIREMENTS, WITH EXISTINGA
Oct 29, 2024P00003$0REPAIR GENERATORS MULTI PROJECT INCLUDES PROVIDING ELECTRICAL WORK TO REPLACE EXISTING EMERGENCY GENERATOR SYSTEMS. REMOVAL/ DISPOSAL OF EXISTING GENERATOR SETS AND AUTOMATIC TRANSFER SWITCHES THAT DO NOT COMPLY WITH UFC REQUIREMENTS, WITH EXISTINGA

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.