Federal contract award

FA442724P0088

60MXS/CORROSION CONTROL SECTION HAS A REQUIREMENT FOR A CLIMATE-CONTROLLED OUTDOOR PAINT STORAGE LOCKER TO ENSURE THAT CHEMICALS ARE MAINTAINED AT A TEMPERATURE CONSISTENT WITH MANUFACTURES RECOMMENDED SPECIFICATIONS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4427 60 CONS LGC
NAICS332311 — Prefabricated Metal Building and Component Manufacturing
PSC5410 — Prefabricated and Portable Buildings
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$58.9K
Current contract value$58.9K
Potential contract value / ceiling$58.9K
Start dateJul 30, 2024
Current end dateJan 15, 2025
Potential end dateJan 15, 2025
Latest award activityOct 21, 2024
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Oct 21, 2024P00001$060MXS/CORROSION CONTROL SECTION HAS A REQUIREMENT FOR A CLIMATE-CONTROLLED OUTDOOR PAINT STORAGE LOCKER TO ENSURE THAT CHEMICALS ARE MAINTAINED AT A TEMPERATURE CONSISTENT WITH MANUFACTURES RECOMMENDED SPECIFICATIONS.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.