Federal contract award
FA460025P0083
DEVELOP A STUDY AND ACCOMPANYING PLAN THAT DETAILS THE EXISTING CONDITION OF THE MINUTEMAN I AND TRIDENT II MISSILES AND THE SEQUENCE OF ACTIONS REQUIRED TO REMOVE, TRANSPORT, REINSTALL, AND REFURBISH THE MISSILES FROM THEIR CURRENT LOCATION.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA4600 55 CONS PKP |
| NAICS | 541690 — Other Scientific and Technical Consulting Services |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $192.6K |
| Current contract value | $192.6K |
| Potential contract value / ceiling | $192.6K |
| Start date | Sep 30, 2025 |
| Current end date | Feb 6, 2026 |
| Potential end date | Feb 6, 2026 |
| Latest award activity | Jan 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jan 27, 2026 | P00002 | $0 | DEVELOP A STUDY AND ACCOMPANYING PLAN THAT DETAILS THE EXISTING CONDITION OF THE MINUTEMAN I AND TRIDENT II MISSILES AND THE SEQUENCE OF ACTIONS REQUIRED TO REMOVE, TRANSPORT, REINSTALL, AND REFURBISH THE MISSILES FROM THEIR CURRENT LOCATION. |
| Dec 22, 2025 | P00001 | $0 | DEVELOP A STUDY AND ACCOMPANYING PLAN THAT DETAILS THE EXISTING CONDITION OF THE MINUTEMAN I AND TRIDENT II MISSILES AND THE SEQUENCE OF ACTIONS REQUIRED TO REMOVE, TRANSPORT, REINSTALL, AND REFURBISH THE MISSILES FROM THEIR CURRENT LOCATION. |
| Sep 30, 2025 | 0 | $192.6K | DEVELOP A STUDY AND ACCOMPANYING PLAN THAT DETAILS THE EXISTING CONDITION OF THE MINUTEMAN I AND TRIDENT II MISSILES AND THE SEQUENCE OF ACTIONS REQUIRED TO REMOVE, TRANSPORT, REINSTALL, AND REFURBISH THE MISSILES FROM THEIR CURRENT LOCATION. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.