Federal contract award

FA441725P0014

THE CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, TRAVEL, MATERIALS, TOOLS, EQUIPMENT, AND OTHER ITEMS NECESSARY TO INSTALL TWO (2), 3-TON PACKAGED HVAC UNITS AND ONE (1) FOUR (4) INCH FERROUS ELECTRICAL METALLIC TUBING (EMT) CONDUIT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4417 1 SOCONS
NAICS333415 — Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
PSC4120 — Air Conditioning Equipment
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$41.9K
Current contract value$41.9K
Potential contract value / ceiling$41.9K
Start dateMar 6, 2025
Current end dateMar 31, 2026
Potential end dateMar 31, 2026
Latest award activityMar 26, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 26, 2025P00002$0THE CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, TRAVEL, MATERIALS, TOOLS, EQUIPMENT, AND OTHER ITEMS NECESSARY TO INSTALL TWO (2), 3-TON PACKAGED HVAC UNITS AND ONE (1) FOUR (4) INCH FERROUS ELECTRICAL METALLIC TUBING (EMT) CONDUIT.
Mar 4, 2025P00001$2.1KTHE CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, TRAVEL, MATERIALS, TOOLS, EQUIPMENT, AND OTHER ITEMS NECESSARY TO INSTALL TWO (2), 3-TON PACKAGED HVAC UNITS AND ONE (1) FOUR (4) INCH FERROUS ELECTRICAL METALLIC TUBING (EMT) CONDUIT.
Jan 2, 20250$39.8KTHE CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, TRAVEL, MATERIALS, TOOLS, EQUIPMENT, AND OTHER ITEMS NECESSARY TO INSTALL TWO (2), 3-TON PACKAGED HVAC UNITS AND ONE (1) FOUR (4) INCH FERROUS ELECTRICAL METALLIC TUBING (EMT) CONDUIT.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.