Federal contract award

FA441924P0027

ALTUS AFB REQUIRES A FEASIBILITY STUDY AND DEVELOPMENT OF A GROUND SOURCE HEAT PUMP (GSHP) UTILITY SYSTEM MASTER PLAN TO EVENTUALLY SERVE ALL FACILITIES.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4419 97 CONF CC
NAICS541490 — Other Specialized Design Services
PSCC1PB — ARCHITECT AND ENGINEERING- CONSTRUCTION: EXHIBIT DESIGN (NON-BUILDING)
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$286.6K
Current contract value$286.6K
Potential contract value / ceiling$286.6K
Start dateMay 1, 2024
Current end dateFeb 28, 2025
Potential end dateFeb 28, 2025
Latest award activityDec 25, 2024
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 25, 2024P00001$0ALTUS AFB REQUIRES A FEASIBILITY STUDY AND DEVELOPMENT OF A GROUND SOURCE HEAT PUMP (GSHP) UTILITY SYSTEM MASTER PLAN TO EVENTUALLY SERVE ALL FACILITIES.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.