Federal contract award

FA441723F0320

REPAIR SEWERAGE LIFT STATION 90027

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4417 1 SOCONS
NAICS237310 — Highway, Street, and Bridge Construction
PSC4510 — Plumbing Fixtures and Accessories
Parent award / vehicleFA441721D0003
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$485.9K
Current contract value$485.9K
Potential contract value / ceiling$485.9K
Start dateSep 12, 2023
Current end dateFeb 20, 2026
Potential end dateFeb 20, 2026
Latest award activityFeb 9, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 9, 2026P00008$0THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
Dec 18, 2025P00007$0THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
Nov 19, 2025P00006$0THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
Oct 14, 2025P00005$0THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
Aug 20, 2025P00004$0THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
Jul 31, 2025P00003$5.1KTHE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
Jan 17, 2025P00002$67.1KTHE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER