Federal contract award

FA441824F0137

THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN THE REPAIR/REPLACEMENT METHOD FOR THE PAVEMENT SECTION BETWEEN RUNWAY 03-21 AND 15-33 TO INCLUDE ALL AIRFIELD LIGHTING AND MARKING WHILE KEEPING THE JOINT AIRFIELD OPERATIONS IMPACT MINIMALIZED.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4418 628 CONS PK
NAICS541330 — Engineering Services
PSCZ2BD — REPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS
Parent award / vehicleFA441822D0006
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$936.5K
Current contract value$936.5K
Potential contract value / ceiling$936.5K
Start dateSep 12, 2024
Current end dateNov 18, 2025
Potential end dateNov 18, 2025
Latest award activityAug 29, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 29, 2025P00002$0THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN THE REPAIR/REPLACEMENT METHOD FOR THE PAVEMENT SECTION BETWEEN RUNWAY 03-21 AND 15-33 TO INCLUDE ALL AIRFIELD LIGHTING AND MARKING WHILE KEEPING THE JOINT AIRFIELD OPERATIONS IMPACT MINIMALIZED.
Sep 16, 2024P00001$0THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN THE REPAIR/REPLACEMENT METHOD FOR THE PAVEMENT SECTION BETWEEN RUNWAY 03-21 AND 15-33 TO INCLUDE ALL AIRFIELD LIGHTING AND MARKING WHILE KEEPING THE JOINT AIRFIELD OPERATIONS IMPACT MINIMALIZED.
Sep 12, 20240$936.5KTHE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN THE REPAIR/REPLACEMENT METHOD FOR THE PAVEMENT SECTION BETWEEN RUNWAY 03-21 AND 15-33 TO INCLUDE ALL AIRFIELD LIGHTING AND MARKING WHILE KEEPING THE JOINT AIRFIELD OPERATIONS IMPACT MINIMALIZED.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.