Federal contract award

FA452825F0053

PROVIDE ALL PLANT, LABOR, EQUIPMENT, SUPERVISION, SERVICES, FUEL, AND MATERIALS NECESSARY TO REMOVE AND REPAIR THE EXISTING CENTER MAINTENANCE RAIL, BASE PLATE, TURNTABLE ASSEMBLY, AND DEMOLISH AND EXCAVATE THE CONCRETE SLAB AND SOIL BENEATH.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4528 5 CONS
NAICS236220 — Commercial and Institutional Building Construction
PSCY1BF — CONSTRUCTION OF MISSILE SYSTEM FACILITIES
Parent award / vehicleFA452820D0002
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$802.9K
Current contract value$802.9K
Potential contract value / ceiling$1.4M
Start dateOct 7, 2025
Current end dateJul 16, 2026
Potential end dateJul 16, 2026
Latest award activityApr 30, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 30, 2026P00002$0PROVIDE ALL PLANT, LABOR, EQUIPMENT, SUPERVISION, SERVICES, FUEL, AND MATERIALS NECESSARY TO REMOVE AND REPAIR THE EXISTING CENTER MAINTENANCE RAIL, BASE PLATE, TURNTABLE ASSEMBLY, AND DEMOLISH AND EXCAVATE THE CONCRETE SLAB AND SOIL BENEATH.
Sep 24, 2025P00001$177.8KPROVIDE ALL PLANT, LABOR, EQUIPMENT, SUPERVISION, SERVICES, FUEL, AND MATERIALS NECESSARY TO REMOVE AND REPAIR THE EXISTING CENTER MAINTENANCE RAIL, BASE PLATE, TURNTABLE ASSEMBLY, AND DEMOLISH AND EXCAVATE THE CONCRETE SLAB AND SOIL BENEATH.
Sep 11, 20250$625.1KPROVIDE ALL PLANT, LABOR, EQUIPMENT, SUPERVISION, SERVICES, FUEL, AND MATERIALS NECESSARY TO REMOVE AND REPAIR THE EXISTING CENTER MAINTENANCE RAIL, BASE PLATE, TURNTABLE ASSEMBLY, AND DEMOLISH AND EXCAVATE THE CONCRETE SLAB AND SOIL BENEATH.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.